← Back
Two stories - detached, small or mid-size
58 BEAR STREET
STATEN ISLAND · BIN 5048856
💬 Discuss this project
1960Year Built
2Stories
A1Building Class
R3XZoning
2,982 sfGross Floor Area
1Units
0 Open Violations
Two stories - detached, small or mid-size · 5,000 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
Roof2p · 1 filing · 13 docs
Floor 2Under Construction16p · 2 filings · 20 docs
Floor 1Under Construction16p · 3 filings · 20 docs
CellarUnder Construction16p · 3 filings · 20 docs
4 jobs · most recent 11/19/2024
General Wiring
FiledStatusContractorScope
11/19/2024CompleteALLRAN ELECTRIC OF NY LLCGeneral Wiring
11/19/2024CompleteALLRAN ELECTRIC OF NY LLCGeneral Wiring
11/24/2021CompleteALLRAN ELECTRIC OF NY LLC—
10/20/2021CompleteALLRAN ELECTRIC OF NY LLC—
Building Lifecycle
All (75)Filed (10)Permit Issued (15)Signed Off (3)Violation (4)Inspection (7)Objection (6)Special Inspection (30)
05/18/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/18/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/09/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/17/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/17/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/19/2025
Permit issued — General Construction
S00478042-I1-GC
05/16/2025
Permit issued — General Construction
S00478042-I1-GC
03/04/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/26/2025
Signed off — Alteration
S00499777-I1
02/26/2025
Signed off — Alteration
PROPOSED INTERIOR RENOVATION ON CEL, 1ST THRU. 2ND FLOOR. PLUMBING & GAS WORKS AS PER PLAN. GENERAL CONSTRUCNTION WORK UNDER JOB #: S00478042. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
S00500735-I1
12/23/2024
Signed off — Alteration
THIS APPLICATION IS FILED TO ADD CONSTRUCTION FENCE WORK IN CONJUNCTION WITH D.O.B. ALT-I APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00484929-I1
11/25/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
11/25/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
JIAN DENG
11/25/2024
Special inspection requirement — Concrete - Cast-In-Place
JIAN DENG
11/25/2024
Special inspection requirement — Subgrade Inspections
JIAN DENG
11/25/2024
Special inspection requirement — Chimneys and vents
ALEXANDER JIMENEZ
11/25/2024
Special inspection requirement — Masonry
JIAN DENG
11/25/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
JIAN DENG
11/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
11/25/2024
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
11/25/2024
Special inspection requirement — Fire-Resistance Rated Construction
JIAN DENG
11/25/2024
Special inspection requirement — Maintenance information
JIAN DENG
11/25/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
JIAN DENG
11/25/2024
Special inspection requirement — Fenestration areas
JIAN DENG
11/25/2024
Special inspection requirement — Air barrier - visual inspection
JIAN DENG
11/25/2024
Special inspection requirement — Fenestration air leakage
JIAN DENG
11/25/2024
Special inspection requirement — Interior lighting power
JIAN DENG
11/25/2024
Special inspection requirement — Insulation placement and R values
JIAN DENG
11/25/2024
Special inspection requirement — Protection of exposed foundation insulation
JIAN DENG
11/25/2024
Special inspection requirement — Permanent certificate
JIAN DENG
11/25/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JIAN DENG
11/22/2024
Objection resolved — Addressed
09/26/2024
Objection raised — Scope
09/18/2024
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
09/18/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JIAN DENG
09/18/2024
Special inspection requirement — HVAC-R and service water heating equipment
JIAN DENG
09/18/2024
Special inspection requirement — HVAC-R and service water heating system controls
JIAN DENG
09/18/2024
Special inspection requirement — Maintenance information
JIAN DENG
09/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
09/17/2024
Filed — Alteration CO
PROPOSED HORIZONTAL & VERTICAL ENLARGEMENT OF EXISTING 1-FAMILY HOUSE WITH GENERAL CONSTRUCTION WORK AS PER PLAN. OBTAIN NEW C/O.
