← Back
Two family frame
11 VINCENT AVENUE
STATEN ISLAND · BIN 5059286
💬 Discuss this project
1960Year Built
2Stories
B2Building Class
R3XZoning
2,300 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 4,000 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
REGAL CONSTRUCTION GROUP303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YANG ENGINEERING LLC810/23/2025
JIAN ENGINEERING PLLC107/05/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD DESIGN STUDIO1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
REGAL CONSTRUCTION GROUPGeneral Contractor807/08/2026
TIMOTHY COLEMAN LICENSEDElectrical103/22/2026
ZONE PLUMBING & HEATING CPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JIAN ENGINEERING PLLC7397810/23/2025
Building Lifecycle
All (61)Filed (9)Permit Issued (8)Signed Off (4)Violation (3)Inspection (7)Special Inspection (30)
12/02/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/03/2025
Signed off — Alteration CO
SUBMIT TEMPORARY CONSTRUCTION FENCE AT OPEN SPACE, IN CONJUNCTION WITH ALT-CO APPLICATION #:S00954132-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00954132-S5
10/30/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/27/2025
Permit issued — Curb Cut
S00954132-S5-CC
10/27/2025
Special inspection requirement — Fenestration air leakage
JIAN DENG
10/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
10/27/2025
Special inspection requirement — Mechanical Systems
JIAN DENG
10/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
JIAN DENG
10/27/2025
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
10/27/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JIAN DENG
10/27/2025
Special inspection requirement — Final
JIAN DENG
10/27/2025
Special inspection requirement — Electric vehicle service equipment requirements
JIAN DENG
10/27/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
JIAN DENG
10/27/2025
Special inspection requirement — Air barrier - visual inspection
JIAN DENG
10/27/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JIAN DENG
10/27/2025
Special inspection requirement — HVAC-R and service water heating system controls
JIAN DENG
10/27/2025
Special inspection requirement — Fenestration areas
JIAN DENG
10/27/2025
Special inspection requirement — Concrete - Cast-In-Place
JIAN DENG
10/27/2025
Special inspection requirement — Permanent certificate
JIAN DENG
10/27/2025
Special inspection requirement — Interior lighting power
JIAN DENG
10/27/2025
Special inspection requirement — Insulation placement and R values
JIAN DENG
10/27/2025
Special inspection requirement — HVAC-R and service water heating equipment
JIAN DENG
10/27/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JIAN DENG
10/23/2025
Filed — Alteration CO
SUBMIT TEMPORARY CONSTRUCTION FENCE AT OPEN SPACE, IN CONJUNCTION WITH ALT-CO APPLICATION #:S00954132-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00954132-S5
10/23/2025
Filed — Alteration CO
SUBMIT TEMPORARY CONSTRUCTION FENCE AT OPEN SPACE, IN CONJUNCTION WITH ALT-CO APPLICATION #:S00954132-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00954132-P5
10/23/2025
Special inspection requirement — Energy Code Compliance Inspections
JIAN DENG
10/23/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JIAN DENG
10/23/2025
Special inspection requirement — Final
JIAN DENG
10/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JIAN DENG
10/23/2025
Special inspection requirement — Mechanical Systems
JIAN DENG
10/23/2025
Special inspection requirement — Fire-Resistance Rated Construction
JIAN DENG
10/23/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
JIAN DENG
10/23/2025
Special inspection requirement — Concrete - Cast-In-Place
JIAN DENG
10/23/2025
Special inspection requirement — Air barrier - visual inspection
JIAN DENG
10/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
JIAN DENG
10/23/2025
Special inspection requirement — Insulation placement and R values
JIAN DENG
10/03/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/16/2025
Signed off — Alteration CO
