← Back
Two stories - detached, small or mid-size
105 CUBA AVENUE
STATEN ISLAND · BIN 5055743
💬 Discuss this project
1960Year Built
2Stories
A1Building Class
R3-1Zoning
1,999 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,040 sf lot · 0.49 FAR built · Flood zone X500
Locations of Work
Architecture
Basement1p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M-CON ENGINEERING, PC111/15/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SANTORA, FRANKElectrical203/21/2026
SUSTAINABLE STRATEGIESGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M-CON ENGINEERING7341111/15/2024
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (5)
03/13/2025
Signed off — Alteration
S01143163-I1
11/21/2024
Permit issued — Solar
S01143163-I1-SL
11/15/2024
Filed — Alteration
S01143163-I1
11/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michelle Contri
11/15/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michelle Contri
11/15/2024
Special inspection requirement — Energy Code Compliance Inspections
Michelle Contri
11/15/2024
Special inspection requirement — Final
Michelle Contri
11/15/2024
Special inspection requirement — Air barrier - visual inspection
Michelle Contri
04/27/2016
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUSTAINABLE STRATEGIES11/21/2024
BISPLISSUEDRELIABLE PLBG & HTG CORP11/13/2002
1 project · most recent 10/29/2024
FiledStatusContractorScope
10/29/2024CompleteSOURCE ELECTRIC INC1 meters
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
11/15/2024Fire-Resistant Penetrations and JointsMichelle Contrispecial
11/15/2024Structural Stability – Alterations of existing buildingsMichelle Contrispecial
11/15/2024Energy Code Compliance InspectionsMichelle Contriprogress
11/15/2024FinalMichelle Contriprogress
11/15/2024Air barrier - visual inspectionMichelle Contrienergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026S01143163-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
09/28/2026S01143163-I1Open ↗
09/28/2026S01143163-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01143163-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/28/2026S01143163-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S01143163-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01143163-I1Open ↗