← Back
Two family converted from one family
118 BACHE AVENUE
STATEN ISLAND · New Dorp-Midland Beach · BIN 5052740
💬 Discuss this project
1930Year Built
2Stories
B3Building Class
R3XZoning
1,592 sfGross Floor Area
2Units
Two family converted from one family · 4,000 sf lot · 0.4 FAR built · Flood zone X
Locations of Work
PlumbingGeneral
Floor 21p · 1 filing · 8 docs
Floor 11p · 1 filing · 8 docs
Cellar2p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LAMEX LLC503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NYC DESIGN BUILD ARCHITECTURE104/13/2022
BUDAY & SCHUSTER ARCHITECTS, LLP209/14/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A+ EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RICHMOND P & H CO., INCPlumbing207/08/2026
PLUMBING NYC INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RELIANCE ENGINEERING, P.C322104/13/2022
Building Lifecycle
All (29)Filed (3)Permit Issued (3)Signed Off (2)Inspection (8)Objection (8)Special Inspection (5)
01/11/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/18/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/12/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/12/2022
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
09/07/2022
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
08/24/2022
Permit issued — Plumbing
S00697468-I1-PL
04/26/2022
Special inspection requirement — Final
Ralph Giorgio
04/20/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ralph Giorgio
04/20/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Ralph Giorgio
04/13/2022
Filed — Alteration
Plumbing application filed to install a new gas meter with 2 new boilers and 2 new hot water heaters at the cellar level of this 2 family residence. Correcting PRA 500174679 to show gas meter in osp for the existing dryer in cellar & res cooking on 1st
S00697468-I1
04/13/2022
Objection raised — Other
04/13/2022
Objection resolved — Addressed
04/13/2022
Objection raised — Inspections
04/13/2022
Objection resolved — Addressed
04/13/2022
Objection raised — Fire_Protection
04/13/2022
Objection resolved — Addressed
04/13/2022
Objection raised — Scope
04/13/2022
Objection resolved — Addressed
03/14/2022
Special inspection requirement — Energy Code Compliance Inspections
Ralph Giorgio
03/14/2022
Special inspection requirement — HVAC-R and service water heating equipment
Ralph Giorgio
10/18/2021
Signed off — Alteration
S00425379-S3
10/14/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/13/2021
Signed off — Alteration
S00425379-I1
10/12/2021
Permit issued — Plumbing
S00425379-S3-PL
10/11/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/07/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/14/2021
Filed — Alteration
S00425379-S3
06/11/2021
Permit issued — Plumbing
S00425379-I1-PL
01/05/2021
Filed — Alteration
S00425379-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedPLUMBING WORKS NYC INC08/24/2022
DOB NOWPlumbingSigned-offRICHMOND P & H CO., INC10/12/2021
DOB NOWPlumbingSigned-offRICHMOND P & H CO., INC06/11/2021
BIS—ISSUEDMEGNA HOME IMPROVEMENTS06/08/2021
1 project · most recent 04/13/2022
Gas
FiledStatusContractorScope
04/13/2022Permit IssuedPLUMBING NYC INCGas
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
01/11/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/18/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/12/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/12/2022Fail-Final Boiler Equipment InspectionFailView ↗
09/07/2022Fail-Final Boiler Equipment InspectionFailView ↗
10/14/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/11/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/07/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/26/2022FinalRalph Giorgioprogress
04/20/2022Fire-Resistant Penetrations and JointsRalph Giorgiospecial
04/20/2022HVAC-R and service water piping design and insulationRalph Giorgioenergy_progress
03/14/2022Energy Code Compliance InspectionsRalph Giorgioprogress
03/14/2022HVAC-R and service water heating equipmentRalph Giorgioenergy_progress
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
08/25/2026S00425379-S3Request digital key ↗
08/14/2026S00697468-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing Legalization1
08/25/2026S00425379-I1Request digital key ↗
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION4
05/10/2021520450814Open ↗
04/23/2021520450814Open ↗
02/10/2021520450814Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
06/23/2021520450814Open ↗
▸BISWORK PERMIT APPLICATION1
06/08/2021520450814Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
01/07/2021520450814Open ↗
▸BISVERIFY TAX LOT1
11/02/2021520450814Open ↗
▸BISZONING DIAGRAM1
05/12/2021520450814Open ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature4
08/25/2026S00697468-I1Open ↗
08/25/2026S00697468-I1Open ↗
08/25/2026S00697468-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/25/2026S00425379-S3Open ↗
08/25/2026S00425379-I1Open ↗
08/24/2026S00697468-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026S00697468-I1Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
01/04/2021520450814Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/14/2026S00697468-I1Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
08/25/2021520450814Open ↗
06/03/2021520450814Open ↗
05/04/2021520450814Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
11/05/2021520450814Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY6
08/25/2021520450814Open ↗
06/01/2021520450814Open ↗
05/04/2021520450814Open ↗
Showing 3 of 6 on file for this type
▸BISSOIL REPORT1
05/04/2021520450814Open ↗
▸Approvals, Objections & Sign-offs5
▸BISSCHEDULE A - OCCUPANCY / USE4
05/10/2021520450814Open ↗
04/23/2021520450814Open ↗
02/10/2021520450814Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
12/21/2020520450814Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
02/16/2021520450814Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
08/25/2021520450814Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
06/22/2021520450814Open ↗
06/08/2021520450814Open ↗
01/04/2021520450814Open ↗
▸BISEFILING COVER SHEET1
12/21/2020520450814Open ↗
▸BISBOROUGH INTAKE FORM1
12/21/2020520450814Open ↗
▸Other Documents5
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
05/12/2021520450814Open ↗
05/12/2021520450814Open ↗
02/08/2021520450814Open ↗
▸BISPLOT DIAGRAM1
01/04/2021520450814Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
05/10/2021520450814Open ↗