← Back
One story retail building
4076 HYLAN BOULEVARD
STATEN ISLAND · BIN 5068204
💬 Discuss this project
1969Year Built
1Stories
K1Building Class
R3-1Zoning
3,212 sfGross Floor Area
4Units
0 Open ViolationsFDNY Report ↗
One story retail building · 7,688 sf lot · 0.42 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Floor 11p · 2 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
4076 HYLAN BLVD REALTY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DESIGN BUILD SI, INC.201/02/2025
ADG ARCHITECTURE AND DESIGN PC311/16/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DESIGN BUILD, SI, INC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KCM PLMBG & HTNG CORPGeneral Contractor407/08/2026
DK CONSTRUCTION ONE, CORPGeneral Contractor107/08/2026
JPI PLUMBING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DESIGN BUILD, SI, INC6114201/02/2025
Building Lifecycle
All (37)Filed (5)Permit Issued (4)Signed Off (4)Violation (3)Inspection (3)Special Inspection (18)
06/20/2025
Violation issued (FDNY_NOV, closed)
03/19/2025
Signed off — Alteration
PLANS AND DOCUMENTS FILED HEREWITH FOR THE INSTALLATION OF TWO HEAT PUMP UNITS; FRIEDRICH UNIT MODEL FSHSR24A3A & FUJITSU UNIT MODEL AOU36RLXB. NO CHANGE TO BULK, USE, EGRESS, OR OCCUPANCY.
S01159725-I1
03/17/2025
Permit issued — Mechanical Systems
S01159725-I1-MS
01/02/2025
Filed — Alteration
PLANS AND DOCUMENTS FILED HEREWITH FOR THE INSTALLATION OF TWO HEAT PUMP UNITS; FRIEDRICH UNIT MODEL FSHSR24A3A & FUJITSU UNIT MODEL AOU36RLXB. NO CHANGE TO BULK, USE, EGRESS, OR OCCUPANCY.
S01159725-I1
12/26/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Giuseppe Bonomo
12/26/2024
Special inspection requirement — Heating Systems
Giuseppe Bonomo
12/26/2024
Special inspection requirement — Maintenance information
Giuseppe Bonomo
12/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
Giuseppe Bonomo
12/26/2024
Special inspection requirement — Energy Code Compliance Inspections
Giuseppe Bonomo
12/26/2024
Special inspection requirement — HVAC-R and service water heating equipment
Giuseppe Bonomo
12/23/2024
Special inspection requirement — Mechanical Systems
Giuseppe Bonomo
12/23/2024
Special inspection requirement — Final
Giuseppe Bonomo
04/17/2024
Signed off — Alteration
S01011286-I1
04/05/2024
Permit issued — Mechanical Systems
S01011286-I1-MS
03/05/2024
Filed — Alteration
S01011286-I1
03/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Giuseppe Bonomo
03/04/2024
Special inspection requirement — Maintenance information
Giuseppe Bonomo
03/04/2024
Special inspection requirement — HVAC-R and service water heating system controls
Giuseppe Bonomo
03/04/2024
Special inspection requirement — HVAC-R and service water heating equipment
Giuseppe Bonomo
03/04/2024
Special inspection requirement — Heating Systems
Giuseppe Bonomo
03/04/2024
Special inspection requirement — Energy Code Compliance Inspections
Giuseppe Bonomo
02/27/2024
Special inspection requirement — Mechanical Systems
Giuseppe Bonomo
02/27/2024
Special inspection requirement — Final
Giuseppe Bonomo
03/11/2022
Signed off — Alteration
INTERIOR RENOVATION OF RETAIL SPACE AS INDICATED ON PLANS. NO CHANGE IN USE, OCCUPANCY OF EGRESS.
S00608694-I1
03/11/2022
Signed off — Alteration
S00622607-I1
12/14/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/30/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/19/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/16/2021
Filed — Alteration
S00622607-I1
11/16/2021
Permit issued — Plumbing
S00622607-I1-PL
11/12/2021
Permit issued — General Construction
S00608694-I1-GC
11/09/2021
Filed — Alteration
INTERIOR RENOVATION OF RETAIL SPACE AS INDICATED ON PLANS. NO CHANGE IN USE, OCCUPANCY OF EGRESS.
