Office only, 2-6 stories
129 NEW DORP PLAZA
STATEN ISLAND · BIN 5057358
💬 Discuss this project
1931Year Built
2Stories
O2Building Class
R3-1Zoning
3,012 sfGross Floor Area
3Units
1 Open Violation ▸FDNY Report ↗
Office only, 2-6 stories · Owner of record: PLAZA GARDENS REAL ESTATE CORP · 5,490 sf lot · 0.55 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 15 docs
Floor 12p · 1 filing · 15 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PIROOZ ENGINEERING, P.C.404/24/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRECISION HOME DEV INCGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUTTERFIELD & O'CONNOR4189304/24/2025
Building Lifecycle
All (44)Filed (4)Permit Issued (2)Signed Off (2)Violation (1)Inspection (3)Objection (4)Special Inspection (28)
05/19/2025
Signed off — Alteration
PROP. INTERIOR RENOVATION OF THE EXIST. 2 STORY AND CELLAR OFFICE BUILDING, REPAIR AND REPLACEMENT OF INTERIOR PARTITIONS, WINDOWS, DOORS, FLOORING, DRYWALLS, AND PLUMBING FIXTURES, REMOVE AND REPLACE FIRE-DAMAGED ELEMENTS, NO CHANGE IN BULK, USE, EGRESS,
S07997765-I1
05/15/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/09/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/24/2025
Filed — Alteration
PROP. INTERIOR RENOVATION OF THE EXIST. 2 STORY AND CELLAR OFFICE BUILDING, REPAIR AND REPLACEMENT OF INTERIOR PARTITIONS, WINDOWS, DOORS, FLOORING, DRYWALLS, AND PLUMBING FIXTURES, REMOVE AND REPLACE FIRE-DAMAGED ELEMENTS, NO CHANGE IN BULK, USE, EGRESS,
S07997765-P2
04/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN T. O'CONNOR
04/16/2025
Special inspection requirement — Construction Operations Influencing Adjacent Structures
BRIAN T. O'CONNOR
04/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN T. O'CONNOR
04/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
BRIAN T. O'CONNOR
04/16/2025
Special inspection requirement — Energy Code Compliance Inspections
BRIAN T. O'CONNOR
04/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
BRIAN T. O'CONNOR
04/16/2025
Special inspection requirement — Fenestration areas
BRIAN T. O'CONNOR
04/16/2025
Special inspection requirement — Air barrier - visual inspection
BRIAN T. O'CONNOR
04/16/2025
Special inspection requirement — Insulation placement and R values
BRIAN T. O'CONNOR
04/16/2025
Special inspection requirement — Fenestration air leakage
BRIAN T. O'CONNOR
04/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN T. O'CONNOR
04/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN T. O'CONNOR
04/16/2025
Special inspection requirement — Interior lighting power
BRIAN T. O'CONNOR
04/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
BRIAN T. O'CONNOR
04/14/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/24/2025
Objection resolved — Addressed
12/31/2024
Objection raised — Scope
12/18/2024
Filed — Alteration
PROP. INTERIOR RENOVATION OF THE EXIST. 2 STORY AND CELLAR OFFICE BUILDING, REPAIR AND REPLACEMENT OF INTERIOR PARTITIONS, WINDOWS, DOORS, FLOORING, DRYWALLS, AND PLUMBING FIXTURES, REMOVE AND REPLACE FIRE-DAMAGED ELEMENTS, NO CHANGE IN BULK, USE, EGRESS,
S07997765-P1
12/16/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
BRIAN T. O'CONNOR
12/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN T. O'CONNOR
12/16/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
BRIAN T. O'CONNOR
12/16/2024
Special inspection requirement — Energy Code Compliance Inspections
BRIAN T. O'CONNOR
12/16/2024
Special inspection requirement — Fire-Resistance Rated Construction
BRIAN T. O'CONNOR
12/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
BRIAN T. O'CONNOR
12/16/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
BRIAN T. O'CONNOR
12/16/2024
Special inspection requirement — Air barrier - visual inspection
BRIAN T. O'CONNOR
12/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN T. O'CONNOR
12/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN T. O'CONNOR
12/16/2024
Special inspection requirement — Insulation placement and R values
BRIAN T. O'CONNOR
12/16/2024
Special inspection requirement — Fenestration air leakage
BRIAN T. O'CONNOR
12/16/2024
Special inspection requirement — Fenestration areas
