← Back
Cape Cod
463 VERNON AVENUE
STATEN ISLAND · BIN 5083957
💬 Discuss this project
1945Year Built
1.5Stories
A0Building Class
R3XZoning
1,015 sfGross Floor Area
1Units
Cape Cod · 12,000 sf lot · 0.08 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 2 filings · 20 docs
Floor 2Under Construction12p · 2 filings · 20 docs
Floor 1Under Construction12p · 2 filings · 20 docs
CellarUnder Construction12p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEVEN R. SAVINO ARCHITECT PC608/17/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NICOLOSI BROS INCGeneral Contractor407/08/2026
CARMINE'S MECHANICAL INCPlumbing107/01/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STEVEN R. SAVINO ARCHIT1216208/17/2026
A TECH ENGINEERING NYC, P6738205/18/2026
Building Lifecycle
All (76)Filed (6)Permit Issued (5)Inspection (2)Objection (33)Special Inspection (30)
08/17/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
CONSTRUCTION OF A HORIZONTAL 2- STORY ADDITION AND VERTICAL ADDITION OF ATTIC AND ROOF. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01272202-S1
08/11/2026
Special inspection requirement — Ventilation and air distribution system
Steven Savino
08/11/2026
Special inspection requirement — Final
Steven Savino
08/11/2026
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
08/11/2026
Special inspection requirement — Mechanical Systems
Steven Savino
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Savino
08/11/2026
Special inspection requirement — Maintenance information
Steven Savino
08/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
08/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
08/11/2026
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
06/09/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/04/2026
Permit issued — Plumbing
S01182807-I1-PL
05/18/2026
Filed — Alteration
INSTALLATION OF ALL SANITARY FIXTURES WITH ASSOCIATED PIPING, GAS GENERATOR WITH ASSOCIATED PIPING AND INSTALLATION OF STORM WATER DETENTION SYSTEM.
S01182807-I1
05/18/2026
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
05/18/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
anthony santoro
05/18/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
05/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
05/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
05/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
04/28/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/20/2026
Permit issued — Foundation
S01272202-I1-FO
04/20/2026
Permit issued — General Construction
S01272202-I1-ST
04/17/2026
Permit issued — General Construction
S01272202-I1-GC
04/03/2026
Permit issued — Construction Fence
S01067174-I1-FN
03/27/2026
Filed — Alteration
CONSTRUCTION OF A CHAIN LINK CONSTRUCTION FENCE
S01067174-I1
12/15/2025
Objection resolved — Addressed
12/15/2025
Objection resolved — Addressed
12/10/2025
Objection resolved — Addressed
12/01/2025
Objection resolved — Addressed
11/19/2025
Objection resolved — Addressed
11/19/2025
Objection resolved — Addressed
11/19/2025
Objection resolved — Addressed
11/19/2025
Special inspection requirement — Electric vehicle service equipment requirements
Steven Savino
11/19/2025
Special inspection requirement — Metering
Steven Savino
11/19/2025
Special inspection requirement — Interior lighting power
Steven Savino
11/12/2025
Objection raised — Zoning
10/17/2025
Objection resolved — Addressed
10/16/2025
Objection resolved — Addressed
10/16/2025
Objection resolved — Addressed
10/16/2025
Objection resolved — Addressed
10/16/2025
Special inspection requirement — Lighting in dwelling units
Steven Savino
10/16/2025
Special inspection requirement — Structural Wood Frame
Steven Savino
09/30/2025
Objection resolved — Addressed
09/30/2025
Objection resolved — Addressed
09/30/2025
Objection resolved — Addressed
09/30/2025
Objection resolved — Addressed
09/30/2025
Objection resolved — Addressed
09/30/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
09/29/2025
Objection raised — Admin
09/29/2025
Objection raised — Energy
09/29/2025
Objection raised — Fire_Protection
09/29/2025
Objection raised — Scope
09/29/2025
Objection raised — Zoning
09/29/2025
Objection raised — Zoning
09/29/2025
Objection raised — Zoning
09/29/2025
Objection raised — Energy
09/29/2025
Objection raised — Scope
09/29/2025
Objection raised — Zoning
09/29/2025
Objection raised — Plumbing
09/29/2025
Objection raised — Inspections
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCARMINE'S MECHANICAL INC06/04/2026
DOB NOWFoundationPermit IssuedNICOLOSI BROS INC04/20/2026
DOB NOWGeneral ConstructionPermit IssuedNICOLOSI BROS INC04/20/2026
DOB NOWGeneral ConstructionPermit IssuedNICOLOSI BROS INC04/17/2026
DOB NOWConstruction FencePermit IssuedNICOLOSI BROS INC04/03/2026
1 project · most recent 08/17/2026
Air Conditioning Systems Generators
FiledStatusContractorScope
