One story - permanent living quarter
149 HULL AVENUE
STATEN ISLAND · BIN 5051045
💬 Discuss this project
1950Year Built
1Stories
A2Building Class
R3XZoning
864 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story - permanent living quarter · 5,000 sf lot · 0.17 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralFire Protection
Permit Issued — active, not yet Signed-off
Floor 2Under Construction2p · 2 filings · 20 docs
Floor 1Under Construction1 filing · 20 docs
CellarUnder Construction1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
APRILE BONAMO FILING REP103/21/2026
A TECH ENGINEERING NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A. FONTANA & SONS LLCGeneral Contractor508/07/2026
SUPERIOR PLUMBING & HEATINGPlumbing207/08/2026
SUNRUN INSTALLATION SVCGeneral Contractor108/05/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LAWRENCE MANDARINO ARCHIT724407/28/2026
PARKER AND WEST ENGINEERI5272107/27/2026
A TECH ENGINEERING NYC, P6738109/27/2025
Building Lifecycle
All (59)Filed (8)Permit Issued (8)Signed Off (1)Violation (1)Inspection (11)Special Inspection (30)
09/03/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/18/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/06/2026
Permit issued — Curb Cut
S01180541-S3-CC
08/04/2026
Permit issued — Solar
S01422490-I1-SL
07/30/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
New plumbing systems is to be installed throughout the entire building
S01180541-S3
07/28/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
New plumbing systems is to be installed throughout the entire building
S01180541-P2
07/28/2026
Special inspection requirement — Structural Steel - Details
Lawrence Mandarino
07/28/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
07/28/2026
Special inspection requirement — Concrete - Cast-In-Place
Lawrence Mandarino
07/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Lawrence Mandarino
07/28/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Lawrence Mandarino
07/28/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Lawrence Mandarino
07/28/2026
Special inspection requirement — Subgrade Inspections
Lawrence Mandarino
07/28/2026
Special inspection requirement — Energy Code Compliance Inspections
Lawrence Mandarino
07/28/2026
Special inspection requirement — Final
Lawrence Mandarino
07/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
Lawrence Mandarino
07/28/2026
Special inspection requirement — Footing and Foundation
Lawrence Mandarino
07/28/2026
Special inspection requirement — Structural Wood Frame
Lawrence Mandarino
07/28/2026
Special inspection requirement — Air barrier - visual inspection
Lawrence Mandarino
07/28/2026
Special inspection requirement — Fenestration areas
Lawrence Mandarino
07/28/2026
Special inspection requirement — Air barrier — testing
Lawrence Mandarino
07/28/2026
Special inspection requirement — Electric vehicle service equipment requirements
Lawrence Mandarino
07/28/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Lawrence Mandarino
07/28/2026
Special inspection requirement — Insulation placement and R values
Lawrence Mandarino
07/28/2026
Special inspection requirement — Permanent certificate
Lawrence Mandarino
07/28/2026
Special inspection requirement — Fenestration air leakage
Lawrence Mandarino
07/28/2026
Special inspection requirement — Metering
Lawrence Mandarino
07/27/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01422490-I1
07/27/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
07/27/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
07/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/24/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/23/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
New plumbing systems is to be installed throughout the entire building
S01180541-S1
07/02/2026
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
06/30/2026
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
06/25/2026
Special inspection requirement — Final
Walid Abdulla
06/25/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
06/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
04/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/03/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/05/2026
Permit issued — Plumbing
S01157172-I1-PL
02/03/2026
Violation issued (ECB, closed)
Construction
01/14/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/05/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
12/29/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/16/2025
Permit issued — Plumbing
S01180541-S2-PL
10/14/2025
Permit issued — General Construction
S01180541-I1-ST
10/14/2025
Permit issued — Foundation
S01180541-I1-GC
10/14/2025
Permit issued — General Construction
S01180541-I1-FO
10/10/2025
Filed — Alteration
S01157172-I1
10/03/2025
Permit issued — Construction Fence
S01180541-S1-FN
09/27/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
New plumbing systems is to be installed throughout the entire building
S01180541-S2
09/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Lawrence Mandarino
09/27/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Lawrence Mandarino
09/27/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
anthony santoro
09/27/2025
Special inspection requirement — Permanent certificate
Lawrence Mandarino
09/26/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
New plumbing systems is to be installed throughout the entire building
S01180541-S1
08/11/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
New plumbing systems is to be installed throughout the entire building
S01180541-P1
02/14/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
New plumbing systems is to be installed throughout the entire building
S01180541-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offA. FONTANA & SONS LLC08/06/2026
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC08/04/2026
DOB NOWPlumbingSigned-offSUPERIOR PLUMBING & HEATI03/05/2026