S00478042-P2
09/16/2024
Filed — Alteration
PROPOSED INTERIOR RENOVATION ON CEL, 1ST THRU. 2ND FLOOR. PLUMBING & GAS WORKS AS PER PLAN. GENERAL CONSTRUCNTION WORK UNDER JOB #: S00478042. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
S00500735-P1
09/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
JIAN DENG
09/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
09/16/2024
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
09/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JIAN DENG
06/21/2024
Permit issued — Plumbing
S00500735-I1-PL
05/03/2024
Permit issued — General Construction
S00478042-I1-GC
04/21/2023
Permit issued — General Construction
S00478042-I1-GC
02/03/2023
Permit issued — General Construction
S00478042-I1-GC
01/04/2023
Permit issued — Plumbing
S00500735-I1-PL
09/03/2022
Filed — Alteration
THIS APPLICATION IS FILED TO ADD CONSTRUCTION FENCE WORK IN CONJUNCTION WITH D.O.B. ALT-I APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00484929-P1
05/20/2022
Permit issued — Construction Fence
S00484929-I1-FN
05/09/2022
Violation issued (ECB, closed)
Construction
01/25/2022
Permit issued — General Construction
S00478042-I1-GC
11/29/2021
Permit issued — General Construction
S00478042-I1-GC
10/20/2021
Violation issued (ECB, closed)
Unknown
09/15/2021
Permit issued — General Construction
S00478042-I1-GC
09/15/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/09/2021
Permit issued — General Construction
S00478042-I1-GC
Latest 60 of 75 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
I H1 CONSTRUCTION103/22/2026
SD DESIGN STUDIO803/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JIMENEZ BUILDING CONSULTING LLC609/17/2024
BASIC GROUPS CORP205/20/2021
YANG ENGINEERING LLC204/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JRL SKYLINE1203/21/2026
SD DESIGN STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KEJDI CORPGeneral Contractor1707/08/2026
ABA INNOVATIVE BUILDERS IGeneral Contractor507/08/2026
PIPESTYLISTS, INCPlumbing307/08/2026
I.H 1 CONSTRUCTION CORPGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JIAN ENGINEERING PLLC7397709/17/2024
JIMENEZ BUILDING CONSULTI7944309/17/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedKEJDI CORP05/19/2025
DOB NOWGeneral ConstructionPermit IssuedKEJDI CORP05/16/2025
DOB NOWPlumbingSigned-offT & T PLUMBING INC06/21/2024
DOB NOWGeneral ConstructionPermit IssuedKEJDI CORP05/03/2024
DOB NOWGeneral ConstructionPermit IssuedKEJDI CORP04/21/2023
DOB NOWGeneral ConstructionPermit IssuedKEJDI CORP02/03/2023
DOB NOWPlumbingSigned-offT & T PLUMBING INC01/04/2023
DOB NOWConstruction FenceSigned-offABA INNOVATIVE BUILDERS I05/20/2022
DOB NOWGeneral ConstructionPermit IssuedABA INNOVATIVE BUILDERS I01/25/2022
DOB NOWGeneral ConstructionPermit IssuedABA INNOVATIVE BUILDERS I11/29/2021
DOB NOWGeneral ConstructionPermit IssuedKEJDI CORP09/15/2021
DOB NOWGeneral ConstructionPermit IssuedKEJDI CORP09/09/2021
DOB NOWStructuralSigned-offI.H 1 CONSTRUCTION CORP04/20/2021
DOB NOWPlumbingSigned-offT & T PLUMBING INC04/16/2021
DOB NOWConstruction FenceSigned-offI.H 1 CONSTRUCTION CORP03/22/2021
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
05/18/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/18/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/09/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/17/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/04/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
11/25/2024Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
11/25/2024Excavations - Sheeting, Shoring, and BracingJIAN DENGspecial
11/25/2024Concrete - Cast-In-PlaceJIAN DENGspecial
11/25/2024Subgrade InspectionsJIAN DENGspecial
11/25/2024Chimneys and ventsALEXANDER JIMENEZspecial
11/25/2024MasonryJIAN DENGspecial
11/25/2024Structural Stability – Alterations of existing buildingsJIAN DENGspecial
11/25/2024Fire-Resistant Penetrations and JointsJIAN DENGspecial
11/25/2024Energy Code Compliance InspectionsJIAN DENGprogress
11/25/2024Fire-Resistance Rated ConstructionJIAN DENGprogress
