← Back
STATEN ISLAND
315 HILLSIDE TERRACE
STATEN ISLAND · BIN 5066114
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
4 Open Violations 1 unresolved · 3 paperwork only ▸FDNY Report ↗
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 03/21/2026
Wood
FiledStatusContractorScope
03/21/2026——Wood
1 job · most recent 03/31/2026
Fence
FiledStatusContractorScope
03/31/2026Permit IssuedEARL LYNGSTAD INCFence
Building Lifecycle
All (44)Filed (3)Permit Issued (2)Signed Off (1)Violation (13)Objection (3)Special Inspection (22)
07/01/2026
Signed off — Full Demolition
FULL HAND DEMOLITION OF A 1 STORY FRAME BUILDING USING HANDHELD DEVICES. FOUNDATION TO BE REMOVED USING MECHANICAL MEANS
S01348299-I1
06/17/2026
Permit issued — Full Demolition
S01348299-I1-FD
06/05/2026
Permit issued — Construction Fence
S01348289-I1-FN
05/01/2026
Objection raised — Scope
04/22/2026
Objection raised — Admin
04/22/2026
Objection resolved — Addressed
04/09/2026
Filed — Full Demolition
FULL HAND DEMOLITION OF A 1 STORY FRAME BUILDING USING HANDHELD DEVICES. FOUNDATION TO BE REMOVED USING MECHANICAL MEANS
S01348299-I1
03/31/2026
Filed — Alteration
PROPOSED 8' PLYWOOD CONSTRUCTION FENCE
S01348289-I1
03/21/2026
Filed — New Building
Construct a two-family residence with (2) one-car garages.
S01371162-I1
03/12/2026
Special inspection requirement — Concrete - Cast-In-Place
03/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/12/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
03/12/2026
Special inspection requirement — Subgrade Inspections
03/12/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
03/12/2026
Special inspection requirement — Final
03/12/2026
Special inspection requirement — Lowest Floor Elevation
03/12/2026
Special inspection requirement — Footing and Foundation
03/12/2026
Special inspection requirement — Energy Code Compliance Inspections
03/12/2026
Special inspection requirement — Fire-Resistance Rated Construction
03/12/2026
Special inspection requirement — Structural Wood Frame
03/12/2026
Special inspection requirement — Insulation placement and R values
03/12/2026
Special inspection requirement — Electric vehicle service equipment requirements
03/12/2026
Special inspection requirement — Interior lighting power
03/12/2026
Special inspection requirement — Fenestration air leakage
03/12/2026
Special inspection requirement — Air barrier — testing
03/12/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
03/12/2026
Special inspection requirement — Fenestration areas
03/12/2026
Special inspection requirement — Air barrier - visual inspection
03/12/2026
Special inspection requirement — Maintenance information
03/12/2026
Special inspection requirement — Permanent certificate
03/12/2026
Special inspection requirement — Metering
05/24/2010
Violation issued (ECB, closed)
Construction
04/23/2010
Violation issued (ECB, closed)
Construction
02/18/2010
Violation issued (ECB, closed)
Construction
02/18/2010
Violation issued (ECB, closed)
Construction
02/12/2010
Violation issued (HPD, open)
B
01/29/2010
Violation issued (ECB, open)
Construction
11/20/2009
Violation issued (ECB, open)
Construction
10/29/2009
Violation issued (ECB, open)
Construction
11/07/2003
Violation issued (ECB, closed)
Construction
11/07/2003
Violation issued (ECB, closed)
Construction
10/03/2003
Violation issued (ECB, closed)
Construction
04/11/2003
Violation issued (ECB, closed)
Construction
09/06/1996
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
C&P DESIGN CONSULTANTS204/09/2026
STANLEY M. KREBUSHEVSKI, R.A.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EARL LYNGSTAD INCGeneral Contractor207/03/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFull DemolitionSigned-offEARL LYNGSTAD INC06/17/2026
DOB NOWConstruction FencePermit IssuedEARL LYNGSTAD INC06/05/2026
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
03/12/2026Concrete - Cast-In-Place—special
03/12/2026Fire-Resistant Penetrations and Joints—special
03/12/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
03/12/2026Subgrade Inspections—special
03/12/2026Subsurface Investigations (Borings/Test Pits)—special
03/12/2026Final—progress
03/12/2026Lowest Floor Elevation—progress
03/12/2026Footing and Foundation—progress
03/12/2026Energy Code Compliance Inspections—progress
03/12/2026Fire-Resistance Rated Construction—progress
03/12/2026Structural Wood Frame—progress
03/12/2026Insulation placement and R values—energy_progress
03/12/2026Electric vehicle service equipment requirements—energy_progress
03/12/2026Interior lighting power—energy_progress
03/12/2026Fenestration air leakage—energy_progress
03/12/2026Air barrier — testing —energy_progress
03/12/2026Fenestration and door U-factor and product ratings—energy_progress
03/12/2026Fenestration areas—energy_progress
03/12/2026Air barrier - visual inspection—energy_progress
03/12/2026Maintenance information—energy_progress
03/12/2026Permanent certificate—energy_progress
03/12/2026Metering—energy_progress
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/26/2026S01348289-I1Request digital key ↗
08/17/2026S01348299-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
02/19/2026540269449Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
02/19/2026540269449Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S01371162-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S01371162-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/26/2026S01348289-I1Open ↗
08/17/2026S01348299-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
02/19/2026540269449Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWSewer Cut-Off1
08/17/2026S01348299-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/17/2026S01348299-I1Open ↗
▸DOB NOWWater Cut-Off1
08/17/2026S01348299-I1Open ↗
▸DOB NOWGas Cut-Off1
08/17/2026S01348299-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026S01371162-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026S01348299-I1Open ↗
▸DOB NOWRodent Control1
08/17/2026S01348299-I1Open ↗
▸Inspections & Test Reports2
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
02/19/2026540269449Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
02/19/2026540269449Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
02/19/2026540269449Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
02/19/2026540269449Open ↗
▸Other Documents11
▸BISBPP - SUPPORTING DOCUMENTATION2
03/06/2026540269449Open ↗
02/19/2026540269449Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
03/06/2026540269449Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
03/06/2026540269449Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
02/19/2026540269449Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S01371162-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/17/2026S01348299-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/17/2026S01348299-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/17/2026S01348299-I1Open ↗
▸DOB NOWStructure Photographs1
08/17/2026S01348299-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S01371162-I1Open ↗