← Back
Two stories - detached, small or mid-size
331 WINCHESTER AVENUE
STATEN ISLAND · BIN 5067312
💬 Discuss this project
1960Year Built
1Stories
A1Building Class
R3AZoning
1,936 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: ASV DEVELOPERS LLC · 4,000 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Floor 215p · 1 filing · 20 docs
Floor 116p · 1 filing · 20 docs
Cellar16p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EMBA REALTY707/08/2026
SORRENTINO DEVELOPMENT103/22/2026
ASV DEVELOPERS603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RYAN DESIGN ARCHITECTURE605/08/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SORRENTINO DEVELOPMENTGeneral Contractor307/08/2026
RELIABLE PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RYAN DESIGN ARCHITECTURE7159805/08/2025
Building Lifecycle
All (93)Filed (6)Permit Issued (3)Signed Off (2)Violation (1)Inspection (9)Objection (42)Special Inspection (30)
10/08/2025
Signed off — Alteration CO
NEW SECOND FLOOR and EXTENSION AT FIRST FLOOR TO EXISTING ONE FAMILY DETACHED RESIDENCE
S01000955-S3
08/24/2025
Signed off — Alteration CO
NEW SECOND FLOOR and EXTENSION AT FIRST FLOOR TO EXISTING ONE FAMILY DETACHED RESIDENCE
S01000955-S1
08/20/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/12/2025
Special inspection requirement — Interior lighting power
Daniel Ryan
06/12/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Daniel Ryan
06/12/2025
Special inspection requirement — Permanent certificate
Daniel Ryan
06/12/2025
Special inspection requirement — Fenestration air leakage
Daniel Ryan
06/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Daniel Ryan
06/12/2025
Special inspection requirement — Concrete - Cast-In-Place
Daniel Ryan
06/12/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Daniel Ryan
06/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel Ryan
06/12/2025
Special inspection requirement — Subgrade Inspections
Daniel Ryan
06/12/2025
Special inspection requirement — Footing and Foundation
Daniel Ryan
06/12/2025
Special inspection requirement — Energy Code Compliance Inspections
Daniel Ryan
06/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
Daniel Ryan
06/12/2025
Special inspection requirement — Final
Daniel Ryan
06/12/2025
Special inspection requirement — Insulation placement and R values
Daniel Ryan
06/12/2025
Special inspection requirement — Air barrier - visual inspection
Daniel Ryan
06/12/2025
Special inspection requirement — Fenestration areas
Daniel Ryan
05/08/2025
Filed — Alteration CO
NEW SECOND FLOOR and EXTENSION AT FIRST FLOOR TO EXISTING ONE FAMILY DETACHED RESIDENCE
S01000955-P3
05/01/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
04/08/2025
Filed — Alteration CO
NEW SECOND FLOOR and EXTENSION AT FIRST FLOOR TO EXISTING ONE FAMILY DETACHED RESIDENCE
S01000955-P2
04/07/2025
Special inspection requirement — Concrete - Cast-In-Place
Daniel Ryan
04/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel Ryan
04/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Daniel Ryan
04/07/2025
Special inspection requirement — Subgrade Inspections
Daniel Ryan
04/07/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Daniel Ryan
04/07/2025
Special inspection requirement — Energy Code Compliance Inspections
Daniel Ryan
04/07/2025
Special inspection requirement — Final
Daniel Ryan
04/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
Daniel Ryan
04/07/2025
Special inspection requirement — Footing and Foundation
Daniel Ryan
04/07/2025
Special inspection requirement — Air barrier - visual inspection
Daniel Ryan
04/07/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Daniel Ryan
04/07/2025
Special inspection requirement — Insulation placement and R values
Daniel Ryan
04/07/2025
Special inspection requirement — Fenestration air leakage
Daniel Ryan
04/07/2025
Special inspection requirement — Interior lighting power
Daniel Ryan
02/19/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/03/2025
Filed — Alteration CO
NEW SECOND FLOOR and EXTENSION AT FIRST FLOOR TO EXISTING ONE FAMILY DETACHED RESIDENCE
S01000955-P1
01/29/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/11/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/07/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/07/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/02/2024
Violation issued (ECB, closed)
Construction
09/18/2024
Permit issued — Plumbing
S01000955-S3-PL
09/09/2024
Objection resolved — Addressed
09/09/2024
Objection resolved — Addressed
09/09/2024
Objection resolved — Addressed
09/09/2024
Objection resolved — Addressed
09/09/2024
Objection resolved — Addressed
09/09/2024
Objection resolved — Addressed
08/15/2024
Objection raised — Fire_Protection
08/15/2024
Objection raised — Other
08/15/2024
Objection raised — Admin
08/15/2024
Objection raised — Other
08/15/2024
Objection raised — Scope
08/15/2024
Objection raised — Fire_Protection
08/08/2024
Filed — Alteration CO
NEW SECOND FLOOR and EXTENSION AT FIRST FLOOR TO EXISTING ONE FAMILY DETACHED RESIDENCE
S01000955-S3
08/08/2024
Permit issued — General Construction
S01000955-I1-GC-CX
07/12/2024
