← Back
Two family frame
158 MILL ROAD
STATEN ISLAND · BIN 5055824
💬 Discuss this project
1925Year Built
2Stories
B2Building Class
R3-1Zoning
1,632 sfGross Floor Area
2Units
6 Open Violations ▸
Two family frame · 6,660 sf lot · 0.25 FAR built · Flood zone X
Locations of Work
Architecture
Roof3p · 1 filing · 15 docs
Floor 11p · 1 filing · 15 docs
Cellar1p · 1 filing · 15 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RYAN DESIGN ARCHITECTURE108/11/2026
Building Lifecycle
All (1)Filed (1)
08/11/2026
Filed — Alteration CO
INTERIOR RENOVATION AND EXTENSION IN REAR AND new ATTACHED ADU IN BASEMENT , SEMI ATTACHED HOUSE AND RECORD NEW ZONING LOT METES AND BOUNDS
S01425209-I1
Nothing on file for this building.
1 project · most recent 08/11/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
08/11/2026——Heating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 08/11/2026
Gas Storm
FiledStatusContractorScope
08/11/2026——Gas, Storm
1 project · most recent 02/19/2026
FiledStatusContractorScope
02/19/2026CancelledCUNNINGHAM ELECTRIC CORP2 meters, 1 new_meters
1 project · most recent 08/11/2026
Concrete
FiledStatusContractorScope
08/11/2026——Concrete
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
08/07/2026Metering—energy_progress
08/07/2026Concrete - Cast-In-Place—special
08/07/2026Structural Stability – Alterations of existing buildings—special
08/07/2026Subgrade Inspections—special
08/07/2026Insulation placement and R values—energy_progress
08/07/2026Fenestration air leakage—energy_progress
08/07/2026Permanent certificate—energy_progress
08/07/2026Air barrier — testing —energy_progress
08/07/2026Interior lighting power—energy_progress
08/07/2026Subsurface Investigations (Borings/Test Pits)—special
08/07/2026Energy Code Compliance Inspections—progress
08/07/2026Fire-Resistance Rated Construction—progress
08/07/2026Structural Wood Frame—progress
08/07/2026Fenestration and door U-factor and product ratings—energy_progress
08/07/2026Air barrier - visual inspection—energy_progress
07/01/2026Mechanical Systems—special
07/01/2026HVAC-R and service water piping design and insulation—energy_progress
07/01/2026HVAC-R and service water heating equipment—energy_progress
07/01/2026HVAC-R and service water heating system controls—energy_progress
07/01/2026Final—progress
07/01/2026Footing and Foundation—progress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026S01425209-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026S01425209-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026S01425209-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/16/2026S01425209-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026S01425209-S1Open ↗
08/16/2026S01425209-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/16/2026S01425209-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/16/2026S01425209-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026S01425209-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWTR4 Test Report and Plot Diagram1
08/16/2026S01425209-I1Open ↗
▸DOB NOWSOIL REPORT1
08/16/2026S01425209-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/16/2026S01425209-I1Open ↗
▸Other Documents4
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/16/2026S01425209-I1Open ↗
▸DOB NOWPlot Diagram1
08/16/2026S01425209-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/16/2026S01425209-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/16/2026S01425209-I1Open ↗