← Back
Two family converted from one family
439 RICHARD AVENUE
STATEN ISLAND · BIN 5087307
💬 Discuss this project
1950Year Built
1.67Stories
B3Building Class
R3XZoning
1,043 sfGross Floor Area
2Units
Two family converted from one family · Owner of record: ALASKA STREET HOLDINGS LLC · 10,400 sf lot · 0.1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 2 filings · 20 docs
Floor 2Under Construction12p · 3 filings · 20 docs
Floor 1Under Construction10p · 2 filings · 20 docs
CellarUnder Construction5p · 2 filings · 20 docs
BasementUnder Construction9p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AVID DESIGNS, INC407/09/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAXIMUM CONTRACTING INCGeneral Contractor307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AVID DESIGNS, INC.453407/09/2026
Building Lifecycle
All (54)Filed (4)Permit Issued (7)Inspection (1)Objection (12)Special Inspection (30)
09/30/2026
Permit issued — Foundation
S01418823-I1-ST
09/30/2026
Permit issued — General Construction
S01418823-I1-GC
09/30/2026
Permit issued — Mechanical Systems
S01418823-I1-FO
09/30/2026
Permit issued — Structural
S01418823-I1-MS
07/22/2026
Objection resolved — Addressed
07/15/2026
Objection resolved — Resolved
07/15/2026
Objection resolved — Addressed
07/14/2026
Objection raised — Fire_Protection
07/14/2026
Objection raised — Scope
07/14/2026
Objection raised — Zoning
07/09/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
RENOVATION, ENLARGEMENT OF EXISTING TWO-FAMILY DWELLING
S01418823-I1
06/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jeffrey Geary
06/18/2026
Special inspection requirement — Mechanical Systems
Jeffrey Geary
06/18/2026
Special inspection requirement — Concrete - Cast-In-Place
Jeffrey Geary
06/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Geary
06/18/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Jeffrey Geary
06/18/2026
Special inspection requirement — Subgrade Inspections
Jeffrey Geary
06/18/2026
Special inspection requirement — Final
Jeffrey Geary
06/18/2026
Special inspection requirement — Footing and Foundation
Jeffrey Geary
06/18/2026
Special inspection requirement — Energy Code Compliance Inspections
Jeffrey Geary
06/18/2026
Special inspection requirement — Fire-Resistance Rated Construction
Jeffrey Geary
06/18/2026
Special inspection requirement — Structural Wood Frame
Jeffrey Geary
06/18/2026
Special inspection requirement — Fenestration air leakage
Jeffrey Geary
06/18/2026
Special inspection requirement — Air barrier — testing
Jeffrey Geary
06/18/2026
Special inspection requirement — Maintenance information
Jeffrey Geary
06/18/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Jeffrey Geary
06/18/2026
Special inspection requirement — Air barrier - visual inspection
Jeffrey Geary
06/18/2026
Special inspection requirement — Metering
Jeffrey Geary
06/18/2026
Special inspection requirement — Fenestration areas
Jeffrey Geary
06/18/2026
Special inspection requirement — Duct leakage testing, insulation and design
Jeffrey Geary
06/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
Jeffrey Geary
06/18/2026
Special inspection requirement — Permanent certificate
Jeffrey Geary
06/18/2026
Special inspection requirement — Electric vehicle service equipment requirements
Jeffrey Geary
06/18/2026
Special inspection requirement — Ventilation and air distribution system
Jeffrey Geary
06/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Jeffrey Geary
06/18/2026
Special inspection requirement — Interior lighting power
Jeffrey Geary
06/18/2026
Special inspection requirement — Insulation placement and R values
Jeffrey Geary
06/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
Jeffrey Geary
06/12/2026
Permit issued — Structural
S01409088-I1-ST
06/12/2026
Permit issued — General Construction
S01409088-I1-GC
05/29/2026
Filed — Alteration
removal of selected exterior & interior partitions
S01409088-I1
05/29/2026
Special inspection requirement — Final
Jeffrey Geary
05/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jeffrey Geary
05/29/2026
Special inspection requirement — Structural Wood Frame
Jeffrey Geary
04/17/2026
Objection resolved — Open
04/17/2026
Objection resolved — Addressed
04/17/2026
Objection resolved — Addressed
03/03/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/16/2026
Permit issued — Construction Fence
S01298125-S1-FN
12/22/2025
Filed — Alteration CO
8' tall plywood construction fence to be used during construction operations for 437 & 439 Richard Ave
S01298125-S1
12/09/2025
Objection raised — Scope
12/09/2025
Objection raised — Scope
12/09/2025
Objection raised — Cost
11/11/2025
Filed — Alteration CO
8' tall plywood construction fence to be used during construction operations for 437 & 439 Richard Ave
S01298125-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedMAXIMUM CONTRACTING INC09/30/2026
DOB NOWGeneral ConstructionPermit IssuedMAXIMUM CONTRACTING INC09/30/2026
DOB NOWMechanical SystemsPermit IssuedMAXIMUM CONTRACTING INC09/30/2026
DOB NOWStructuralPermit IssuedMAXIMUM CONTRACTING INC09/30/2026
