← Back
One story - permanent living quarter
136 END PLACE
STATEN ISLAND · BIN 5077015
💬 Discuss this project
1974Year Built
1Stories
A2Building Class
R3-1Zoning
1,212 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story - permanent living quarter · 4,950 sf lot · 0.24 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC104/21/2025
TERRA PRETA ARCHITECTS101/07/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DESIGN CONCEPTS103/21/2026
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
BONAFIDE REALTY, LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272104/21/2025
Building Lifecycle
All (14)Filed (2)Permit Issued (2)Signed Off (2)Violation (2)Special Inspection (6)
08/06/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01211824-I1
04/29/2025
Permit issued — Solar
S01211824-I1-SL
04/21/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01211824-I1
04/16/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
04/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
04/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
04/16/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
04/16/2025
Special inspection requirement — Final
Walid Abdulla
10/20/2022
Signed off — Alteration
S00658205-I1
09/23/2022
Permit issued — General Construction
S00658205-I1-GC
01/07/2022
Filed — Alteration
S00658205-I1
01/06/2022
Special inspection requirement — Final
George Turner
06/26/2019
Violation issued (ECB, closed)
Construction
10/10/2017
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC04/29/2025
DOB NOWGeneral ConstructionSigned-offBONAFIDE REALTY, LLC09/23/2022
BISOTISSUEDSUNRUN INSTALLATION SVC01/10/2023
2 projects · most recent 04/21/2025
FiledStatusContractorScope
04/21/2025CompleteSUNRUN SOLAR ELECTL CORP—
01/10/2023CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
04/16/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
04/16/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
04/16/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
04/16/2025Energy Code Compliance InspectionsWalid Abdullaprogress
04/16/2025FinalWalid Abdullaprogress
01/06/2022FinalGeorge Turnerprogress
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/24/2026S00658205-I1Request digital key ↗
08/19/2026S01211824-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
02/23/2023540243967Open ↗
02/22/2023540243967Open ↗
01/09/2023540243967Open ↗
▸BISWORK PERMIT APPLICATION1
01/10/2023540243967Open ↗
▸Seals & Professional Certifications11
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026S01211824-I1Open ↗
09/01/2026S01211824-I1Open ↗
09/01/2026S01211824-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026S01211824-I1Open ↗
08/13/2026S00658205-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026S01211824-I1Open ↗
09/01/2026S01211824-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/09/2023540243967Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/09/2023540243967Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/09/2023540243967Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
01/10/2023540243967Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/09/2023540243967Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S01211824-I1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/14/2023540243967Open ↗
01/09/2023540243967Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/14/2023540243967Open ↗
▸BISNYCECC ANALYSIS1
01/09/2023540243967Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
01/09/2023540243967Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
03/14/2023540243967Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/09/2023540243967Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/14/2023540243967Open ↗
01/09/2023540243967Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION3
03/15/2023540243967Open ↗
03/15/2023540243967Open ↗
01/09/2023540243967Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/15/2023540243967Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01211824-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
01/09/2023540243967Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/14/2023540243967Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
02/23/2023540243967Open ↗
01/09/2023540243967Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/09/2023540243967Open ↗