← Back
Two stories - detached, small or mid-size
239 JACQUES AVENUE
STATEN ISLAND · BIN 5055345
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R3-2Zoning
1,224 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,900 sf lot · 0.42 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
Floor 2Under Construction3p · 1 filing · 20 docs
Floor 1Under Construction1p · 1 filing · 20 docs
CellarUnder Construction1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RYAN DESIGN ARCHITECTURE404/01/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILT NYG INCGeneral Contractor603/21/2026
HY DESIGN & DEVELOPMENT LLC.General Contractor407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC 88 CORP8371304/01/2026
RYAN DESIGN ARCHITECTURE7159304/01/2026
Building Lifecycle
All (32)Filed (4)Permit Issued (4)Inspection (6)Objection (2)Special Inspection (16)
04/09/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
04/01/2026
Filed — Alteration
Two Story Extension in Rear of existing 1 family house
S01057192-P2
03/16/2026
Special inspection requirement — Concrete - Cast-In-Place
Eric Sun
03/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
03/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Eric Sun
03/16/2026
Special inspection requirement — Subgrade Inspections
Daniel Ryan
03/16/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Daniel Ryan
03/16/2026
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
03/16/2026
Special inspection requirement — Final
Eric Sun
03/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
03/16/2026
Special inspection requirement — Footing and Foundation
Eric Sun
03/16/2026
Special inspection requirement — Structural Wood Frame
Eric Sun
03/16/2026
Special inspection requirement — Air barrier - visual inspection
Eric Sun
03/16/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Eric Sun
03/16/2026
Special inspection requirement — Interior lighting power
Eric Sun
03/16/2026
Special inspection requirement — Insulation placement and R values
Eric Sun
03/16/2026
Special inspection requirement — Fenestration air leakage
Eric Sun
03/16/2026
Special inspection requirement — Fenestration areas
Eric Sun
02/09/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
02/03/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/23/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/26/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/17/2025
Permit issued — Foundation
S01057192-I1-GC
08/12/2025
Filed — Alteration
Two Story Extension in Rear of existing 1 family house
S01057192-P1
06/05/2025
Permit issued — Structural
S01057192-I1-FO
06/04/2025
Permit issued — Foundation
S01057192-I1-GC
05/09/2025
Permit issued — Construction Fence
S01057192-S1-FN
08/23/2024
Objection resolved — Addressed
08/22/2024
Objection raised — Other
08/15/2024
Filed — Alteration
Two Story Extension in Rear of existing 1 family house
S01057192-S1
06/10/2024
Filed — Alteration
Two Story Extension in Rear of existing 1 family house
S01057192-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedBUILT NYG INC11/17/2025
DOB NOWStructuralPermit IssuedFANG YE06/05/2025
DOB NOWFoundationPermit IssuedFANG YE06/04/2025
DOB NOWConstruction FencePermit IssuedBUILT NYG INC05/09/2025
1 project · most recent 06/11/2025
General Wiring
FiledStatusContractorScope
06/11/2025CompleteALL AROUND ELECTRIC CORP.General Wiring
1 project · most recent 04/01/2026
Wood
FiledStatusContractorScope
04/01/2026Permit IssuedBUILT NYG INCWood
1 project · most recent 04/01/2026
Fence
FiledStatusContractorScope
04/01/2026Permit IssuedBUILT NYG INCFence
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/09/2026Fail-Final CND-Occupancy InspectionFailView ↗
02/09/2026Fail-Final CND-Occupancy InspectionFailView ↗
02/03/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/23/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/26/2025Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
03/16/2026Concrete - Cast-In-PlaceEric Sunspecial
03/16/2026Fire-Resistant Penetrations and JointsEric Sunspecial
03/16/2026Structural Stability – Alterations of existing buildingsEric Sunspecial
03/16/2026Subgrade InspectionsDaniel Ryanspecial
03/16/2026Subsurface Investigations (Borings/Test Pits)Daniel Ryanspecial
03/16/2026Energy Code Compliance InspectionsEric Sunprogress
03/16/2026FinalEric Sunprogress
03/16/2026Fire-Resistance Rated ConstructionEric Sunprogress
03/16/2026Footing and FoundationEric Sunprogress
03/16/2026Structural Wood FrameEric Sunprogress
03/16/2026Air barrier - visual inspectionEric Sunenergy_progress
03/16/2026Fenestration and door U-factor and product ratingsEric Sunenergy_progress
03/16/2026Interior lighting powerEric Sunenergy_progress
03/16/2026Insulation placement and R valuesEric Sunenergy_progress
03/16/2026Fenestration air leakageEric Sunenergy_progress
03/16/2026Fenestration areasEric Sunenergy_progress
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/17/2026S01057192-S1Request digital key ↗
08/17/2026S01057192-I1Request digital key ↗
08/17/2026S01057192-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram3
08/17/2026S01057192-P1Open ↗
08/17/2026S01057192-I1Open ↗
08/13/2026S01057192-P2Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/17/2026S01057192-I1Open ↗
08/17/2026S01057192-P1Open ↗
08/13/2026S01057192-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/23/2026S01057192-P2Open ↗
08/23/2026S01057192-P2Open ↗
08/23/2026S01057192-P2Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026S01057192-P2Open ↗
08/23/2026S01057192-P2Open ↗
08/23/2026S01057192-P2Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/17/2026S01057192-I1Open ↗
08/17/2026S01057192-P1Open ↗
08/13/2026S01057192-P2Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/17/2026S01057192-I1Open ↗
08/17/2026S01057192-P1Open ↗
08/13/2026S01057192-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S01057192-I1Open ↗
▸Other Documents9
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/17/2026S01057192-I1Open ↗
08/17/2026S01057192-P1Open ↗
08/13/2026S01057192-P2Open ↗
▸DOB NOWPlot Diagram3
08/17/2026S01057192-P1Open ↗
08/17/2026S01057192-I1Open ↗
08/13/2026S01057192-P2Open ↗
▸DOB NOWSite Survey: Initial3
08/17/2026S01057192-I1Open ↗
08/17/2026S01057192-P1Open ↗
08/13/2026S01057192-P2Open ↗