SUBMIT TEMPORARY CONSTRUCTION FENCE AT OPEN SPACE, IN CONJUNCTION WITH ALT-CO APPLICATION #:S00954132-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00954132-S2
09/11/2025
Signed off — Alteration CO
SUBMIT TEMPORARY CONSTRUCTION FENCE AT OPEN SPACE, IN CONJUNCTION WITH ALT-CO APPLICATION #:S00954132-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00954132-S1
08/06/2025
Filed — Alteration CO
SUBMIT TEMPORARY CONSTRUCTION FENCE AT OPEN SPACE, IN CONJUNCTION WITH ALT-CO APPLICATION #:S00954132-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00954132-P4
07/25/2025
Signed off — Alteration CO
SUBMIT TEMPORARY CONSTRUCTION FENCE AT OPEN SPACE, IN CONJUNCTION WITH ALT-CO APPLICATION #:S00954132-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00954132-S4
07/24/2025
Filed — Alteration CO
SUBMIT TEMPORARY CONSTRUCTION FENCE AT OPEN SPACE, IN CONJUNCTION WITH ALT-CO APPLICATION #:S00954132-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00954132-P3
03/14/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/14/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/13/2024
Permit issued — Plumbing
S00954132-S1-PL
10/07/2024
Violation issued (ECB, closed)
Unknown
10/04/2024
Violation issued (ECB, closed)
Unknown
09/11/2024
Violation issued (ECB, closed)
Construction
08/20/2024
Filed — Alteration CO
SUBMIT TEMPORARY CONSTRUCTION FENCE AT OPEN SPACE, IN CONJUNCTION WITH ALT-CO APPLICATION #:S00954132-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00954132-P2
08/20/2024
Permit issued — Structural
S00954132-S2-ST
08/20/2024
Permit issued — Construction Fence
S00954132-S4-FN
08/19/2024
Permit issued — Mechanical Systems
S00954132-I1-GC-CX
07/16/2024
Permit issued — Structural
S00954132-S2-ST
07/05/2024
Filed — Alteration CO
SUBMIT TEMPORARY CONSTRUCTION FENCE AT OPEN SPACE, IN CONJUNCTION WITH ALT-CO APPLICATION #:S00954132-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00954132-S2
07/05/2024
Permit issued — General Construction
S00954132-I1-GC-CX
07/01/2024
Filed — Alteration CO
SUBMIT TEMPORARY CONSTRUCTION FENCE AT OPEN SPACE, IN CONJUNCTION WITH ALT-CO APPLICATION #:S00954132-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00954132-S1
05/23/2024
Permit issued — Construction Fence
S00954132-S4-FN
05/22/2024
Filed — Alteration CO
SUBMIT TEMPORARY CONSTRUCTION FENCE AT OPEN SPACE, IN CONJUNCTION WITH ALT-CO APPLICATION #:S00954132-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00954132-S4
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offREGAL CONSTRUCTION GROUP10/27/2025
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C11/13/2024
DOB NOWStructuralSigned-offREGAL CONSTRUCTION GROUP08/20/2024
DOB NOWConstruction FenceSigned-offREGAL CONSTRUCTION GROUP08/20/2024
DOB NOWMechanical SystemsPermit IssuedREGAL CONSTRUCTION GROUP08/19/2024
DOB NOWStructuralSigned-offREGAL CONSTRUCTION GROUP07/16/2024
DOB NOWGeneral ConstructionPermit IssuedREGAL CONSTRUCTION GROUP07/05/2024
DOB NOWConstruction FenceSigned-offREGAL CONSTRUCTION GROUP05/23/2024
1 project · most recent 10/23/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/23/2025Signed-off5 BORO'S PLUMBING INCGas, Storm, Water/Sanitary
2 projects · most recent 10/18/2024
General Wiring
FiledStatusContractorScope
10/18/2024CompleteTIMOTHY COLEMAN LICENSEDGeneral Wiring
10/15/2024CompleteTIMOTHY COLEMAN LICENSEDGeneral Wiring
1 project · most recent 10/23/2025
FiledStatusContractorScope
10/23/2025Signed-offREGAL CONSTRUCTION GROUP1 scope_items
1 project · most recent 10/23/2025
Fence
FiledStatusContractorScope
10/23/2025Signed-offREGAL CONSTRUCTION GROUPFence
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
12/02/2025Pass-Final CND-Occupancy InspectionPassView ↗
10/30/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
10/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/14/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/14/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/14/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 65
