← Back
Two stories - detached, small or mid-size
380 IONIA AVENUE
STATEN ISLAND · BIN 5080916
💬 Discuss this project
1966Year Built
2Stories
A1Building Class
R3XZoning
2,360 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 6,000 sf lot · 0.39 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 05/06/2025
FiledStatusContractorScope
05/06/2025CompleteJSP ELECTL CNTNG CORP—
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
10/30/2025
Signed off — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01227965-I1
05/29/2025
Permit issued — Solar
S01227965-I1-SL
05/24/2025
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01227965-I1
05/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
05/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
05/19/2025
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
05/19/2025
Special inspection requirement — Final
VYACHESLAV NECHAYEV
05/19/2025
Special inspection requirement — Air barrier - visual inspection
VYACHESLAV NECHAYEV
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ETRECTE LLC105/24/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J B I CONSTRUCTION GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J.B.I. CONSTRUCTION GROUPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETRECTE LLC8116105/24/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offJ.B.I. CONSTRUCTION GROUP05/29/2025
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/19/2025Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
05/19/2025Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
05/19/2025Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
05/19/2025FinalVYACHESLAV NECHAYEVprogress
05/19/2025Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026S01227965-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026S01227965-I1Open ↗
08/27/2026S01227965-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01227965-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026S01227965-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S01227965-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01227965-I1Open ↗