Objection resolved — Addressed
07/10/2024
Permit issued — Construction Fence
S01000955-S1-FN
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offRELIABLE PLBG & HTG CORP09/18/2024
DOB NOWGeneral ConstructionPermit IssuedSORRENTINO DEVELOPMENT08/08/2024
DOB NOWConstruction FenceSigned-offSORRENTINO DEVELOPMENT07/10/2024
1 project · most recent 05/08/2025
Gas Water/Sanitary
FiledStatusContractorScope
05/08/2025Signed-offRELIABLE PLBG & HTG CORPGas, Water/Sanitary
1 project · most recent 11/10/2024
General Wiring
FiledStatusContractorScope
11/10/2024CompleteG-ELECTRIC INCGeneral Wiring
1 project · most recent 05/08/2025
Wood
FiledStatusContractorScope
05/08/2025Signed-offRELIABLE PLBG & HTG CORPWood
1 project · most recent 05/08/2025
Fence
FiledStatusContractorScope
05/08/2025Signed-offRELIABLE PLBG & HTG CORPFence
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/20/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/01/2025Fail-Final CND-Occupancy InspectionFailView ↗
02/19/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/29/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/07/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/07/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/16/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/08/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
06/12/2025Interior lighting powerDaniel Ryanenergy_progress
06/12/2025Fenestration and door U-factor and product ratingsDaniel Ryanenergy_progress
06/12/2025Permanent certificateDaniel Ryanenergy_progress
06/12/2025Fenestration air leakageDaniel Ryanenergy_progress
06/12/2025Structural Stability – Alterations of existing buildingsDaniel Ryanspecial
06/12/2025Concrete - Cast-In-PlaceDaniel Ryanspecial
06/12/2025Subsurface Investigations (Borings/Test Pits)Daniel Ryanspecial
06/12/2025Fire-Resistant Penetrations and JointsDaniel Ryanspecial
06/12/2025Subgrade InspectionsDaniel Ryanspecial
06/12/2025Footing and FoundationDaniel Ryanprogress
06/12/2025Energy Code Compliance InspectionsDaniel Ryanprogress
06/12/2025Fire-Resistance Rated ConstructionDaniel Ryanprogress
06/12/2025FinalDaniel Ryanprogress
06/12/2025Insulation placement and R valuesDaniel Ryanenergy_progress
06/12/2025Air barrier - visual inspectionDaniel Ryanenergy_progress
06/12/2025Fenestration areasDaniel Ryanenergy_progress
04/07/2025Concrete - Cast-In-PlaceDaniel Ryanspecial
04/07/2025Fire-Resistant Penetrations and JointsDaniel Ryanspecial
04/07/2025Structural Stability – Alterations of existing buildingsDaniel Ryanspecial
04/07/2025Subgrade InspectionsDaniel Ryanspecial
04/07/2025Subsurface Investigations (Borings/Test Pits)Daniel Ryanspecial
04/07/2025Energy Code Compliance InspectionsDaniel Ryanprogress
04/07/2025FinalDaniel Ryanprogress
04/07/2025Fire-Resistance Rated ConstructionDaniel Ryanprogress
04/07/2025Footing and FoundationDaniel Ryanprogress
Latest 25 of 36.
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/21/2026S01000955-P3Request digital key ↗
08/21/2026S01000955-P2Request digital key ↗
08/21/2026S01000955-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026S01000955-I1Open ↗
08/13/2026S01000955-P2Open ↗
08/13/2026S01000955-P3Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026S01000955-I1Open ↗
08/13/2026S01000955-P3Open ↗
08/13/2026S01000955-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S01000955-I1Open ↗
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature13
08/28/2026S01000955-P1Open ↗
08/25/2026S01000955-I1Open ↗
08/25/2026S01000955-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/28/2026S01000955-P1Open ↗
08/25/2026S01000955-I1Open ↗
08/25/2026S01000955-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/21/2026S01000955-I1Open ↗
08/21/2026S01000955-P3Open ↗
08/21/2026S01000955-P2Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026S01000955-P2Open ↗
08/13/2026S01000955-P3Open ↗
08/13/2026S01000955-I1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/13/2026S01000955-I1Open ↗
08/13/2026S01000955-P3Open ↗
08/13/2026S01000955-P2Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S01000955-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S01000955-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S01000955-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/21/2026S01000955-P3Open ↗
08/21/2026S01000955-P2Open ↗
08/21/2026S01000955-P1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/13/2026S01000955-P3Open ↗
08/13/2026S01000955-I1Open ↗
08/13/2026S01000955-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S01000955-I1Open ↗
▸Other Documents13
▸DOB NOWSite Survey: Initial3
08/13/2026S01000955-P2Open ↗
08/13/2026S01000955-I1Open ↗
08/13/2026S01000955-P3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026S01000955-P2Open ↗
08/13/2026S01000955-P3Open ↗
08/13/2026S01000955-I1Open ↗
▸DOB NOWPlot Diagram3
08/13/2026S01000955-I1Open ↗
08/13/2026S01000955-P2Open ↗
08/13/2026S01000955-P3Open ↗
▸DOB NOWProperty Ownership Certification3
08/21/2026S01000955-P3Open ↗
08/21/2026S01000955-P2Open ↗
08/21/2026S01000955-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026S01000955-I1Open ↗