← Back
Two family brick
195 LINCOLN AVENUE
STATEN ISLAND · BIN 5051665
💬 Discuss this project
1930Year Built
2.5Stories
B1Building Class
R3XZoning
1,584 sfGross Floor Area
2Units
2 Open Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Two family brick · 4,445 sf lot · 0.36 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 06/04/2019
General Wiring
FiledStatusContractorScope
06/04/2019CompleteA&E ELECTRICAL SYSTEMS COGeneral Wiring
Building Lifecycle
All (7)Filed (2)Permit Issued (1)Violation (2)Special Inspection (2)
06/01/2022
Permit issued — General Construction
S00602243-I1-GC
04/07/2022
Filed — Alteration
JOB FILED TO REMOVE WORK WITHOUT A PERMIT VIOLATIONS IN BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY
S00602243-S1
03/10/2022
Special inspection requirement — Final
Misha Saradoff
10/22/2021
Filed — Alteration
JOB FILED TO REMOVE WORK WITHOUT A PERMIT VIOLATIONS IN BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY
S00602243-I1
10/20/2021
Special inspection requirement — Insulation placement and R values
Misha Saradoff
08/08/2019
Violation issued (ECB, open)
Construction
12/31/2015
Violation issued (ECB, open)
Construction
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
195 LINCOLN AVENUE LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EC EXPEDITING SERVICES204/07/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EC EXPEDITING AND SERVICES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMB CONSTRUCTION INCGeneral Contractor203/21/2026
A&E ELECTRICAL SYSTEMS COElectrical103/22/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedAMB CONSTRUCTION INC06/01/2022
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
03/10/2022FinalMisha Saradoffprogress
10/20/2021Insulation placement and R valuesMisha Saradoffenergy_progress
▾Documents — 5 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/24/2026S00602243-S1Request digital key ↗
08/24/2026S00602243-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/24/2026S00602243-S1Open ↗
08/24/2026S00602243-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026S00602243-I1Open ↗