BRIAN T. O'CONNOR
12/16/2024
Special inspection requirement — Interior lighting power
BRIAN T. O'CONNOR
11/19/2024
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH ALTERATION APPLICATION NUMBER S07997765
S07997766-I1
11/22/2023
Permit issued — General Construction
S07997765-I1-GC
11/16/2023
Permit issued — Construction Fence
S07997766-I1-FN
03/10/2023
Objection raised — Scope
03/10/2023
Objection resolved — Addressed
02/27/2023
Filed — Alteration
PROP. INTERIOR RENOVATION OF THE EXIST. 2 STORY AND CELLAR OFFICE BUILDING, REPAIR AND REPLACEMENT OF INTERIOR PARTITIONS, WINDOWS, DOORS, FLOORING, DRYWALLS, AND PLUMBING FIXTURES, REMOVE AND REPLACE FIRE-DAMAGED ELEMENTS, NO CHANGE IN BULK, USE, EGRESS,
S07997765-I1
02/27/2023
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH ALTERATION APPLICATION NUMBER S07997765
S07997766-I1
07/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offPRECISION HOME DEV INC11/22/2023
DOB NOWConstruction FenceSigned-offPRECISION HOME DEV INC11/16/2023
2 projects · most recent 05/28/2024
General Wiring
FiledStatusContractorScope
05/28/2024Permit IssuedC & A ELECTRICAL CORPGeneral Wiring
12/19/2017CompleteCATELLO ELEC'L CONT., INC1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/15/2025Pass-Final General Construction Non-Directive 14PassView ↗
05/09/2025Pass-Final General Construction Non-Directive 14PassView ↗
04/14/2025Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
04/16/2025HVAC-R and service water piping design and insulationBRIAN T. O'CONNORenergy_progress
04/16/2025Construction Operations Influencing Adjacent StructuresBRIAN T. O'CONNORspecial
04/16/2025Fire-Resistant Penetrations and JointsBRIAN T. O'CONNORspecial
04/16/2025Structural Stability – Alterations of existing buildingsBRIAN T. O'CONNORspecial
04/16/2025Energy Code Compliance InspectionsBRIAN T. O'CONNORprogress
04/16/2025Fire-Resistance Rated ConstructionBRIAN T. O'CONNORprogress
04/16/2025Fenestration areasBRIAN T. O'CONNORenergy_progress
04/16/2025Air barrier - visual inspectionBRIAN T. O'CONNORenergy_progress
04/16/2025Insulation placement and R valuesBRIAN T. O'CONNORenergy_progress
04/16/2025Fenestration air leakageBRIAN T. O'CONNORenergy_progress
04/16/2025HVAC-R and service water heating equipmentBRIAN T. O'CONNORenergy_progress
04/16/2025HVAC-R and service water heating system controlsBRIAN T. O'CONNORenergy_progress
04/16/2025Interior lighting powerBRIAN T. O'CONNORenergy_progress
04/16/2025Fenestration and door U-factor and product ratingsBRIAN T. O'CONNORenergy_progress
12/16/2024Construction Operations Influencing Adjacent StructuresBRIAN T. O'CONNORspecial
12/16/2024Fire-Resistant Penetrations and JointsBRIAN T. O'CONNORspecial
12/16/2024Structural Stability – Alterations of existing buildingsBRIAN T. O'CONNORspecial
12/16/2024Energy Code Compliance InspectionsBRIAN T. O'CONNORprogress
12/16/2024Fire-Resistance Rated ConstructionBRIAN T. O'CONNORprogress
12/16/2024HVAC-R and service water heating equipmentBRIAN T. O'CONNORenergy_progress
12/16/2024Fenestration and door U-factor and product ratingsBRIAN T. O'CONNORenergy_progress
12/16/2024Air barrier - visual inspectionBRIAN T. O'CONNORenergy_progress
12/16/2024HVAC-R and service water piping design and insulationBRIAN T. O'CONNORenergy_progress
12/16/2024HVAC-R and service water heating system controlsBRIAN T. O'CONNORenergy_progress
12/16/2024Insulation placement and R valuesBRIAN T. O'CONNORenergy_progress
Latest 25 of 28.
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026S07997766-I1Request digital key ↗
08/19/2026S07997765-P2Request digital key ↗
08/19/2026S07997765-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026S07997766-I1Open ↗
08/13/2026S07997765-P2Open ↗
08/13/2026S07997765-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026S07997765-P2Open ↗
09/01/2026S07997765-P2Open ↗
08/28/2026S07997765-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026S07997765-P2Open ↗
08/28/2026S07997765-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026S07997765-I1Open ↗
08/13/2026S07997765-P2Open ↗
08/13/2026S07997765-P1Open ↗