DOB NOWStructuralPermit IssuedMAXIMUM CONTRACTING INC06/12/2026
DOB NOWGeneral ConstructionPermit IssuedMAXIMUM CONTRACTING INC06/12/2026
DOB NOWConstruction FencePermit IssuedMAXIMUM CONTRACTING INC01/16/2026
2 projects · most recent 07/09/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/09/2026Permit IssuedMAXIMUM CONTRACTING INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin ×8
12/22/2025Permit IssuedMAXIMUM CONTRACTING INCHeating and Air Conditioning Systems
Heat / Cool
Daikin ×8
1 project · most recent 12/22/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/22/2025——Gas, Storm, Water/Sanitary
1 project · most recent 09/18/2026
FiledStatusContractorScope
09/18/2026Permit IssuedJSP ELECTL CNTNG CORP1 meters
3 projects · most recent 07/09/2026
Wood
FiledStatusContractorScope
07/09/2026Permit IssuedMAXIMUM CONTRACTING INCWood
05/29/2026Permit IssuedMAXIMUM CONTRACTING INCWood
12/22/2025Permit IssuedMAXIMUM CONTRACTING INCWood
1 project · most recent 12/22/2025
Fence
FiledStatusContractorScope
12/22/2025Permit IssuedMAXIMUM CONTRACTING INCFence
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/03/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
06/18/2026Structural Stability – Alterations of existing buildingsJeffrey Gearyspecial
06/18/2026Mechanical SystemsJeffrey Gearyspecial
06/18/2026Concrete - Cast-In-PlaceJeffrey Gearyspecial
06/18/2026Fire-Resistant Penetrations and JointsJeffrey Gearyspecial
06/18/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJeffrey Gearyspecial
06/18/2026Subgrade InspectionsJeffrey Gearyspecial
06/18/2026FinalJeffrey Gearyprogress
06/18/2026Footing and FoundationJeffrey Gearyprogress
06/18/2026Energy Code Compliance InspectionsJeffrey Gearyprogress
06/18/2026Fire-Resistance Rated ConstructionJeffrey Gearyprogress
06/18/2026Structural Wood FrameJeffrey Gearyprogress
06/18/2026Fenestration air leakageJeffrey Gearyenergy_progress
06/18/2026Air barrier — testing Jeffrey Gearyenergy_progress
06/18/2026Maintenance informationJeffrey Gearyenergy_progress
06/18/2026Fenestration and door U-factor and product ratingsJeffrey Gearyenergy_progress
06/18/2026Air barrier - visual inspectionJeffrey Gearyenergy_progress
06/18/2026MeteringJeffrey Gearyenergy_progress
06/18/2026Fenestration areasJeffrey Gearyenergy_progress
06/18/2026Duct leakage testing, insulation and designJeffrey Gearyenergy_progress
06/18/2026HVAC-R and service water heating system controlsJeffrey Gearyenergy_progress
06/18/2026Permanent certificateJeffrey Gearyenergy_progress
06/18/2026Electric vehicle service equipment requirementsJeffrey Gearyenergy_progress
06/18/2026Ventilation and air distribution systemJeffrey Gearyenergy_progress
06/18/2026HVAC-R and service water piping design and insulationJeffrey Gearyenergy_progress
06/18/2026Interior lighting powerJeffrey Gearyenergy_progress
Latest 25 of 30.
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/17/2026S01298125-I1Request digital key ↗
08/17/2026S01298125-S2Request digital key ↗
08/17/2026S01298125-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
10/14/2025520471962Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWRestrictive Declaration/Easement 13
08/14/2026S01418823-I1Open ↗
08/13/2026S01298125-I1Open ↗
08/13/2026S01298125-S1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/14/2026S01418823-I1Open ↗
08/13/2026S01298125-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/14/2026S01418823-I1Open ↗
08/13/2026S01298125-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/14/2026S01418823-I1Open ↗
08/13/2026S01298125-I1Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/17/2026S01298125-S2Open ↗
08/17/2026S01298125-S1Open ↗
08/17/2026S01298125-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026S01409088-I1Open ↗
08/23/2026S01409088-I1Open ↗
08/22/2026S01418823-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/23/2026S01409088-I1Open ↗
08/22/2026S01418823-I1Open ↗
08/22/2026S01418823-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/14/2026S01418823-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026S01298125-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/17/2026S01298125-S2Open ↗
08/17/2026S01298125-I1Open ↗
08/16/2026S01409088-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/14/2026S01418823-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/14/2026S01418823-I1Open ↗
08/13/2026S01298125-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
10/14/2025520471962Open ↗
▸Other Documents10
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/17/2026S01298125-I1Open ↗
08/14/2026S01418823-I1Open ↗
08/13/2026S01298125-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/14/2026S01418823-I1Open ↗
08/13/2026S01298125-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/17/2026S01298125-I1Open ↗
08/14/2026S01418823-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/14/2026S01418823-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026S01298125-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/16/2026S01409088-I1Open ↗