| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/13/2024 | Complete | ZENA ELECTRIC INC | General Wiring |
| 07/06/2018 | Complete | STANCO SYSTEM ELEC'L CONT | — |
| Owner | Filings | Most Recent |
|---|---|---|
| NEW YORK PUBLIC LIBRARY | 9 | 09/13/2026 |
| ADVANCED CONSTRUCTION EQUIPMENT COR | 4 | 07/08/2026 |
| OWNER OF 2000 CLARKE AVE | 1 | 03/22/2026 |
| DEPT OF GENERAL SERVIC856 | 1 | 03/22/2026 |
| GATEWAY CATHEDRAL INC | 2 | 03/22/2026 |
| DEPT OF DESIGN CONSTRUCTION | 4 | 03/21/2026 |
| NEW YORK CITY DDC | 2 | 03/21/2026 |
| DEPT OF GENERAL SERVICES | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| SOCOTEC ENGINEERING INC. | 2 | 07/23/2026 |
| VENEZIA ENGINEERING, LLC | 1 | 08/30/2024 |
| KEVIN GALLEN PE LLC | 1 | 06/21/2024 |
| AK CONSULTING SERVICES, INC | 1 | 08/01/2018 |
| JOEL PHAGOO P.E. PLLC | 1 | 07/06/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| A1 EXPEDITING SERVICE | 2 | 03/21/2026 |
| BMB BUILDING CONSULTING | 4 | 03/21/2026 |
| AK CONSULTING SERVICES | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| ADVANCED CONSTRUCTION EQUIPMENT | General Contractor | 4 | 07/08/2026 |
| C. D. E. AIR-CONDITIONING | General Contractor | 2 | 07/08/2026 |
| FRANCIS CAPORALE | Electrical | 1 | 03/21/2026 |
| ZENA ELECTRIC INC | Electrical | 1 | 03/22/2026 |
| CHRISTOPHER PALLARINO | Electrical | 1 | 03/21/2026 |
| ARMSTRONG ROOFING CORP | General Contractor | 1 | 07/08/2026 |
| MAMAIS CONTRACTING CORP | General Contractor | 1 | 07/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| SOCOTEC ENGINEERING | 4983 | 2 | 07/23/2026 |
| BENAZZI ENGINEERING, PC | 5603 | 2 | 08/30/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Signed-off | MAMAIS CONTRACTING CORP | 07/21/2026 |
| DOB NOW | Mechanical Systems | Signed-off | C. D. E. AIR-CONDITIONING | 11/18/2024 |
| DOB NOW | Structural | Signed-off | C. D. E. AIR-CONDITIONING | 11/12/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | ADVANCED CONSTRUCTION EQU | 11/02/2018 |
| DOB NOW | Construction Fence | Signed-off | ARMSTRONG ROOFING CORP | 08/03/2018 |
| DOB NOW | Sidewalk Shed | Signed-off | ADVANCED CONSTRUCTION EQU | 07/07/2018 |
| BIS | PL | ISSUED | MAR-SAL PLBG & HTG, INC | 09/05/2018 |
| BIS | OT | ISSUED | ARMSTRONG ROOFING CORP | 07/30/2018 |
| BIS | MH | ISSUED | ALLCOUNTY PLUMBING & HEATING COR | 08/31/2006 |
| BIS | OT | ISSUED | ALLCOUNTY PLUMBING & HEATING | 08/30/2006 |
| BIS | PL | ISSUED | ACCURATE MECHANICAL INC | 12/10/2004 |
| BIS | OT | ISSUED | PAV-LAK CONTRACTING INC | 01/26/2004 |
| BIS | PL | ISSUED | PRONTO PLBG & HTG. CORP. | 02/01/1996 |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/24/2026 | Final | ALEXIS SCHLESSINGERMAN | progress |
| 07/24/2026 | Structural Steel - Welding | ALEXIS SCHLESSINGERMAN | special |
| 07/24/2026 | Structural Stability – Alterations of existing buildings | ALEXIS SCHLESSINGERMAN | special |
| 07/24/2026 | Structural Steel - Details | ALEXIS SCHLESSINGERMAN | special |
| 07/24/2026 | Post-installed Anchors | ALEXIS SCHLESSINGERMAN | special |
| 07/24/2026 | Structural Steel - High Strength Bolting | ALEXIS SCHLESSINGERMAN | special |
| 07/22/2026 | Structural Stability – Alterations of existing buildings | ALEXIS SCHLESSINGERMAN | special |
| 07/22/2026 | Post-installed Anchors | ALEXIS SCHLESSINGERMAN | special |
| 07/22/2026 | Final | ALEXIS SCHLESSINGERMAN | progress |
| 07/22/2026 | Structural Steel - Welding | ALEXIS SCHLESSINGERMAN | special |
| 07/22/2026 | Structural Steel - High Strength Bolting | ALEXIS SCHLESSINGERMAN | special |
| 07/22/2026 | Structural Steel - Details | ALEXIS SCHLESSINGERMAN | special |
| 08/26/2024 | Structural Steel - Details | Gregory Benazzi | special |
| 08/26/2024 | Structural Steel - High Strength Bolting | Gregory Benazzi | special |
| 08/26/2024 | Structural Steel - Welding | Gregory Benazzi | special |
| 08/26/2024 | Post-installed Anchors | Gregory Benazzi | special |
| 08/01/2024 | Final | Gregory Benazzi | progress |
| 07/30/2024 | Duct leakage testing, insulation and design | Gregory Benazzi | energy_progress |
| 07/30/2024 | Post-installed Anchors | Gregory Benazzi | special |
| 07/30/2024 | Fire-Resistant Penetrations and Joints | Gregory Benazzi | special |
| 06/04/2024 | Shutoff dampers | Gregory Benazzi | energy_progress |
| 06/04/2024 | HVAC-R and service water piping design and insulation | Gregory Benazzi | energy_progress |
| 06/04/2024 | Maintenance information | Gregory Benazzi | energy_progress |
| 06/04/2024 | HVAC-R and service water heating equipment | Gregory Benazzi | energy_progress |
| 06/04/2024 | HVAC-R and service water heating system controls | Gregory Benazzi | energy_progress |