← Back
Miscellaneous hospital / health care facility
4236 HYLAN BOULEVARD
STATEN ISLAND · BIN 5068463
💬 Discuss this project
1980Year Built
1Stories
I9Building Class
R3-1Zoning
3,500 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Miscellaneous hospital / health care facility · Owner of record: 4236 HYLAN BLVD., LLC · 12,142 sf lot · 0.29 FAR built · Flood zone X500
Locations of Work
Architecture
Roof1p · 1 filing · 14 docs
1 job · most recent 06/12/2022
General Wiring
FiledStatusContractorScope
06/12/2022CompleteAE ELECTRIC INCGeneral Wiring
Building Lifecycle
All (49)Filed (5)Permit Issued (5)Signed Off (3)Violation (3)Inspection (5)Objection (2)Special Inspection (26)
01/17/2023
Signed off — Alteration
S00500512-I1
01/04/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/03/2023
Signed off — Alteration
AMENDMENT FILED TO REVISE GAS METER LOCATION AND RISER TO OSP
S00529000-I1
12/13/2022
Permit issued — General Construction
S00500512-I1-GC
11/30/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anselmo Genovese
11/30/2022
Special inspection requirement — Energy Code Compliance Inspections
Anselmo Genovese
11/30/2022
Special inspection requirement — Maintenance information
Anselmo Genovese
11/30/2022
Special inspection requirement — HVAC-R and service water heating system controls
Anselmo Genovese
11/30/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Anselmo Genovese
11/30/2022
Special inspection requirement — HVAC-R and service water heating equipment
Anselmo Genovese
11/21/2022
Filed — Alteration
AMENDMENT FILED TO REVISE GAS METER LOCATION AND RISER TO OSP
S00529000-P1
11/18/2022
Signed off — Alteration
INSTALLATION OF 4 HVAC UNITS AT SIDE OF BUILDING,INSTALLATION OF 3 GAS FURNACES AT MECHANICAL ROOM.FILING TO OBTAIN Certificate of Compliance (Equipment Use Permit)APPLICATION ALT 1 FILED UNDER #520461660PLUMBING WORK TYPE TO BE FILED AS SUBSEQUENT FILING
S00500540-I1
11/02/2022
Special inspection requirement — Duct leakage testing, insulation and design
Ralph Giorgio
11/02/2022
Special inspection requirement — Heating Systems
Ralph Giorgio
11/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ralph Giorgio
11/02/2022
Special inspection requirement — Mechanical Systems
Ralph Giorgio
11/02/2022
Special inspection requirement — Energy Code Compliance Inspections
Ralph Giorgio
11/02/2022
Special inspection requirement — Final
Ralph Giorgio
11/02/2022
Special inspection requirement — Maintenance information
Ralph Giorgio
10/25/2022
Filed — Alteration
INSTALLATION OF 4 HVAC UNITS AT SIDE OF BUILDING,INSTALLATION OF 3 GAS FURNACES AT MECHANICAL ROOM.FILING TO OBTAIN Certificate of Compliance (Equipment Use Permit)APPLICATION ALT 1 FILED UNDER #520461660PLUMBING WORK TYPE TO BE FILED AS SUBSEQUENT FILING
S00500540-P1
10/25/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/03/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/03/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/10/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/28/2022
Permit issued — Plumbing
S00529000-I1-PL
03/18/2022
Permit issued — General Construction
S00500512-I1-GC
11/01/2021
Permit issued — Mechanical Systems
S00500540-I1-MS
10/28/2021
Permit issued — General Construction
S00500512-I1-GC
06/03/2021
Objection raised — Scope
06/03/2021
Objection resolved — Addressed
05/27/2021
Filed — Alteration
AMENDMENT FILED TO REVISE GAS METER LOCATION AND RISER TO OSP
S00529000-I1
04/26/2021
Filed — Alteration
S00500512-I1
04/15/2021
Filed — Alteration
INSTALLATION OF 4 HVAC UNITS AT SIDE OF BUILDING,INSTALLATION OF 3 GAS FURNACES AT MECHANICAL ROOM.FILING TO OBTAIN Certificate of Compliance (Equipment Use Permit)APPLICATION ALT 1 FILED UNDER #520461660PLUMBING WORK TYPE TO BE FILED AS SUBSEQUENT FILING
S00500540-I1
04/08/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
Anselmo Genovese
04/08/2021
Special inspection requirement — Fenestration air leakage
Anselmo Genovese
04/08/2021
Special inspection requirement — Interior lighting power
Anselmo Genovese
04/08/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Anselmo Genovese
04/08/2021
Special inspection requirement — Maintenance information
Anselmo Genovese
04/08/2021
Special inspection requirement — Lighting controls
Anselmo Genovese
04/08/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anselmo Genovese
04/08/2021
Special inspection requirement — Concrete - Cast-In-Place
Anselmo Genovese
04/08/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anselmo Genovese
04/08/2021
Special inspection requirement — Subgrade Inspections
Anselmo Genovese
04/08/2021
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
04/08/2021
Special inspection requirement — Insulation placement and R values
Anselmo Genovese
04/08/2021
Special inspection requirement — Exterior lighting power
Anselmo Genovese
03/25/2011
Violation issued (FDNY_NOV, closed)
02/10/2000
Violation issued (ECB, closed)
Construction
03/16/1998
Violation issued (ECB, closed)
Construction
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
387 14TH ST REALTY1807/08/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KAS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GEMSTAR CONSTRUCTION CORP.General Contractor407/08/2026
SCARAN OIL SERVICE INCGeneral Contractor203/21/2026
MPC PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ANSELMO S. GENOVESE ARCHI2377311/21/2022
RELIANCE ENGINEERING, P.C322210/25/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offGEMSTAR CONSTRUCTION CORP.12/13/2022
