← Back
One story - permanent living quarter
53 DALE AVENUE
STATEN ISLAND · BIN 5058881
💬 Discuss this project
1950Year Built
1Stories
A2Building Class
R3XZoning
912 sfGross Floor Area
1Units
One story - permanent living quarter · 5,000 sf lot · 0.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof3p · 1 filing · 5 docs
Floor 11p · 1 filing · 5 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KINDO HOLDINGS, LLC103/23/2026
Building Lifecycle
All (28)Filed (1)Objection (2)Special Inspection (25)
05/06/2026
Objection raised — Fire_Protection
05/06/2026
Objection raised — Scope
03/23/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
ALT-CO OF TWO STORY WITH ATTIC & CELLAR, SEMI-DETACHED TWO FAMILY BUILDING FILED UNDER NYC 2022 BUILDING CODE.
S01366746-I1
03/19/2026
Special inspection requirement — Insulation placement and R values
03/19/2026
Special inspection requirement — Concrete - Cast-In-Place
03/19/2026
Special inspection requirement — Demolition
03/19/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
03/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/19/2026
Special inspection requirement — Post-installed Anchors
03/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/19/2026
Special inspection requirement — Structural Cold-Formed Steel
03/19/2026
Special inspection requirement — Structural Steel - Details
03/19/2026
Special inspection requirement — Energy Code Compliance Inspections
03/19/2026
Special inspection requirement — Fenestration air leakage
03/19/2026
Special inspection requirement — Chimneys and vents
03/19/2026
Special inspection requirement — Fire-Resistance Rated Construction
03/19/2026
Special inspection requirement — Interior lighting power
03/19/2026
Special inspection requirement — Lighting controls
03/19/2026
Special inspection requirement — Permanent certificate
03/19/2026
Special inspection requirement — Air barrier — testing
03/19/2026
Special inspection requirement — Protection of exposed foundation insulation
03/19/2026
Special inspection requirement — Electric vehicle service equipment requirements
03/19/2026
Special inspection requirement — Air barrier - visual inspection
03/19/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
03/19/2026
Special inspection requirement — Fireplaces
03/19/2026
Special inspection requirement — Fenestration areas
03/03/2026
Special inspection requirement — Final
03/03/2026
Special inspection requirement — Footing and Foundation
Nothing on file for this building.
1 project · most recent 03/23/2026
Steel Concrete Wood
FiledStatusContractorScope
03/23/2026——Steel, Concrete, Wood
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
03/19/2026Insulation placement and R values—energy_progress
03/19/2026Concrete - Cast-In-Place—special
03/19/2026Demolition—special
03/19/2026Exterior Insulation and Finish Systems (EIFS)—special
03/19/2026Fire-Resistant Penetrations and Joints—special
03/19/2026Post-installed Anchors—special
03/19/2026Structural Stability – Alterations of existing buildings—special
03/19/2026Structural Cold-Formed Steel—special
03/19/2026Structural Steel - Details—special
03/19/2026Energy Code Compliance Inspections—progress
03/19/2026Fenestration air leakage—energy_progress
03/19/2026Chimneys and vents—special
03/19/2026Fire-Resistance Rated Construction—progress
03/19/2026Interior lighting power—energy_progress
03/19/2026Lighting controls—energy_progress
03/19/2026Permanent certificate—energy_progress
03/19/2026Air barrier — testing —energy_progress
03/19/2026Protection of exposed foundation insulation—energy_progress
03/19/2026Electric vehicle service equipment requirements—energy_progress
03/19/2026Air barrier - visual inspection—energy_progress
03/19/2026Fenestration and door U-factor and product ratings—energy_progress
03/19/2026Fireplaces—energy_progress
03/19/2026Fenestration areas—energy_progress
03/03/2026Final—progress
03/03/2026Footing and Foundation—progress
▾Documents — 5 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026S01366746-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S01366746-I1Open ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026S01366746-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026S01366746-I1Open ↗
▸Other Documents1
▸DOB NOWSite Survey: Initial1
08/13/2026S01366746-I1Open ↗