← Back
One family attached or semi-detached
9 WATERSIDE PARKWAY
STATEN ISLAND · BIN 5065989
💬 Discuss this project
1975Year Built
2Stories
A5Building Class
R3-2Zoning
1,260 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 2,520 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Basement2p · 1 filing · 4 docs
Nothing on file for this building.
Building Lifecycle
All (13)Filed (2)Permit Issued (2)Signed Off (2)Violation (2)Inspection (4)Special Inspection (1)
11/15/2022
Signed off — Alteration
S00732262-I1
11/15/2022
Signed off — Alteration
THIS PLUMBING APPLICATION IS FILED IN CONJUNCTION WITH BUILDING ALT-2 APPLICATION # X00613044-I1 FOR MINOR PLUMBING WORK, REPLACE EX. PL FIX.,NEW POWDER ROOM AT 1ST FLOOR, NO GAS WORK, NO CHANGE OF USE, EGRESS OR OCCUPANCY
S00760316-I1
10/20/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/13/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/13/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/19/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/28/2022
Permit issued — Plumbing
S00760316-I1-PL
07/15/2022
Filed — Alteration
THIS PLUMBING APPLICATION IS FILED IN CONJUNCTION WITH BUILDING ALT-2 APPLICATION # X00613044-I1 FOR MINOR PLUMBING WORK, REPLACE EX. PL FIX.,NEW POWDER ROOM AT 1ST FLOOR, NO GAS WORK, NO CHANGE OF USE, EGRESS OR OCCUPANCY
S00760316-I1
07/07/2022
Permit issued — General Construction
S00732262-I1-GC
06/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
NASHAT IBRAHIM
05/10/2022
Filed — Alteration
S00732262-I1
06/27/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/05/2018
Violation issued (ECB, closed)
Construction
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NMI ARCHITECTURE, PLLC207/15/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NMI ARCHITECTURE PLLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKY LINE BUILDERS USA INCGeneral Contractor107/08/2026
MEGA PLBG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NMI ARCHITECTURE, PLLC6825207/15/2022
JUN YAN, PE7170105/10/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMEGA PLBG CORP07/28/2022
DOB NOWGeneral ConstructionSigned-offSKY LINE BUILDERS USA INC07/07/2022
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/20/2022Pass-Final General Construction Non-Directive 14PassView ↗
09/13/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/13/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/19/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
06/18/2022Fire-Resistant Penetrations and JointsNASHAT IBRAHIMspecial
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/24/2026S00732262-I1Request digital key ↗
08/24/2026S00760316-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/24/2026S00732262-I1Open ↗
08/13/2026S00760316-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/20/2026S00760316-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/24/2026S00732262-I1Open ↗
08/13/2026S00760316-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00732262-I1Open ↗