08/17/2026Permit IssuedNICOLOSI BROS INCAir Conditioning Systems, Generators
2 projects · most recent 05/18/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/18/2026Permit IssuedCARMINE'S MECHANICAL INCGas, Storm, Water/Sanitary
12/29/2023——Gas
1 project · most recent 08/17/2026
Steel Concrete Wood
FiledStatusContractorScope
08/17/2026Permit IssuedNICOLOSI BROS INCSteel, Concrete, Wood
1 project · most recent 03/27/2026
Fence
FiledStatusContractorScope
03/27/2026Permit IssuedNICOLOSI BROS INCFence
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/09/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/28/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
08/11/2026Ventilation and air distribution systemSteven Savinoenergy_progress
08/11/2026FinalSteven Savinoprogress
08/11/2026Energy Code Compliance InspectionsSteven Savinoprogress
08/11/2026Mechanical SystemsSteven Savinospecial
08/11/2026Fire-Resistant Penetrations and JointsSteven Savinospecial
08/11/2026Maintenance informationSteven Savinoenergy_progress
08/11/2026HVAC-R and service water heating equipmentSteven Savinoenergy_progress
08/11/2026HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
08/11/2026HVAC-R and service water heating system controlsSteven Savinoenergy_progress
05/18/2026Energy Code Compliance InspectionsSteven Savinoprogress
05/18/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilitiesanthony santorospecial
05/18/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
05/18/2026HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
05/18/2026HVAC-R and service water heating system controlsSteven Savinoenergy_progress
05/18/2026HVAC-R and service water heating equipmentSteven Savinoenergy_progress
11/19/2025Electric vehicle service equipment requirementsSteven Savinoenergy_progress
11/19/2025MeteringSteven Savinoenergy_progress
11/19/2025Interior lighting powerSteven Savinoenergy_progress
10/16/2025Lighting in dwelling unitsSteven Savinoenergy_progress
10/16/2025Structural Wood FrameSteven Savinoprogress
09/30/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
08/14/2025Fenestration air leakageSteven Savinoenergy_progress
08/14/2025Structural Steel - Detailsanthony santorospecial
08/14/2025Wood – Prefabricated I-JoistsSteven Savinospecial
08/14/2025Concrete - Cast-In-PlaceSteven Savinospecial
Latest 25 of 55.
▾Documents — 58 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026S00983127-I1Request digital key ↗
08/18/2026S01272202-S1Request digital key ↗
08/18/2026S01272202-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
12/26/2024540265737Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
01/16/2025540265737Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S01153915-I1Open ↗
08/13/2026S01272202-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S01153915-I1Open ↗
08/13/2026S01272202-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S01272202-I1Open ↗
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature8
08/24/2026S01272202-S1Open ↗
08/24/2026S01272202-S1Open ↗
08/22/2026S01182807-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/24/2026S01272202-S1Open ↗
08/22/2026S01182807-I1Open ↗
08/22/2026S01272202-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/18/2026S01272202-S1Open ↗
08/17/2026S01067174-I1Open ↗
08/13/2026S01153915-I1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/16/2025540265737Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/26/2024540265737Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S01153915-I1Open ↗
08/13/2026S01272202-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S01272202-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/18/2026S01272202-S1Open ↗
08/13/2026S01272202-I1Open ↗
08/13/2026S01153915-I1Open ↗
▸Inspections & Test Reports7
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026S01272202-I1Open ↗
08/13/2026S01153915-I1Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026S01272202-I1Open ↗
08/13/2026S01153915-I1Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
01/16/2025540265737Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/26/2024540265737Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026S01272202-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
01/16/2025540265737Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
12/26/2024540265737Open ↗
▸Other Documents10
▸BISBPP - SUPPORTING DOCUMENTATION2
01/16/2025540265737Open ↗
01/16/2025540265737Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026S01272202-I1Open ↗
08/13/2026S01153915-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S01272202-I1Open ↗
08/13/2026S01153915-I1Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
01/16/2025540265737Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
01/16/2025540265737Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026S01272202-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026S01153915-I1Open ↗