← Back
One story - permanent living quarter
89 SYLVIA STREET
STATEN ISLAND · BIN 5074006
💬 Discuss this project
1955Year Built
1Stories
A2Building Class
R3AZoning
—Gross Floor Area
1Units
One story - permanent living quarter · 0.25 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC108/03/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor108/06/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272108/03/2026
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
08/05/2026
Permit issued — Solar
S01439460-I1-SL
08/03/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S01439460-I1
08/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/03/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
07/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
07/31/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
07/31/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC08/05/2026
BIS—ISSUEDN/A03/08/1999
1 project · most recent 08/03/2026
General Wiring
FiledStatusContractorScope
08/03/2026CompleteSUNRUN SOLAR ELECTL CORPGeneral Wiring
1 project · most recent 08/03/2026
FiledStatusContractorScope
08/03/2026Signed-offSUNRUN INSTALLATION SVC42 panels, 18.9 kw, 441.48 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/03/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/03/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
07/31/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
07/31/2026Energy Code Compliance InspectionsWalid Abdullaprogress
07/31/2026FinalWalid Abdullaprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026S01439460-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026S01439460-I1Open ↗
09/01/2026S01439460-I1Open ↗
09/01/2026S01439460-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026S01439460-I1Open ↗
09/01/2026S01439460-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026S01439460-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026S01439460-I1Open ↗