← Back
One story - permanent living quarter
9 DAVID STREET
STATEN ISLAND · BIN 5067390
💬 Discuss this project
1945Year Built
1.67Stories
A2Building Class
R3AZoning
974 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story - permanent living quarter · Owner of record: FONTANA & SONS LLC · 4,000 sf lot · 0.24 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralFire Protection
Roof2p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 12p · 2 filings · 20 docs
Basement1p · 1 filing · 20 docs
3 jobs · most recent 11/06/2025
General Wiring
FiledStatusContractorScope
11/06/2025CompleteS.T.K. ELECTRICAL CORP.1 meters
07/25/2025CompleteS.T.K. ELECTRICAL CORP.General Wiring
07/24/2025CompleteS.T.K. ELECTRICAL CORP.1 meters
1 job · most recent 01/02/2026
Concrete Wood
FiledStatusContractorScope
01/02/2026Signed-offA. FONTANA & SONS LLCConcrete, Wood
Building Lifecycle
All (61)Filed (6)Permit Issued (7)Signed Off (4)Violation (1)Inspection (11)Objection (2)Special Inspection (30)
01/08/2026
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
Lawrence Mandarino
01/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Lawrence Mandarino
01/08/2026
Special inspection requirement — Concrete - Cast-In-Place
Lawrence Mandarino
01/08/2026
Special inspection requirement — Subgrade Inspections
Lawrence Mandarino
01/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Lawrence Mandarino
01/08/2026
Special inspection requirement — Wood – Prefabricated I-Joists
Lawrence Mandarino
01/08/2026
Special inspection requirement — Footing and Foundation
Lawrence Mandarino
01/08/2026
Special inspection requirement — Structural Wood Frame
Lawrence Mandarino
01/08/2026
Special inspection requirement — Energy Code Compliance Inspections
Lawrence Mandarino
01/08/2026
Special inspection requirement — Final
Lawrence Mandarino
01/08/2026
Special inspection requirement — Air barrier - visual inspection
Lawrence Mandarino
01/08/2026
Special inspection requirement — Lighting in dwelling units
Lawrence Mandarino
01/08/2026
Special inspection requirement — Permanent certificate
Lawrence Mandarino
01/08/2026
Special inspection requirement — Electric vehicle service equipment requirements
Lawrence Mandarino
01/08/2026
Special inspection requirement — Metering
Lawrence Mandarino
01/08/2026
Special inspection requirement — Insulation placement and R values
Lawrence Mandarino
01/08/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Lawrence Mandarino
01/08/2026
Special inspection requirement — Fenestration air leakage
Lawrence Mandarino
01/08/2026
Special inspection requirement — Fenestration areas
Lawrence Mandarino
01/08/2026
Special inspection requirement — Air barrier — testing
Lawrence Mandarino
01/08/2026
Special inspection requirement — Maintenance information
Lawrence Mandarino
01/02/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
proposed 10.0' concrete curb cut, including 2-18" concrete splays located on the North Side of David St.
S01201126-P1
12/15/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
proposed 10.0' concrete curb cut, including 2-18" concrete splays located on the North Side of David St.
S01201126-S1
11/25/2025
Signed off — Alteration
INSTALLATION OF FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME
S01235519-I1
11/24/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
proposed 10.0' concrete curb cut, including 2-18" concrete splays located on the North Side of David St.
S01201126-S2
11/19/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/19/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/06/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
11/06/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/05/2025
Permit issued — Curb Cut
S01201126-S2-CC
11/03/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
proposed 10.0' concrete curb cut, including 2-18" concrete splays located on the North Side of David St.
S01201126-S2
11/03/2025
Signed off — Alteration
Construction of an 8.0' plywood, wood frame construction located inside the property line.
S01179124-I1
10/30/2025
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
10/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/27/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/27/2025
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
08/26/2025
Permit issued — Plumbing
S01235519-I1-PL
08/15/2025
Filed — Alteration
INSTALLATION OF FIRE SPRINKLER SYSTEM WITH VALVES AND METERS FOR SAME
S01235519-I1
07/23/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
07/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/18/2025
Permit issued — Plumbing
S01201126-S1-PL
07/01/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
proposed 10.0' concrete curb cut, including 2-18" concrete splays located on the North Side of David St.
S01201126-S1
07/01/2025
Permit issued — General Construction
S01201126-I1-FO
07/01/2025
Permit issued — Structural
S01201126-I1-ST
07/01/2025
Permit issued — Foundation
S01201126-I1-GC
06/30/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
06/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Lawrence Mandarino
06/30/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Lawrence Mandarino
06/30/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
anthony santoro
06/30/2025
Special inspection requirement — Energy Code Compliance Inspections
Lawrence Mandarino
06/30/2025
Special inspection requirement — HVAC-R and service water heating equipment
Lawrence Mandarino
06/30/2025
Special inspection requirement — HVAC-R and service water heating system controls
Lawrence Mandarino
06/30/2025
Special inspection requirement — Maintenance information
Lawrence Mandarino
06/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Lawrence Mandarino
06/26/2025
Objection resolved — Addressed
06/23/2025
Objection raised — Scope
06/10/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
proposed 10.0' concrete curb cut, including 2-18" concrete splays located on the North Side of David St.