11/25/2024Maintenance informationJIAN DENGenergy_progress
11/25/2024Fenestration and door U-factor and product ratingsJIAN DENGenergy_progress
11/25/2024Fenestration areasJIAN DENGenergy_progress
11/25/2024Air barrier - visual inspectionJIAN DENGenergy_progress
11/25/2024Fenestration air leakageJIAN DENGenergy_progress
11/25/2024Interior lighting powerJIAN DENGenergy_progress
11/25/2024Insulation placement and R valuesJIAN DENGenergy_progress
11/25/2024Protection of exposed foundation insulationJIAN DENGenergy_progress
11/25/2024Permanent certificateJIAN DENGenergy_progress
11/25/2024HVAC-R and service water piping design and insulationJIAN DENGenergy_progress
09/18/2024Energy Code Compliance InspectionsJIAN DENGprogress
09/18/2024HVAC-R and service water piping design and insulationJIAN DENGenergy_progress
09/18/2024HVAC-R and service water heating equipmentJIAN DENGenergy_progress
09/18/2024HVAC-R and service water heating system controlsJIAN DENGenergy_progress
09/18/2024Maintenance informationJIAN DENGenergy_progress
Latest 25 of 59.
▾Documents — 128 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/25/2026S00484929-I1Request digital key ↗
08/25/2026S00484929-P1Request digital key ↗
08/25/2026S00499777-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
05/28/2024540213044Open ↗
02/02/2022540213044Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
06/02/2022540213044Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026S00478042-P1Open ↗
08/13/2026S00478042-P2Open ↗
08/13/2026S00478042-I1Open ↗
▸Seals & Professional Certifications71
▸DOB NOWProgress Inspector Seal & Signature36
09/12/2026S00500735-P1Open ↗
09/12/2026S00500735-P1Open ↗
09/12/2026S00500735-P1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
09/12/2026S00500735-P1Open ↗
08/28/2026S00500735-I1Open ↗
08/25/2026S00499777-P1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/25/2026S00484929-P1Open ↗
08/25/2026S00484929-I1Open ↗
08/25/2026S00478042-I1Open ↗
Showing 3 of 10 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/02/2022540213044Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/02/2022540213044Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S00478042-I1Open ↗
08/13/2026S00478042-P1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/13/2026S00478042-I1Open ↗
08/13/2026S00478042-P1Open ↗
08/13/2026S00478042-P2Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00478042-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/21/2026S00500735-I1Open ↗
08/14/2026S00478042-P1Open ↗
08/14/2026S00478042-P2Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00500735-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT3
08/13/2026S00478042-I1Open ↗
08/13/2026S00478042-P2Open ↗
08/13/2026S00478042-P1Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
02/02/2022540213044Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00478042-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00478042-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
06/02/2022540213044Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertificate of Insurance1
08/13/2026S00478042-I1Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026S00478042-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
02/02/2022540213044Open ↗
▸Other Documents17
▸BISBPP - SUPPORTING DOCUMENTATION3
06/05/2024540213044Open ↗
06/02/2022540213044Open ↗
05/12/2022540213044Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026S00478042-I1Open ↗
08/13/2026S00478042-P2Open ↗
08/13/2026S00478042-P1Open ↗
▸DOB NOWPlot Diagram3
08/13/2026S00478042-P2Open ↗
08/13/2026S00478042-P1Open ↗
08/13/2026S00478042-I1Open ↗
▸DOB NOWSURVEY: INITIAL3
08/13/2026S00478042-I1Open ↗
08/13/2026S00478042-P2Open ↗
08/13/2026S00478042-P1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026S00478042-I1Open ↗
08/13/2026S00478042-P2Open ↗
▸BISWAIVER OF CURB ALIGNEMENT1
05/12/2022540213044Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
02/02/2022540213044Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026S00478042-I1Open ↗