← Back
Two stories - detached, small or mid-size
245 JOLINE AVENUE
STATEN ISLAND · BIN 5087477
💬 Discuss this project
1899Year Built
2.5Stories
A1Building Class
R3XZoning
1,654 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 10,339 sf lot · 0.16 FAR built · Flood zone X
Locations of Work
Structural
Roof1p · 1 filing · 10 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROGERS CALVANICO GROUP PLLC307/02/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CLAIRE CONSTRUCTION CORPGeneral Contractor407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROGERS CALVANICO GROUP PL1324207/02/2025
Building Lifecycle
All (19)Filed (3)Permit Issued (4)Signed Off (2)Inspection (1)Special Inspection (9)
02/01/2026
Signed off — Alteration
REPLACE EXISTING OPEN PORCH WITH NEW ROOFED PORCH AS INDICATED ON DRAWINGS. REPLACE EXISTING 2ND FLOOR WINDOW TO ALLOW FOR ROOF OF NEW COVERED PORCH. NO CHANGE IN USE OR OCCUPANCY.
S01077842-I1
01/28/2026
Signed off — Alteration
REPLACE EXISTING OPEN PORCH WITH NEW ROOFED PORCH AS INDICATED ON DRAWINGS. REPLACE EXISTING 2ND FLOOR WINDOW TO ALLOW FOR ROOF OF NEW COVERED PORCH. NO CHANGE IN USE OR OCCUPANCY.
S01077842-S1
01/16/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/15/2025
Permit issued — Foundation
S01077842-I1-GC-CX
09/24/2025
Permit issued — Construction Fence
S01077842-S1-FN
07/02/2025
Filed — Alteration
REPLACE EXISTING OPEN PORCH WITH NEW ROOFED PORCH AS INDICATED ON DRAWINGS. REPLACE EXISTING 2ND FLOOR WINDOW TO ALLOW FOR ROOF OF NEW COVERED PORCH. NO CHANGE IN USE OR OCCUPANCY.
S01077842-P1
07/02/2025
Special inspection requirement — Masonry
Richard Dailey
07/02/2025
Special inspection requirement — Subgrade Inspections
Richard Dailey
07/02/2025
Special inspection requirement — Structural Steel - Details
Richard Dailey
07/02/2025
Special inspection requirement — Concrete - Cast-In-Place
Richard Dailey
07/02/2025
Special inspection requirement — Footing and Foundation
Richard Dailey
07/02/2025
Special inspection requirement — Final
Richard Dailey
07/02/2025
Special inspection requirement — Fenestration air leakage
Richard Dailey
07/02/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Richard Dailey
07/02/2025
Special inspection requirement — Fenestration areas
Richard Dailey
11/14/2024
Permit issued — Structural
S01077842-I1-GC-CX
11/14/2024
Permit issued — Construction Fence
S01077842-S1-FN
08/28/2024
Filed — Alteration
REPLACE EXISTING OPEN PORCH WITH NEW ROOFED PORCH AS INDICATED ON DRAWINGS. REPLACE EXISTING 2ND FLOOR WINDOW TO ALLOW FOR ROOF OF NEW COVERED PORCH. NO CHANGE IN USE OR OCCUPANCY.
S01077842-S1
07/24/2024
Filed — Alteration
REPLACE EXISTING OPEN PORCH WITH NEW ROOFED PORCH AS INDICATED ON DRAWINGS. REPLACE EXISTING 2ND FLOOR WINDOW TO ALLOW FOR ROOF OF NEW COVERED PORCH. NO CHANGE IN USE OR OCCUPANCY.
S01077842-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offCLAIRE CONSTRUCTION CORP10/15/2025
DOB NOWConstruction FenceSigned-offCLAIRE CONSTRUCTION CORP09/24/2025
DOB NOWStructuralSigned-offCLAIRE CONSTRUCTION CORP11/14/2024
DOB NOWConstruction FenceSigned-offCLAIRE CONSTRUCTION CORP11/14/2024
BISPLISSUEDRICHMOND CONSTRUCTION & P01/22/2020
BISEQISSUEDNICOLOSI BROS INC10/20/2009
BIS—ISSUEDNICOLOSI BROS INC10/20/2009
BISEQISSUEDJ. ROMERO CONSTRUCT. CORP08/14/2009
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/16/2026Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
07/02/2025MasonryRichard Daileyspecial
07/02/2025Subgrade InspectionsRichard Daileyspecial
07/02/2025Structural Steel - DetailsRichard Daileyspecial
07/02/2025Concrete - Cast-In-PlaceRichard Daileyspecial
07/02/2025Footing and FoundationRichard Daileyprogress
07/02/2025FinalRichard Daileyprogress
07/02/2025Fenestration air leakageRichard Daileyenergy_progress
07/02/2025Fenestration and door U-factor and product ratingsRichard Daileyenergy_progress
07/02/2025Fenestration areasRichard Daileyenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026S01077842-I1Request digital key ↗
08/21/2026S01077842-P1Request digital key ↗
08/21/2026S01077842-S1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026S01077842-I1Open ↗
08/21/2026S01077842-P1Open ↗
08/21/2026S01077842-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/27/2026S01077842-I1Open ↗
09/27/2026S01077842-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/27/2026S01077842-I1Open ↗
09/27/2026S01077842-I1Open ↗