S01201126-I1
02/25/2025
Permit issued — Construction Fence
S01179124-I1-FN
02/19/2025
Filed — Alteration
Construction of an 8.0' plywood, wood frame construction located inside the property line.
S01179124-I1
Latest 60 of 61 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FONTANA AND SONS LLC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LAWRENCE MANDARINO ARCHITECT501/02/2026
A TECH ENGINEERING NYC, PLLC.108/15/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A TECH ENGINEERING NYC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A. FONTANA & SONS LLCGeneral Contractor707/08/2026
SUPERIOR PLUMBING & HEATINGPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LAWRENCE MANDARINO ARCHIT724301/02/2026
A TECH ENGINEERING NYC, P6738107/01/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offA. FONTANA & SONS LLC11/05/2025
DOB NOWPlumbingSigned-offSUPERIOR PLUMBING & HEATI08/26/2025
DOB NOWPlumbingSigned-offSUPERIOR PLUMBING & HEATI07/18/2025
DOB NOWGeneral ConstructionSigned-offA. FONTANA & SONS LLC07/01/2025
DOB NOWStructuralSigned-offA. FONTANA & SONS LLC07/01/2025
DOB NOWFoundationPermit IssuedA. FONTANA & SONS LLC07/01/2025
DOB NOWConstruction FenceSigned-offA. FONTANA & SONS LLC02/25/2025
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
11/19/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/19/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
11/06/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
11/06/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/30/2025Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
10/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/27/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/27/2025Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
07/23/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/23/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
01/08/2026Construction Utilizing CLT or SCL, Type IVLawrence Mandarinospecial
01/08/2026Structural Stability – Alterations of existing buildingsLawrence Mandarinospecial
01/08/2026Concrete - Cast-In-PlaceLawrence Mandarinospecial
01/08/2026Subgrade InspectionsLawrence Mandarinospecial
01/08/2026Fire-Resistant Penetrations and JointsLawrence Mandarinospecial
01/08/2026Wood – Prefabricated I-JoistsLawrence Mandarinospecial
01/08/2026Footing and FoundationLawrence Mandarinoprogress
01/08/2026Structural Wood FrameLawrence Mandarinoprogress
01/08/2026Energy Code Compliance InspectionsLawrence Mandarinoprogress
01/08/2026FinalLawrence Mandarinoprogress
01/08/2026Air barrier - visual inspectionLawrence Mandarinoenergy_progress
01/08/2026Lighting in dwelling unitsLawrence Mandarinoenergy_progress
01/08/2026Permanent certificateLawrence Mandarinoenergy_progress
01/08/2026Electric vehicle service equipment requirementsLawrence Mandarinoenergy_progress
01/08/2026MeteringLawrence Mandarinoenergy_progress
01/08/2026Insulation placement and R valuesLawrence Mandarinoenergy_progress
01/08/2026Fenestration and door U-factor and product ratingsLawrence Mandarinoenergy_progress
01/08/2026Fenestration air leakageLawrence Mandarinoenergy_progress
01/08/2026Fenestration areasLawrence Mandarinoenergy_progress
01/08/2026Air barrier — testing Lawrence Mandarinoenergy_progress
01/08/2026Maintenance informationLawrence Mandarinoenergy_progress
06/30/2025Subsurface Investigations (Borings/Test Pits)anthony santorospecial
06/30/2025Fire-Resistant Penetrations and JointsLawrence Mandarinospecial
06/30/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationLawrence Mandarinospecial
06/30/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilitiesanthony santorospecial
Latest 25 of 31.
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/20/2026S01179124-I1Request digital key ↗
08/18/2026S01235519-I1Request digital key ↗
08/17/2026S01201126-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
03/13/2025540266433Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
03/27/2025540266433Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S01201126-P1Open ↗
08/13/2026S01201126-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026S01201126-P1Open ↗
08/13/2026S01201126-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S01201126-I1Open ↗
08/13/2026S01201126-P1Open ↗
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/20/2026S01179124-I1Open ↗
08/17/2026S01201126-I1Open ↗
08/17/2026S01201126-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/31/2026S01201126-S1Open ↗
08/31/2026S01201126-S1Open ↗
08/28/2026S01201126-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026S01201126-S1Open ↗
08/31/2026S01201126-S1Open ↗
08/31/2026S01201126-S1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/13/2025540266433Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
03/13/2025540266433Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S01201126-I1Open ↗
08/13/2026S01201126-P1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/17/2026S01201126-P1Open ↗
08/17/2026S01201126-S2Open ↗
08/17/2026S01201126-S1Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports5
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
03/27/2025540266433Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/13/2025540266433Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026S01201126-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S01201126-S1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S01201126-S1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
03/27/2025540266433Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
03/13/2025540266433Open ↗
▸Other Documents10
▸BISBPP - SUPPORTING DOCUMENTATION2
03/27/2025540266433Open ↗
03/27/2025540266433Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026S01201126-I1Open ↗
08/13/2026S01201126-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S01201126-P1Open ↗
08/13/2026S01201126-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/17/2026S01201126-I1Open ↗
08/17/2026S01201126-P1Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
03/27/2025540266433Open ↗
▸DOB NOWFinal Survey1
08/13/2026S01201126-I1Open ↗