← Back
Two stories - detached, small or mid-size
276 RICHARD AVENUE
STATEN ISLAND · BIN 5087338
💬 Discuss this project
1960Year Built
2Stories
A1Building Class
R3XZoning
1,964 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 5,400 sf lot · 0.36 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Roof3p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
UNISOLAR106/03/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CENTURION SOLAR ENERGYGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CENTURION SOLAR ENERGY LL9475106/03/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
08/27/2025
Signed off — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
S01234373-I1
06/18/2025
Permit issued — Solar
S01234373-I1-SL
06/03/2025
Filed — Alteration
SCOPE OF WORK IS SOLELY FOR THE INSTALLATION OF THE SOLAR ELECTRONICGENERATING SYSTEM. ALL OTHER WORK IS NOT TO BE RELIED UPON AS BEINGAPPROVED AND/OR PERMITTED BY THE NYC DEPARTMENT OF BUILDINGS.*NO CHANGE TO USE, EGRESS OR OCCUPANCY.*
S01234373-I1
05/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Andres Arias Londono
05/31/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Andres Arias Londono
05/31/2025
Special inspection requirement — Energy Code Compliance Inspections
Andres Arias Londono
05/31/2025
Special inspection requirement — Final
Andres Arias Londono
05/31/2025
Special inspection requirement — Air barrier - visual inspection
Andres Arias Londono
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offCENTURION SOLAR ENERGY06/18/2025
BISPLISSUEDSCARAN PLUMBING INC02/06/2007
BIS—ISSUEDN/A03/03/2006
BIS—ISSUEDN/A02/04/2005
1 project · most recent 05/27/2025
FiledStatusContractorScope
05/27/2025CompleteBERGER QUALITY ELEC'L CON—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/31/2025Fire-Resistant Penetrations and JointsAndres Arias Londonospecial
05/31/2025Structural Stability – Alterations of existing buildingsAndres Arias Londonospecial
05/31/2025Energy Code Compliance InspectionsAndres Arias Londonoprogress
05/31/2025FinalAndres Arias Londonoprogress
05/31/2025Air barrier - visual inspectionAndres Arias Londonoenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026S01234373-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026S01234373-I1Open ↗
09/01/2026S01234373-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01234373-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026S01234373-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S01234373-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01234373-I1Open ↗