← Back
Office with apartments (no commercial)
2205 HYLAN BOULEVARD
STATEN ISLAND · BIN 5051757
💬 Discuss this project
1931Year Built
2Stories
O8Building Class
R3-2Zoning
4,400 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Office with apartments (no commercial) · Owner of record: SAPPHIRE JUPITER, LLC · 6,000 sf lot · 0.73 FAR built · Flood zone AE
Locations of Work
ArchitectureMechanicalPlumbingCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 6 docs
Floor 25p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
1 job · most recent 01/05/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/05/2026Permit IssuedY & W NY CONSTRUCTION INCAir Conditioning Systems
Cooling
Mitsubishi Electric MXZ-3C24NA4 24,600 BTU · Vrf Outdoor ×1
MXZ-SUZ-KA12NA2 15,400 BTU · Heat Pump Outdoor ×1
Cooper & Hunter CH-NY18MIA-230V0 18,800 BTU · Heat Pump Outdoor ×1
Trane YCH090C3L0BE 90,000 BTU · Condensing Unit ×1
Tuttokool AAC5036E1000A 12,000 BTU · Condensing Unit ×1
1 job · most recent 03/27/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/27/2026Signed-offTRI STATE PLBG & HTG INCGas, Water/Sanitary
2 jobs · most recent 06/16/2025
General Wiring
FiledStatusContractorScope
06/16/2025CompleteKJK ELECTRIC INCGeneral Wiring
05/12/2025CompleteUNITED ELEC'L CONT'G CORP—
1 job · most recent 03/27/2026
Concrete Masonry
FiledStatusContractorScope
03/27/2026Signed-offTRI STATE PLBG & HTG INCConcrete, Masonry
1 job · most recent 03/27/2026
Fence
FiledStatusContractorScope
03/27/2026Signed-offTRI STATE PLBG & HTG INCFence
Building Lifecycle
All (57)Filed (10)Permit Issued (7)Signed Off (2)Violation (4)Inspection (9)Special Inspection (25)
07/31/2026
Signed off — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH ALT FORE RENOVATIONS WITHIN EXISTING BUILDING.
S01200036-S3
05/26/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/28/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/27/2026
Filed — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH ALT FORE RENOVATIONS WITHIN EXISTING BUILDING.
S01200036-P5
02/27/2026
Filed — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH ALT FORE RENOVATIONS WITHIN EXISTING BUILDING.
S01200036-P3
02/27/2026
Filed — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH ALT FORE RENOVATIONS WITHIN EXISTING BUILDING.
S01200036-P4
02/20/2026
Special inspection requirement — Concrete - Cast-In-Place
PHILIP HOLLNSTEINER
02/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
PHILIP HOLLNSTEINER
02/20/2026
Special inspection requirement — Masonry
PHILIP HOLLNSTEINER
02/20/2026
Special inspection requirement — Subgrade Inspections
PHILIP HOLLNSTEINER
02/20/2026
Special inspection requirement — Energy Code Compliance Inspections
PHILIP HOLLNSTEINER
02/20/2026
Special inspection requirement — Final
PHILIP HOLLNSTEINER
02/20/2026
Special inspection requirement — Fire-Resistance Rated Construction
PHILIP HOLLNSTEINER
02/20/2026
Special inspection requirement — Footing and Foundation
PHILIP HOLLNSTEINER
02/20/2026
Special inspection requirement — Structural Wood Frame
PHILIP HOLLNSTEINER
02/20/2026
Special inspection requirement — Electrical motors and elevators
SIMON JIANG
02/20/2026
Special inspection requirement — Exterior lighting power
PHILIP HOLLNSTEINER
02/20/2026
Special inspection requirement — Lighting controls
PHILIP HOLLNSTEINER
02/20/2026
Special inspection requirement — Interior lighting power
PHILIP HOLLNSTEINER
02/20/2026
Special inspection requirement — Permanent certificate
SIMON JIANG
02/20/2026
Special inspection requirement — Fenestration air leakage
PHILIP HOLLNSTEINER
02/20/2026
Special inspection requirement — Air barrier - visual inspection
PHILIP HOLLNSTEINER
02/20/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
PHILIP HOLLNSTEINER
02/20/2026
Special inspection requirement — Maintenance information
PHILIP HOLLNSTEINER
02/20/2026
Special inspection requirement — Fenestration areas
PHILIP HOLLNSTEINER
02/20/2026
Special inspection requirement — Insulation placement and R values
PHILIP HOLLNSTEINER
02/04/2026
Permit issued — Mechanical Systems
S01338680-I1-MS
01/28/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/20/2026
Permit issued — Boiler Equipment
S01200036-S3-BE
01/07/2026
Filed — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH ALT FORE RENOVATIONS WITHIN EXISTING BUILDING.
S01200036-S3
01/05/2026
Filed — Alteration
Install new HVAC units at the roof. No change in use, egress or occupancy under this application.
S01338680-I1
01/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
YING HAO LI
01/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
YING HAO LI
01/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
YING HAO LI
12/22/2025
Special inspection requirement — Mechanical Systems
YING HAO LI
12/22/2025
Special inspection requirement — Final
YING HAO LI
12/05/2025
Permit issued — Plumbing
S01200036-S2-PL
12/02/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/26/2025
Violation issued (HPD, closed)
I
11/19/2025
Signed off — Alteration
INSTALL NEW NON-ILLUMINATED SIGN READ "NY NEUROCARE MEDICAL SERVICES" AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
S01306720-I1
11/18/2025
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
11/10/2025
Permit issued — Sign
S01306720-I1-SG
10/29/2025
Filed — Alteration
INSTALL NEW NON-ILLUMINATED SIGN READ "NY NEUROCARE MEDICAL SERVICES" AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
S01306720-I1
07/23/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/08/2025
Permit issued — Plumbing
S01200036-S2-PL
06/11/2025
Permit issued — General Construction
S01200036-I1-GC-CX
05/01/2025
Permit issued — Construction Fence
S01200036-S1-FN
04/14/2025
Filed — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH ALT FORE RENOVATIONS WITHIN EXISTING BUILDING.