DOB NOWPlumbingSigned-offSUPERIOR PLUMBING & HEATI12/16/2025
DOB NOWGeneral ConstructionSigned-offA. FONTANA & SONS LLC10/14/2025
DOB NOWFoundationPermit IssuedA. FONTANA & SONS LLC10/14/2025
DOB NOWGeneral ConstructionSigned-offA. FONTANA & SONS LLC10/14/2025
DOB NOWConstruction FenceSigned-offA. FONTANA & SONS LLC10/03/2025
1 job · most recent 07/30/2026
Storm Water/Sanitary
FiledStatusContractorScope
07/30/2026Signed-offSUPERIOR PLUMBING & HEATIStorm, Water/Sanitary
3 jobs · most recent 07/27/2026
General Wiring
FiledStatusContractorScope
07/27/2026CompleteSUNRUN SOLAR ELECTL CORP—
12/18/2025CompleteS.T.K. ELECTRICAL CORP.General Wiring
10/06/2025CompleteS.T.K. ELECTRICAL CORP.1 meters, 1 new_meters
1 job · most recent 07/27/2026
FiledStatusContractorScope
07/27/2026Signed-offSUNRUN INSTALLATION SVC22 panels, 9.9 kw, 463 roof_area_sqft
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
09/03/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/18/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
07/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/24/2026Fail-Final CND-Occupancy InspectionFailView ↗
07/02/2026Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
06/30/2026Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
04/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/03/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/14/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/05/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
12/29/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
07/28/2026Structural Steel - DetailsLawrence Mandarinospecial
07/28/2026Subsurface Investigations (Borings/Test Pits)anthony santorospecial
07/28/2026Concrete - Cast-In-PlaceLawrence Mandarinospecial
07/28/2026Fire-Resistant Penetrations and JointsLawrence Mandarinospecial
07/28/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationLawrence Mandarinospecial
07/28/2026Structural Stability – Alterations of existing buildingsLawrence Mandarinospecial
07/28/2026Subgrade InspectionsLawrence Mandarinospecial
07/28/2026Energy Code Compliance InspectionsLawrence Mandarinoprogress
07/28/2026FinalLawrence Mandarinoprogress
07/28/2026Fire-Resistance Rated ConstructionLawrence Mandarinoprogress
07/28/2026Footing and FoundationLawrence Mandarinoprogress
07/28/2026Structural Wood FrameLawrence Mandarinoprogress
07/28/2026Air barrier - visual inspectionLawrence Mandarinoenergy_progress
07/28/2026Fenestration areasLawrence Mandarinoenergy_progress
07/28/2026Air barrier — testing Lawrence Mandarinoenergy_progress
07/28/2026Electric vehicle service equipment requirementsLawrence Mandarinoenergy_progress
07/28/2026Fenestration and door U-factor and product ratingsLawrence Mandarinoenergy_progress
07/28/2026Insulation placement and R valuesLawrence Mandarinoenergy_progress
07/28/2026Permanent certificateLawrence Mandarinoenergy_progress
07/28/2026Fenestration air leakageLawrence Mandarinoenergy_progress
07/28/2026MeteringLawrence Mandarinoenergy_progress
07/27/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
07/27/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
06/25/2026FinalWalid Abdullaprogress
06/25/2026Energy Code Compliance InspectionsWalid Abdullaprogress
Latest 25 of 54.
▾Documents — 77 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/18/2026S01180541-P2Request digital key ↗
08/18/2026S01180541-S2Request digital key ↗
08/18/2026S01180541-S1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation2
01/03/2025540265693Open ↗
12/13/2024540265693Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
12/13/2024540265693Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram3
08/18/2026S01180541-I1Open ↗
08/18/2026S01180541-P2Open ↗
08/18/2026S01180541-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/18/2026S01180541-P2Open ↗
08/18/2026S01180541-P1Open ↗
08/18/2026S01180541-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/18/2026S01180541-P1Open ↗
08/18/2026S01180541-I1Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature11
08/29/2026S01180541-S2Open ↗
08/28/2026S01180541-P2Open ↗
08/28/2026S01180541-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/18/2026S01180541-S2Open ↗
08/18/2026S01180541-S1Open ↗
08/18/2026S01180541-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/29/2026S01180541-S2Open ↗
08/29/2026S01180541-S2Open ↗
08/28/2026S01180541-P2Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/13/2024540265693Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/13/2024540265693Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/18/2026S01180541-P1Open ↗
08/18/2026S01180541-I1Open ↗
08/18/2026S01180541-P2Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/18/2026S01180541-S2Open ↗
08/18/2026S01180541-S1Open ↗
08/18/2026S01180541-P1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT3
08/18/2026S01180541-P2Open ↗
08/18/2026S01180541-P1Open ↗
08/18/2026S01180541-I1Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
12/13/2024540265693Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/13/2024540265693Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/18/2026S01180541-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/18/2026S01180541-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
01/03/2025540265693Open ↗
12/13/2024540265693Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
12/13/2024540265693Open ↗
▸Other Documents12
▸DOB NOWSite Survey: Initial3
08/18/2026S01180541-P2Open ↗
08/18/2026S01180541-P1Open ↗
08/18/2026S01180541-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/18/2026S01180541-P1Open ↗
08/18/2026S01180541-I1Open ↗
08/18/2026S01180541-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/18/2026S01180541-P2Open ↗
08/18/2026S01180541-P1Open ↗
08/18/2026S01180541-I1Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
01/03/2025540265693Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
01/03/2025540265693Open ↗
▸DOB NOWFinal Survey1
08/18/2026S01180541-I1Open ↗