← Back
One story - permanent living quarter
189 GIFFORDS LANE
STATEN ISLAND · BIN 5062373
💬 Discuss this project
1955Year Built
1Stories
A2Building Class
R2Zoning
1,504 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story - permanent living quarter · 6,000 sf lot · 0.25 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
Nothing on file for this building.
Building Lifecycle
All (12)Filed (2)Permit Issued (2)Signed Off (2)Violation (3)Inspection (1)Special Inspection (2)
05/27/2025
Signed off — Alteration
APPLICATION FILED HEREWITH SOLELY FOR RETAINING WALL THAT WAS FILED UNDER ALTERNATE ALT 2 APPLICATION, HOWEVER JOB DESCRIPTION WAS WRITTEN INCORRECTLY.
S01201679-I1
05/02/2025
Violation issued (ECB, closed)
Construction
04/11/2025
Permit issued — General Construction
S01201679-I1-GC
03/27/2025
Filed — Alteration
APPLICATION FILED HEREWITH SOLELY FOR RETAINING WALL THAT WAS FILED UNDER ALTERNATE ALT 2 APPLICATION, HOWEVER JOB DESCRIPTION WAS WRITTEN INCORRECTLY.
S01201679-I1
03/27/2025
Special inspection requirement — Concrete - Cast-In-Place
03/27/2025
Special inspection requirement — Final
MICHAEL DERUVO
09/30/2024
Signed off — Alteration
S08053164-I1
09/18/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/12/2023
Permit issued — General Construction
S08053164-I1-GC
12/16/2022
Filed — Alteration
S08053164-I1
08/29/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MICHAEL DERUVO & ASSOC. ARCHITECTS203/27/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L. GASS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.N.C. CONTRACTING CO.,INGeneral Contractor307/08/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offA.N.C. CONTRACTING CO.,IN04/11/2025
DOB NOWGeneral ConstructionSigned-offA.N.C. CONTRACTING CO.,IN12/12/2023
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/18/2024Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
03/27/2025Concrete - Cast-In-Place—special
03/27/2025FinalMICHAEL DERUVOprogress
▾Documents — 5 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026S08053164-I1Request digital key ↗
08/19/2026S01201679-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/23/2026S08053164-I1Open ↗
08/13/2026S01201679-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026S01201679-I1Open ↗