S01200036-S2
04/14/2025
Filed — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH ALT FORE RENOVATIONS WITHIN EXISTING BUILDING.
S01200036-P1
04/10/2025
Filed — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH ALT FORE RENOVATIONS WITHIN EXISTING BUILDING.
S01200036-S1
04/09/2025
Filed — Alteration
PLUMBING APPLICATION FILED IN CONJUNCTION WITH ALT FORE RENOVATIONS WITHIN EXISTING BUILDING.
S01200036-I1
05/03/2010
Violation issued (ECB, closed)
Unknown
10/28/2009
Violation issued (ECB, closed)
Construction
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CONTEMPO DEVELOPMENT103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROGERS CALVANICO GROUP PLLC803/27/2026
CITY BUILDING NY ARCHITECT P.C.101/05/2026
FARHAD BASSIRI-TEHRANI110/29/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GENESIS NYC CONSTRUCTIONGeneral Contractor404/09/2026
TRI STATE PLBG & HTG INCPlumbing307/08/2026
Y & W NY CONSTRUCTION INCGeneral Contractor104/09/2026
NEPTUNE SIGNS AWNINGSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROGERS CALVANICO GROUP PL1324302/27/2026
CITY BUILDING NY ARCHITEC1394101/05/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedY & W NY CONSTRUCTION INC02/04/2026
DOB NOWBoiler EquipmentSigned-offDW PLUMBING INC01/20/2026
DOB NOWPlumbingSigned-offDW PLUMBING INC12/05/2025
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC11/10/2025
DOB NOWPlumbingSigned-offDW PLUMBING INC07/08/2025
DOB NOWGeneral ConstructionSigned-offGENESIS NYC CONSTRUCTION06/11/2025
DOB NOWConstruction FencePermit IssuedGENESIS NYC CONSTRUCTION05/01/2025
BISMHISSUEDCONTEMPO DEVELOPMENT LLC06/16/2000
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
05/26/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/28/2026Pass-Final General Construction Non-Directive 14PassView ↗
01/28/2026Pass-Final Boiler Equipment InspectionPassView ↗
01/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/02/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/18/2025Pass-Final Sign Permit InspectionPassView ↗
07/23/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/23/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
02/20/2026Concrete - Cast-In-PlacePHILIP HOLLNSTEINERspecial
02/20/2026Fire-Resistant Penetrations and JointsPHILIP HOLLNSTEINERspecial
02/20/2026MasonryPHILIP HOLLNSTEINERspecial
02/20/2026Subgrade InspectionsPHILIP HOLLNSTEINERspecial
02/20/2026Energy Code Compliance InspectionsPHILIP HOLLNSTEINERprogress
02/20/2026FinalPHILIP HOLLNSTEINERprogress
02/20/2026Fire-Resistance Rated ConstructionPHILIP HOLLNSTEINERprogress
02/20/2026Footing and FoundationPHILIP HOLLNSTEINERprogress
02/20/2026Structural Wood FramePHILIP HOLLNSTEINERprogress
02/20/2026Electrical motors and elevatorsSIMON JIANGenergy_progress
02/20/2026Exterior lighting powerPHILIP HOLLNSTEINERenergy_progress
02/20/2026Lighting controlsPHILIP HOLLNSTEINERenergy_progress
02/20/2026Interior lighting powerPHILIP HOLLNSTEINERenergy_progress
02/20/2026Permanent certificateSIMON JIANGenergy_progress
02/20/2026Fenestration air leakagePHILIP HOLLNSTEINERenergy_progress
02/20/2026Air barrier - visual inspectionPHILIP HOLLNSTEINERenergy_progress
02/20/2026Fenestration and door U-factor and product ratingsPHILIP HOLLNSTEINERenergy_progress
02/20/2026Maintenance informationPHILIP HOLLNSTEINERenergy_progress
02/20/2026Fenestration areasPHILIP HOLLNSTEINERenergy_progress
02/20/2026Insulation placement and R valuesPHILIP HOLLNSTEINERenergy_progress
01/05/2026HVAC-R and service water heating system controlsYING HAO LIenergy_progress
01/05/2026HVAC-R and service water piping design and insulationYING HAO LIenergy_progress
01/05/2026HVAC-R and service water heating equipmentYING HAO LIenergy_progress
12/22/2025Mechanical SystemsYING HAO LIspecial
12/22/2025FinalYING HAO LIprogress
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/19/2026S01200036-P4Request digital key ↗
08/19/2026S01200036-P3Request digital key ↗
08/19/2026S01200036-S3Request digital key ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/19/2026S01200036-P1Open ↗
08/19/2026S01200036-S2Open ↗
08/19/2026S01200036-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026S01338680-I1Open ↗
09/23/2026S01338680-I1Open ↗
08/31/2026S01200036-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026S01338680-I1Open ↗
08/31/2026S01200036-P3Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/19/2026S01200036-P1Open ↗
08/19/2026S01200036-S2Open ↗
08/19/2026S01200036-I1Open ↗
Showing 3 of 8 on file for this type