← Back
Two stories - detached, small or mid-size
6 SHERWOOD PLACE
STATEN ISLAND · BIN 5066308
💬 Discuss this project
1955Year Built
2Stories
A1Building Class
R3AZoning
3,500 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 8,541 sf lot · 0.41 FAR built · Flood zone X
Locations of Work
Architecture
Floor 21p · 1 filing · 2 docs
Floor 1
Cellar1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PERMANENT ENGINEERING P.C.403/30/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SCARAN OIL SERVICE INCGeneral Contractor307/08/2026
R&M PIPING & HTG INCPlumbing107/08/2026
SCARAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738108/01/2024
RELIANCE ENGINEERING, P.C322108/01/2024
Building Lifecycle
All (20)Filed (4)Permit Issued (4)Signed Off (4)Inspection (6)Special Inspection (2)
06/18/2025
Signed off — Alteration
Curb Cut filing for a non-existent curb as per survey #36529 street gravel and no curbs at street. BPP has been waived all curbs as per BPP #500776742. CC filed to obtain a number for CO.
S01202250-I1
04/17/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
04/09/2025
Permit issued — Curb Cut
S01202250-I1-CC
03/30/2025
Filed — Alteration
Curb Cut filing for a non-existent curb as per survey #36529 street gravel and no curbs at street. BPP has been waived all curbs as per BPP #500776742. CC filed to obtain a number for CO.
S01202250-I1
03/07/2025
Signed off — Alteration
S08033355-I1
02/19/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/10/2025
Signed off — Alteration
New Required Drywells and related storm piping and Drain filed under this filing, FOR ALT application 520467646-
S01082957-I1
01/29/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/22/2025
Signed off — Alteration
PROPOSED DECK AT REAR OF EXISTING RESIDENCE.
S01082878-I1
11/19/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/15/2024
Permit issued — Plumbing
S08033355-I1-PL
08/15/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/13/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/05/2024
Permit issued — Plumbing
S01082957-I1-PL
08/05/2024
Permit issued — General Construction
S01082878-I1-GC
08/01/2024
Filed — Alteration
S08033355-I1
08/01/2024
Filed — Alteration
New Required Drywells and related storm piping and Drain filed under this filing, FOR ALT application 520467646-
S01082957-I1
08/01/2024
Filed — Alteration
PROPOSED DECK AT REAR OF EXISTING RESIDENCE.
S01082878-I1
08/01/2024
Special inspection requirement — Concrete - Cast-In-Place
Ralph Giorgio
07/18/2024
Special inspection requirement — Final
Ralph Giorgio
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offSCARAN OIL SERVICE INC04/09/2025
DOB NOWPlumbingSigned-offSCARAN PLUMBING INC08/15/2024
DOB NOWPlumbingSigned-offR&M PIPING & HTG INC08/05/2024
DOB NOWGeneral ConstructionSigned-offSCARAN OIL SERVICE INC08/05/2024
BIS—ISSUEDN/A09/04/2024
BIS—ISSUEDCHAMPION CONSTRUCTION CORP04/27/2006
BISPLISSUEDJAM SEWER CLEANING SVC11/02/2005
BIS—ISSUEDCHAMPION CONSTRUCTION CORP10/17/2005
1 project · most recent 06/10/2025
General Wiring
FiledStatusContractorScope
06/10/2025CompletePLAZA ELEC'L CONTR'S. INCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/17/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
02/19/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/19/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/15/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/13/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
08/01/2024Concrete - Cast-In-PlaceRalph Giorgiospecial
07/18/2024FinalRalph Giorgioprogress
▾Documents — 41 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/21/2026S08033355-I1Request digital key ↗
08/21/2026S01082957-I1Request digital key ↗
08/21/2026S01082878-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION8
07/18/2025520467646Open ↗
07/18/2025520467646Open ↗
03/31/2025500788793Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/22/2024520467646Open ↗
▸BISWORK PERMIT APPLICATION1
09/04/2024520467646Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
02/04/2025520467646Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
02/04/2025520467646Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/21/2026S01082878-I1Open ↗
08/13/2026S01202250-I1Open ↗
08/13/2026S08033355-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/04/2022520467646Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/31/2026S01082878-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/31/2026S01082878-I1Open ↗
▸Trade Schedules & Equipment2
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
02/04/2025520467646Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
02/04/2025520467646Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
08/02/2024520467646Open ↗
▸BISSTREET TREE SIGNOFF1
02/04/2025520467646Open ↗
▸Energy Compliance1
▸BISNYCECC ANALYSIS1
08/12/2024520467646Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/13/2025520467646Open ↗
03/12/2025520467646Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
04/02/2025520467646Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
04/02/2025520467646Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
04/02/2025520467646Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S01082957-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S01082957-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISNYS DEC FRESHWATER WETLANDS APPROVAL1
08/11/2023520467646Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
08/31/2023520467646Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
06/25/2025520467646Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
04/08/2025520467646Open ↗
▸BISEFILING COVER SHEET1
11/04/2022520467646Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
11/07/2022520467646Open ↗