← Back
One story - permanent living quarter
37 MALLORY AVENUE
STATEN ISLAND · BIN 5047572
💬 Discuss this project
1950Year Built
1Stories
A2Building Class
R3-1Zoning
1,111 sfGross Floor Area
1Units
One story - permanent living quarter · 4,000 sf lot · 0.28 FAR built · Flood zone X
Locations of Work
Electrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC108/11/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor108/20/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272108/11/2026
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Inspection (1)Special Inspection (5)
08/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/18/2026
Permit issued — Solar
S01443532-I1-SL
08/11/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01443532-I1
08/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/11/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
08/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
08/10/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
08/10/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNRUN INSTALLATION SVC08/18/2026
1 project · most recent 08/11/2026
FiledStatusContractorScope
08/11/2026CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 08/11/2026
FiledStatusContractorScope
08/11/2026Permit IssuedSUNRUN INSTALLATION SVC16 panels, 7.2 kw, 168 roof_area_sqft
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/11/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/11/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
08/10/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/10/2026Energy Code Compliance InspectionsWalid Abdullaprogress
08/10/2026FinalWalid Abdullaprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026S01443532-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/24/2026S01443532-I1Open ↗
08/24/2026S01443532-I1Open ↗
08/24/2026S01443532-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026S01443532-I1Open ↗
08/24/2026S01443532-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026S01443532-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026S01443532-I1Open ↗