S00608694-P1
11/09/2021
Special inspection requirement — Final
Christopher Carrano
11/01/2021
Special inspection requirement — Final
10/28/2021
Filed — Alteration
INTERIOR RENOVATION OF RETAIL SPACE AS INDICATED ON PLANS. NO CHANGE IN USE, OCCUPANCY OF EGRESS.
S00608694-I1
08/02/2021
Violation issued (FDNY_NOV, closed)
04/28/1995
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offKCM PLMBG & HTNG CORP03/17/2025
DOB NOWMechanical SystemsSigned-offKCM PLMBG & HTNG CORP04/05/2024
DOB NOWPlumbingSigned-offJPI PLUMBING & HEATING IN11/16/2021
DOB NOWGeneral ConstructionSigned-offDK CONSTRUCTION ONE, CORP11/12/2021
BISMHISSUEDAL-RICH BUILDERS LLC08/15/2016
BISMHISSUEDSCARAN PLBG11/30/2000
BISPLISSUEDSCARAN PLUMBING INC11/17/2000
BISFPISSUEDMASTER FIRE PREVENTION SYSTEM02/08/1996
BISOTISSUEDALL RIGHT PLBG LIMITED12/15/1995
BISPLISSUEDALL RIGHT PLBG LIMITED12/14/1995
BISPLISSUEDALL RITE PLBG LTD.07/13/1995
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/14/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/30/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/19/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
12/26/2024HVAC-R and service water piping design and insulationGiuseppe Bonomoenergy_progress
12/26/2024Heating SystemsGiuseppe Bonomospecial
12/26/2024Maintenance informationGiuseppe Bonomoenergy_progress
12/26/2024HVAC-R and service water heating system controlsGiuseppe Bonomoenergy_progress
12/26/2024Energy Code Compliance InspectionsGiuseppe Bonomoprogress
12/26/2024HVAC-R and service water heating equipmentGiuseppe Bonomoenergy_progress
12/23/2024Mechanical SystemsGiuseppe Bonomospecial
12/23/2024FinalGiuseppe Bonomoprogress
03/04/2024HVAC-R and service water piping design and insulationGiuseppe Bonomoenergy_progress
03/04/2024Maintenance informationGiuseppe Bonomoenergy_progress
03/04/2024HVAC-R and service water heating system controlsGiuseppe Bonomoenergy_progress
03/04/2024HVAC-R and service water heating equipmentGiuseppe Bonomoenergy_progress
03/04/2024Heating SystemsGiuseppe Bonomospecial
03/04/2024Energy Code Compliance InspectionsGiuseppe Bonomoprogress
02/27/2024Mechanical SystemsGiuseppe Bonomospecial
02/27/2024FinalGiuseppe Bonomoprogress
11/09/2021FinalChristopher Carranoprogress
11/01/2021Final—progress
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026S00608694-P1Request digital key ↗
08/25/2026S00608694-I1Request digital key ↗
08/25/2026S00622607-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
08/05/2016520299025Open ↗
▸BISWORK PERMIT APPLICATION1
08/16/2016520299025Open ↗
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026S00608694-I1Open ↗
08/22/2026S01011286-I1Open ↗
08/22/2026S01011286-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026S00608694-I1Open ↗
08/25/2026S00622607-I1Open ↗
08/21/2026S01011286-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/22/2026S01011286-I1Open ↗
08/22/2026S01159725-I1Open ↗
08/22/2026S01159725-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
08/25/2016520299025Open ↗
08/05/2016520299025Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/05/2016520299025Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/05/2016520299025Open ↗
▸Trade Schedules & Equipment3
▸BISEQUIPMENT USE APPLICATION/PERMIT2
08/25/2016520299025Open ↗
08/05/2016520299025Open ↗
▸BISEQUIPMENT USE PERMITS1
08/25/2016520299025Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/25/2026S00608694-I1Open ↗
08/25/2026S00622607-I1Open ↗
08/21/2026S01011286-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/25/2016520299025Open ↗
08/05/2016520299025Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/25/2016520299025Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
08/05/2016520299025Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/25/2016520299025Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
08/25/2016520299025Open ↗
08/05/2016520299025Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
08/05/2016520299025Open ↗