← Back
One story - permanent living quarter
143 GURLEY AVENUE
STATEN ISLAND · BIN 5062075
💬 Discuss this project
1940Year Built
1.5Stories
A2Building Class
R2Zoning
1,080 sfGross Floor Area
1Units
One story - permanent living quarter · 4,500 sf lot · 0.24 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 28p · 1 filing · 20 docs
Floor 110p · 2 filings · 20 docs
Basement8p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEVEN R. SAVINO ARCHITECT PC611/07/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FAM & HENRY HOME IMPROVEMGeneral Contractor303/21/2026
M.A.C. PLUMBING, INCPlumbing207/08/2026
SAGONA LANDSCAPING LTDGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STEVEN R. SAVINO ARCHIT1216202/19/2025
Building Lifecycle
All (59)Filed (6)Permit Issued (4)Signed Off (4)Inspection (9)Objection (6)Special Inspection (30)
07/31/2026
Signed off — Alteration CO
ADMINISTRATIVE FILING FOR APPLICATION NO. 500164993 THAT WAS APPROVED PERMITTED BUT EXPIRED BY LIMITATION AND OBTAIN A NEW CO.
S00971370-I1
02/25/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/25/2026
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
12/18/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/03/2025
Signed off — Alteration
OBTAIN A CURB CUT NO. FOR THE EXISTING CURB CUT.
S01063578-I1
12/02/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/28/2025
Permit issued — Curb Cut
S01063578-I1-CC
11/07/2025
Filed — Alteration
OBTAIN A CURB CUT NO. FOR THE EXISTING CURB CUT.
S01063578-I1
10/27/2025
Signed off — Alteration
Installation of the plumbing fixtures on the second floor, relocation of plumbing fixtures on the first floor as shown on the original approved filing and passed roughing inspection.
S00969300-I1
10/14/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/08/2025
Filed — Alteration
Installation of the plumbing fixtures on the second floor, relocation of plumbing fixtures on the first floor as shown on the original approved filing and passed roughing inspection.
S00969300-P3
02/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Savino
02/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Steven Savino
02/28/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
02/28/2025
Special inspection requirement — Concrete - Cast-In-Place
Steven Savino
02/28/2025
Special inspection requirement — Subgrade Inspections
Steven Savino
02/28/2025
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
02/28/2025
Special inspection requirement — Fire-Resistance Rated Construction
Steven Savino
02/28/2025
Special inspection requirement — Air barrier — testing
Steven Savino
02/28/2025
Special inspection requirement — Insulation placement and R values
Steven Savino
02/28/2025
Special inspection requirement — Fenestration areas
Steven Savino
02/28/2025
Special inspection requirement — Fenestration air leakage
Steven Savino
02/28/2025
Special inspection requirement — Permanent certificate
Steven Savino
02/28/2025
Special inspection requirement — Lighting in dwelling units
Steven Savino
02/28/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Steven Savino
02/26/2025
Objection resolved — Addressed
02/24/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/24/2025
Objection raised — Scope
02/24/2025
Objection raised — Scope
02/24/2025
Objection resolved — Addressed
02/19/2025
Filed — Alteration CO
ADMINISTRATIVE FILING FOR APPLICATION NO. 500164993 THAT WAS APPROVED PERMITTED BUT EXPIRED BY LIMITATION AND OBTAIN A NEW CO.
S00971370-P1
02/19/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Steven Savino
02/19/2025
Special inspection requirement — Fenestration areas
Steven Savino
02/19/2025
Special inspection requirement — Fenestration air leakage
Steven Savino
02/19/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Steven Savino
02/19/2025
Special inspection requirement — Air barrier — testing
Steven Savino
02/19/2025
Special inspection requirement — Permanent certificate
Steven Savino
02/19/2025
Special inspection requirement — Lighting in dwelling units
Steven Savino
02/19/2025
Special inspection requirement — Insulation placement and R values
Steven Savino
02/19/2025
Special inspection requirement — Fenestration areas
Steven Savino
02/19/2025
Special inspection requirement — Insulation placement and R values
Steven Savino
02/19/2025
Special inspection requirement — Fenestration air leakage
Steven Savino
02/19/2025
Special inspection requirement — Air barrier — testing
Steven Savino
02/19/2025
Special inspection requirement — Lighting in dwelling units
Steven Savino
02/19/2025
Special inspection requirement — Permanent certificate
Steven Savino
02/19/2025
Special inspection requirement — Concrete - Cast-In-Place
Steven Savino
02/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Savino
01/29/2025
Signed off — Alteration
Installation of the plumbing fixtures on the second floor, relocation of plumbing fixtures on the first floor as shown on the original approved filing and passed roughing inspection.
S00969300-S1
01/22/2025
Permit issued — General Construction
S00971370-I1-GC
01/10/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/08/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/24/2024
Permit issued — Plumbing
S00969300-S1-PL
12/23/2024
Permit issued — Plumbing
S00969300-I1-PL
12/17/2024
Filed — Alteration
Installation of the plumbing fixtures on the second floor, relocation of plumbing fixtures on the first floor as shown on the original approved filing and passed roughing inspection.
S00969300-S1
12/10/2024
Objection resolved — Addressed
09/23/2024
Filed — Alteration
Installation of the plumbing fixtures on the second floor, relocation of plumbing fixtures on the first floor as shown on the original approved filing and passed roughing inspection.
