← Back
One story - permanent living quarter
163 8 STREET
STATEN ISLAND · BIN 5057868
💬 Discuss this project
1945Year Built
1.5Stories
A2Building Class
R3XZoning
1,020 sfGross Floor Area
1Units
One story - permanent living quarter · 5,500 sf lot · 0.19 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingGeneral
Floor 217p · 2 filings · 20 docs
Floor 113p · 2 filings · 20 docs
Cellar11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GS REALTY1207/08/2026
GS REALTY OF NEW YORK LLC903/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RYAN DESIGN ARCHITECTURE802/28/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
APRILE BONAMO FILING REP103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAXIMUM CONTRACTING INCGeneral Contractor307/08/2026
NORTHEAST PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RYAN DESIGN ARCHITECTURE7159203/11/2025
Building Lifecycle
All (41)Filed (8)Permit Issued (4)Signed Off (2)Inspection (7)Objection (16)Special Inspection (4)
07/22/2026
Signed off — Alteration
CURB CUT 10'
S01059357-I1
04/06/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/02/2026
Special inspection requirement — Energy Code Compliance Inspections
Daniel Ryan
04/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
Daniel Ryan
04/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
Daniel Ryan
04/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Daniel Ryan
03/24/2026
Objection resolved — Addressed
03/04/2026
Objection raised — Other
02/28/2026
Filed — Alteration
PLUMBING PAA to show second floor riser in scope of work and add hot water heater in gas usage, revise plans showing BBQ is 10 feet from combustible material on riser diagram and BBQ at OSP.
S01059347-P2
02/27/2026
Filed — Alteration
CURB CUT 10'
S01059357-P1
12/10/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
12/08/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/28/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/25/2025
Signed off — Alteration
TEMPORARY FENCE
S01059355-I1
11/25/2025
Permit issued — Curb Cut
S01059357-I1-CC
03/11/2025
Filed — Alteration CO
NEW BEDROOMS AND BATH, NEW DORMER IN REAR AND FINISH EXISTING ATTIC AT SECOND FLOOR IN ONE FAMILY.
S01059321-P1
03/11/2025
Filed — Alteration
PLUMBING PAA to show second floor riser in scope of work and add hot water heater in gas usage, revise plans showing BBQ is 10 feet from combustible material on riser diagram and BBQ at OSP.
S01059347-P1
12/30/2024
Filed — Alteration
CURB CUT 10'
S01059357-I1
12/20/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/16/2024
Permit issued — Plumbing
S01059347-I1-PL
12/10/2024
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
11/12/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/01/2024
Filed — Alteration
PLUMBING PAA to show second floor riser in scope of work and add hot water heater in gas usage, revise plans showing BBQ is 10 feet from combustible material on riser diagram and BBQ at OSP.
S01059347-I1
10/29/2024
Permit issued — General Construction
S01059321-I1-GC
10/24/2024
Permit issued — Construction Fence
S01059355-I1-FN
10/18/2024
Objection resolved — Addressed
10/17/2024
Objection raised — Other
10/15/2024
Filed — Alteration
TEMPORARY FENCE
S01059355-I1
08/27/2024
Objection resolved — Addressed
08/15/2024
Objection resolved — Addressed
08/15/2024
Objection resolved — Addressed
08/15/2024
Objection resolved — Addressed
08/15/2024
Objection resolved — Addressed
08/15/2024
Objection resolved — Addressed
07/24/2024
Objection raised — Zoning
07/24/2024
Objection raised — Other
07/24/2024
Objection raised — Scope
07/24/2024
Objection raised — Other
07/24/2024
Objection raised — Zoning
07/24/2024
Objection raised — Fire_Protection
07/15/2024
Filed — Alteration CO
NEW BEDROOMS AND BATH, NEW DORMER IN REAR AND FINISH EXISTING ATTIC AT SECOND FLOOR IN ONE FAMILY.
S01059321-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMAXIMUM CONTRACTING INC11/25/2025
DOB NOWPlumbingSigned-offNORTHEAST PLBG & HTG CORP12/16/2024
DOB NOWGeneral ConstructionPermit IssuedMAXIMUM CONTRACTING INC10/29/2024
DOB NOWConstruction FenceSigned-offMAXIMUM CONTRACTING INC10/24/2024
1 project · most recent 02/28/2026
Gas Water/Sanitary
FiledStatusContractorScope
02/28/2026Signed-offNORTHEAST PLBG & HTG CORPGas, Water/Sanitary
1 project · most recent 07/31/2025
General Wiring
FiledStatusContractorScope
07/31/2025CompleteMANGI ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/06/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/10/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
12/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/10/2024No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
11/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
04/02/2026Energy Code Compliance InspectionsDaniel Ryanprogress
04/02/2026HVAC-R and service water heating equipmentDaniel Ryanenergy_progress
04/02/2026HVAC-R and service water heating system controlsDaniel Ryanenergy_progress
04/02/2026HVAC-R and service water piping design and insulationDaniel Ryanenergy_progress
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/20/2026S01059355-I1Request digital key ↗
08/20/2026S01059321-I1Request digital key ↗
08/20/2026S01059321-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S01059321-I1Open ↗
08/13/2026S01059321-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026S01059321-I1Open ↗
08/13/2026S01059321-P1Open ↗
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/20/2026S01059355-I1Open ↗
08/20/2026S01059321-I1Open ↗
08/20/2026S01059321-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/25/2026S01059347-I1Open ↗
08/25/2026S01059347-I1Open ↗
08/25/2026S01059347-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026S01059321-P1Open ↗
08/13/2026S01059321-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/20/2026S01059321-P1Open ↗
08/20/2026S01059321-I1Open ↗
08/13/2026S01059347-P1Open ↗
Showing 3 of 5 on file for this type
▸Other Documents10
▸DOB NOWProperty Ownership Certification2
08/20/2026S01059321-I1Open ↗
08/20/2026S01059321-P1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026S01059321-I1Open ↗
08/13/2026S01059321-P1Open ↗
▸DOB NOWFinal Survey2
08/20/2026S01059321-I1Open ↗
08/13/2026S01059321-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S01059321-I1Open ↗
08/13/2026S01059321-P1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026S01059321-P1Open ↗
08/13/2026S01059321-I1Open ↗