← Back
Two stories - detached, small or mid-size
5870 AMBOY ROAD
STATEN ISLAND · BIN 5083026
💬 Discuss this project
1935Year Built
2Stories
A1Building Class
R3XZoning
1,197 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 10,140 sf lot · 0.12 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 08/14/2026
FiledStatusContractorScope
08/14/2026CompleteSUNRUN SOLAR ELECTL CORP—
1 job · most recent 08/14/2026
FiledStatusContractorScope
08/14/2026Signed-offSUNRUN INSTALLATION SVC24 panels, 10.8 kw, 252 roof_area_sqft
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
08/21/2026
Permit issued — Solar
S01443721-I1-SL
08/14/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01443721-I1
08/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/14/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
08/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
08/10/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
08/10/2026
Special inspection requirement — Final
Walid Abdulla
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC108/14/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor108/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272108/14/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC08/21/2026
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/14/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/14/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
08/10/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/10/2026Energy Code Compliance InspectionsWalid Abdullaprogress
08/10/2026FinalWalid Abdullaprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026S01443721-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026S01443721-I1Open ↗
09/01/2026S01443721-I1Open ↗
09/01/2026S01443721-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026S01443721-I1Open ↗
09/01/2026S01443721-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026S01443721-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026S01443721-I1Open ↗