← Back
Miscellaneous two family
39 HYLAN PLACE
STATEN ISLAND · BIN 5051764
💬 Discuss this project
1930Year Built
2Stories
B9Building Class
R3XZoning
1,536 sfGross Floor Area
2Units
Miscellaneous two family · Owner of record: 39 WEI HOLDINGS INC · 1,975 sf lot · 0.78 FAR built · Flood zone X500
Locations of Work
Architecture
Floor 21p · 1 filing · 20 docs
Floor 1
Cellar2p · 1 filing · 20 docs
1 job · most recent 06/23/2026
FiledStatusContractorScope
06/23/2026Permit IssuedVOLTRON ELECTRIC LLC3 meters, 1 new_meters
Building Lifecycle
All (21)Filed (5)Permit Issued (2)Signed Off (2)Inspection (5)Special Inspection (7)
03/13/2026
Signed off — Alteration
INSTALL 1 NEW BOILER, 1 HWH, AND 1 GAS METER IN CELLAR. PLUMBING WORK AS PER PLANS. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
S01214661-S1
02/13/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/12/2026
Signed off — Alteration
INSTALL 1 NEW BOILER, 1 HWH, AND 1 GAS METER IN CELLAR. PLUMBING WORK AS PER PLANS. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
S01214661-I1
02/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
02/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
02/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
02/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
02/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
02/03/2026
Filed — Alteration
INSTALL 1 NEW BOILER, 1 HWH, AND 1 GAS METER IN CELLAR. PLUMBING WORK AS PER PLANS. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
S01214661-P3
01/29/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/05/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/10/2025
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
10/03/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/16/2025
Filed — Alteration
INSTALL 1 NEW BOILER, 1 HWH, AND 1 GAS METER IN CELLAR. PLUMBING WORK AS PER PLANS. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
S01214661-P2
09/02/2025
Special inspection requirement — Final
Eric Sun
09/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
08/29/2025
Filed — Alteration
INSTALL 1 NEW BOILER, 1 HWH, AND 1 GAS METER IN CELLAR. PLUMBING WORK AS PER PLANS. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
S01214661-P1
05/01/2025
Permit issued — Plumbing
S01214661-S1-PL
04/29/2025
Permit issued — General Construction
S01214661-I1-GC
04/25/2025
Filed — Alteration
INSTALL 1 NEW BOILER, 1 HWH, AND 1 GAS METER IN CELLAR. PLUMBING WORK AS PER PLANS. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
S01214661-S1
04/25/2025
Filed — Alteration
INSTALL 1 NEW BOILER, 1 HWH, AND 1 GAS METER IN CELLAR. PLUMBING WORK AS PER PLANS. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
S01214661-I1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIC 88 CORP502/03/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOP BUILD CONTRACTORS INCGeneral Contractor104/09/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC 88 CORP8371302/03/2026
NIC DESIGN INC9758204/25/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.05/01/2025
DOB NOWGeneral ConstructionSigned-offTOP BUILD CONTRACTORS INC04/29/2025
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/13/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/29/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/05/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/10/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
10/03/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
02/06/2026Energy Code Compliance InspectionsEric Sunprogress
02/06/2026HVAC-R and service water heating system controlsEric Sunenergy_progress
02/06/2026HVAC-R and service water piping design and insulationEric Sunenergy_progress
02/06/2026Fire-Resistant Penetrations and JointsEric Sunspecial
02/06/2026HVAC-R and service water heating equipmentEric Sunenergy_progress
09/02/2025FinalEric Sunprogress
09/02/2025Fire-Resistant Penetrations and JointsEric Sunspecial
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/18/2026S01214661-P2Request digital key ↗
08/18/2026S01214661-P1Request digital key ↗
08/18/2026S01214661-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/18/2026S01214661-P1Open ↗
08/18/2026S01214661-I1Open ↗
08/18/2026S01214661-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026S01214661-I1Open ↗
08/24/2026S01214661-S1Open ↗
08/24/2026S01214661-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026S01214661-I1Open ↗
08/24/2026S01214661-S1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/18/2026S01214661-P1Open ↗
08/18/2026S01214661-S1Open ↗
08/18/2026S01214661-P3Open ↗
Showing 3 of 5 on file for this type