DOB NOWPlumbingSigned-offMPC PLUMBING & HEATING IN04/28/2022
DOB NOWGeneral ConstructionSigned-offGEMSTAR CONSTRUCTION CORP.03/18/2022
DOB NOWMechanical SystemsSigned-offSCARAN OIL SERVICE INC11/01/2021
DOB NOWGeneral ConstructionSigned-offGEMSTAR CONSTRUCTION CORP.10/28/2021
BIS—ISSUEDHOMEOWNER12/12/2022
BIS—ISSUEDN/A08/10/2001
BISOTISSUEDTRU-ART SIGN CO.INC09/06/2000
BIS—ISSUEDTRU-ART SIGN CO INC09/06/2000
BIS—ISSUEDTRU-ART SIGN CO INC09/06/2000
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/04/2023Pass-Final General Construction Non-Directive 14PassView ↗
10/25/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/03/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/03/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/10/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
11/30/2022Fire-Resistant Penetrations and JointsAnselmo Genovesespecial
11/30/2022Energy Code Compliance InspectionsAnselmo Genoveseprogress
11/30/2022Maintenance informationAnselmo Genoveseenergy_progress
11/30/2022HVAC-R and service water heating system controlsAnselmo Genoveseenergy_progress
11/30/2022HVAC-R and service water piping design and insulationAnselmo Genoveseenergy_progress
11/30/2022HVAC-R and service water heating equipmentAnselmo Genoveseenergy_progress
11/02/2022Duct leakage testing, insulation and designRalph Giorgioenergy_progress
11/02/2022Heating SystemsRalph Giorgiospecial
11/02/2022Fire-Resistant Penetrations and JointsRalph Giorgiospecial
11/02/2022Mechanical SystemsRalph Giorgiospecial
11/02/2022Energy Code Compliance InspectionsRalph Giorgioprogress
11/02/2022FinalRalph Giorgioprogress
11/02/2022Maintenance informationRalph Giorgioenergy_progress
04/08/2021Fenestration and door U-factor and product ratingsAnselmo Genoveseenergy_progress
04/08/2021Fenestration air leakageAnselmo Genoveseenergy_progress
04/08/2021Interior lighting powerAnselmo Genoveseenergy_progress
04/08/2021HVAC-R and service water piping design and insulationAnselmo Genoveseenergy_progress
04/08/2021Maintenance informationAnselmo Genoveseenergy_progress
04/08/2021Lighting controlsAnselmo Genoveseenergy_progress
04/08/2021Structural Stability – Alterations of existing buildingsAnselmo Genovesespecial
04/08/2021Concrete - Cast-In-PlaceAnselmo Genovesespecial
04/08/2021Fire-Resistant Penetrations and JointsAnselmo Genovesespecial
04/08/2021Subgrade InspectionsAnselmo Genovesespecial
04/08/2021Subsurface Investigations (Borings/Test Pits)anthony santorospecial
04/08/2021Insulation placement and R valuesAnselmo Genoveseenergy_progress
Latest 25 of 26.
▾Documents — 73 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026S00500540-P1Request digital key ↗
08/25/2026S00500540-I1Request digital key ↗
08/25/2026S00500512-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION2
12/12/2022520461660Open ↗
09/28/2021520461660Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
02/26/2021520461660Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
12/13/2022520461660Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
09/28/2021520461660Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
12/20/2022520461660Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
12/20/2022520461660Open ↗
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature13
08/26/2026S00500540-I1Open ↗
08/26/2026S00500540-I1Open ↗
08/26/2026S00500540-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
08/26/2026S00500540-I1Open ↗
08/26/2026S00500540-I1Open ↗
08/26/2026S00500540-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026S00500540-I1Open ↗
08/25/2026S00500540-P1Open ↗
08/23/2026S00529000-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
01/03/2023520461660Open ↗
01/03/2023520461660Open ↗
▸Trade Schedules & Equipment2
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
01/30/2023520461660Open ↗
▸BISHEATING SYSTEMS1
12/21/2022520461660Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/25/2026S00500540-I1Open ↗
08/25/2026S00500540-P1Open ↗
08/14/2026S00529000-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026S00529000-I1Open ↗
08/13/2026S00500512-I1Open ↗
08/13/2026S00500540-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/21/2022520461660Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/30/2023520461660Open ↗
05/03/2022520461660Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
12/28/2022520461660Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
01/03/2023520461660Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
05/10/2022520461660Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
12/28/2022520461660Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
12/21/2022520461660Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
12/28/2022520461660Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/21/2022520461660Open ↗
▸BISMECHANICAL SYSTEMS1
12/28/2022520461660Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00500512-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00500512-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S00500512-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISSCHEDULE A - OCCUPANCY / USE1
01/31/2023520461660Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT (FINAL): PW31
12/21/2022520461660Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
02/06/2023520461660Open ↗
12/02/2022520461660Open ↗
▸BISBOROUGH INTAKE FORM1
02/26/2021520461660Open ↗
▸BISEFILING COVER SHEET1
02/26/2021520461660Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
03/11/2021520461660Open ↗
▸BISPLOT DIAGRAM1
09/21/2021520461660Open ↗