S00969300-I1
08/28/2024
Objection raised — Scope
07/31/2024
Filed — Alteration CO
ADMINISTRATIVE FILING FOR APPLICATION NO. 500164993 THAT WAS APPROVED PERMITTED BUT EXPIRED BY LIMITATION AND OBTAIN A NEW CO.
S00971370-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offSAGONA LANDSCAPING LTD11/28/2025
DOB NOWGeneral ConstructionPermit IssuedFAM & HENRY HOME IMPROVEM01/22/2025
DOB NOWPlumbingSigned-offM.A.C. PLUMBING, INC12/24/2024
DOB NOWPlumbingSigned-offM.A.C. PLUMBING, INC12/23/2024
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
02/25/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/25/2026Certified Sprinkler - SP - RoughingCertifiedView ↗
12/18/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/02/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
10/14/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/08/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
02/28/2025Fire-Resistant Penetrations and JointsSteven Savinospecial
02/28/2025Structural Stability – Alterations of existing buildingsSteven Savinospecial
02/28/2025Subsurface Investigations (Borings/Test Pits)anthony santorospecial
02/28/2025Concrete - Cast-In-PlaceSteven Savinospecial
02/28/2025Subgrade InspectionsSteven Savinospecial
02/28/2025Energy Code Compliance InspectionsSteven Savinoprogress
02/28/2025Fire-Resistance Rated ConstructionSteven Savinoprogress
02/28/2025Air barrier — testing Steven Savinoenergy_progress
02/28/2025Insulation placement and R valuesSteven Savinoenergy_progress
02/28/2025Fenestration areasSteven Savinoenergy_progress
02/28/2025Fenestration air leakageSteven Savinoenergy_progress
02/28/2025Permanent certificateSteven Savinoenergy_progress
02/28/2025Lighting in dwelling unitsSteven Savinoenergy_progress
02/28/2025Fenestration and door U-factor and product ratingsSteven Savinoenergy_progress
02/19/2025Fenestration and door U-factor and product ratingsSteven Savinoenergy_progress
02/19/2025Fenestration areasSteven Savinoenergy_progress
02/19/2025Fenestration air leakageSteven Savinoenergy_progress
02/19/2025Fenestration and door U-factor and product ratingsSteven Savinoenergy_progress
02/19/2025Air barrier — testing Steven Savinoenergy_progress
02/19/2025Permanent certificateSteven Savinoenergy_progress
02/19/2025Lighting in dwelling unitsSteven Savinoenergy_progress
02/19/2025Insulation placement and R valuesSteven Savinoenergy_progress
02/19/2025Fenestration areasSteven Savinoenergy_progress
02/19/2025Insulation placement and R valuesSteven Savinoenergy_progress
02/19/2025Fenestration air leakageSteven Savinoenergy_progress
Latest 25 of 35.
▾Documents — 74 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/18/2026S00969300-I1Request digital key ↗
08/18/2026S00969300-P3Request digital key ↗
08/18/2026S00969300-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
03/28/2024540263212Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
02/13/2025500164993Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S00971370-I1Open ↗
08/13/2026S00971370-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026S00971370-P1Open ↗
08/13/2026S00971370-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S00971370-P1Open ↗
08/13/2026S00971370-I1Open ↗
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature16
08/27/2026S00971370-P1Open ↗
08/25/2026S00971370-I1Open ↗
08/25/2026S00971370-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/18/2026S00969300-S1Open ↗
08/18/2026S00969300-I1Open ↗
08/18/2026S00969300-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/27/2026S00971370-P1Open ↗
08/27/2026S00971370-P1Open ↗
08/25/2026S00971370-I1Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
03/06/2024540263212Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/06/2024540263212Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist2
08/13/2026S00971370-I1Open ↗
08/13/2026S00971370-P1Open ↗
▸DOB NOWStreet Tree Sign Off2
08/14/2026S00971370-I1Open ↗
08/13/2026S00971370-I1Open ↗
▸DOB NOWStreet Trees Site Plan2
08/14/2026S00971370-I1Open ↗
08/13/2026S00971370-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00971370-I1Open ↗
▸Inspections & Test Reports8
▸DOB NOWSOIL REPORT4
08/13/2026S00971370-P1Open ↗
08/13/2026S00969300-P3Open ↗
08/13/2026S00969300-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026S00969300-I1Open ↗
08/13/2026S00971370-I1Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
03/06/2024540263212Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/06/2024540263212Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
03/28/2024540263212Open ↗
▸BISNYS DEC FRESHWATER WETLANDS APPROVAL1
03/28/2024540263212Open ↗
▸Other Documents15
▸DOB NOWPlot Diagram2
08/13/2026S00971370-P1Open ↗
08/13/2026S00971370-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/13/2026S00971370-P1Open ↗
08/13/2026S00971370-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026S00971370-I1Open ↗
08/13/2026S00971370-P1Open ↗
▸DOB NOWFinal Survey2
08/14/2026S00971370-I1Open ↗
08/13/2026S00971370-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00971370-P1Open ↗
08/13/2026S00971370-I1Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
03/06/2024540263212Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
03/28/2024540263212Open ↗
▸BISNYS DEC FRESHWATER WETLANDS MAP1
03/06/2024540263212Open ↗
▸BISWAIVER OF CURB ALIGNMENT1
03/28/2024540263212Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
03/06/2024540263212Open ↗