DateRequirementInspectorRole
10/27/2025Concrete - Cast-In-PlaceJIAN DENGspecial
10/27/2025Exterior Insulation and Finish Systems (EIFS)JIAN DENGspecial
10/27/2025Structural Stability – Alterations of existing buildingsJIAN DENGspecial
10/27/2025Mechanical SystemsJIAN DENGspecial
10/27/2025Fire-Resistant Penetrations and JointsJIAN DENGspecial
10/27/2025Energy Code Compliance InspectionsJIAN DENGprogress
10/27/2025Fire-Resistance Rated ConstructionJIAN DENGprogress
10/27/2025FinalJIAN DENGprogress
10/27/2025Electric vehicle service equipment requirementsJIAN DENGenergy_progress
10/27/2025Fenestration and door U-factor and product ratingsJIAN DENGenergy_progress
10/27/2025HVAC-R and service water piping design and insulationJIAN DENGenergy_progress
10/27/2025Fenestration areasJIAN DENGenergy_progress
10/27/2025HVAC-R and service water heating system controlsJIAN DENGenergy_progress
10/27/2025Fenestration air leakageJIAN DENGenergy_progress
10/27/2025Air barrier - visual inspectionJIAN DENGenergy_progress
10/27/2025Permanent certificateJIAN DENGenergy_progress
10/27/2025Interior lighting powerJIAN DENGenergy_progress
10/27/2025Insulation placement and R valuesJIAN DENGenergy_progress
10/27/2025HVAC-R and service water heating equipmentJIAN DENGenergy_progress
10/23/2025Permanent certificateJIAN DENGenergy_progress
10/23/2025Concrete - Cast-In-PlaceJIAN DENGspecial
10/23/2025Exterior Insulation and Finish Systems (EIFS)JIAN DENGspecial
10/23/2025Fire-Resistant Penetrations and JointsJIAN DENGspecial
10/23/2025Mechanical SystemsJIAN DENGspecial
10/23/2025Structural Stability – Alterations of existing buildingsJIAN DENGspecial
Latest 25 of 65.
▾Documents — 127 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/18/2026S00954132-P3Request digital key ↗
08/18/2026S00954132-P4Request digital key ↗
08/18/2026S00954132-P5Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits1
▸BISBPP-5 - Authorization to the Department of Transportation1
12/19/2024540265470Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram4
08/18/2026S00954132-P5Open ↗
08/18/2026S00954132-P2Open ↗
08/18/2026S00954132-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/18/2026S00954132-P2Open ↗
08/18/2026S00954132-I1Open ↗
08/18/2026S00954132-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/18/2026S00954132-I1Open ↗
▸Seals & Professional Certifications75
▸DOB NOWProgress Inspector Seal & Signature45
09/02/2026S00954132-P4Open ↗
08/29/2026S00954132-S2Open ↗
08/29/2026S00954132-S2Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/02/2026S00954132-P4Open ↗
08/29/2026S00954132-S2Open ↗
08/29/2026S00954132-S2Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/18/2026S00954132-P3Open ↗
08/18/2026S00954132-P4Open ↗
08/18/2026S00954132-P5Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/26/2024540265470Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/18/2026S00954132-P5Open ↗
08/18/2026S00954132-P2Open ↗
08/18/2026S00954132-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/18/2026S00954132-P3Open ↗
08/18/2026S00954132-P4Open ↗
08/18/2026S00954132-P5Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
12/19/2024540265470Open ↗
▸Other Documents21
▸DOB NOWSite Survey: Initial4
08/18/2026S00954132-P5Open ↗
08/18/2026S00954132-P2Open ↗
08/18/2026S00954132-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/18/2026S00954132-P3Open ↗
08/18/2026S00954132-P5Open ↗
08/18/2026S00954132-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/18/2026S00954132-P3Open ↗
08/18/2026S00954132-P5Open ↗
08/18/2026S00954132-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/18/2026S00954132-P3Open ↗
08/18/2026S00954132-P5Open ↗
08/18/2026S00954132-P2Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
12/19/2024540265470Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
11/26/2024540265470Open ↗
▸BISWAIVER OF CURB ALIGNMENT1
12/19/2024540265470Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
11/26/2024540265470Open ↗
▸DOB NOWFinal Survey1
08/18/2026S00954132-I1Open ↗