← Back
Two stories - detached, small or mid-size
310 SLEIGHT AVENUE
STATEN ISLAND · BIN 5088107
💬 Discuss this project
1945Year Built
2Stories
A1Building Class
R3AZoning
924 sfGross Floor Area
1Units
6 Open Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · 8,775 sf lot · 0.11 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Floor 218p · 2 filings · 20 docs
Floor 116p · 2 filings · 20 docs
Cellar16p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CAPA SONS GENERAL CONSTRUCTION2304/09/2026
310 SLEIGHT AVE VENTURES LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RYAN DESIGN ARCHITECTURE802/26/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GRINBERG MANAGEMENT703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RICHMOND COUNTY DEVEL LLCGeneral Contractor504/09/2026
HIGH BEAM ELECTRIC CORP.Electrical103/22/2026
CHOICEPRO INCPlumbing106/28/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RYAN DESIGN ARCHITECTURE7159402/26/2026
Building Lifecycle
All (71)Filed (8)Permit Issued (5)Violation (12)Inspection (8)Objection (8)Special Inspection (30)
03/25/2026
Permit issued — General Construction
S01066688-S2-GC
03/09/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Daniel Ryan
03/09/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Daniel Ryan
03/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel Ryan
03/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Daniel Ryan
03/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
Daniel Ryan
03/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
Daniel Ryan
03/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/26/2026
Filed — Alteration
Installation of New plumbing ,sprinkler, gas and storm in exiting 1 family house
S00981610-P4
02/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Daniel Ryan
02/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel Ryan
02/26/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Daniel Ryan
02/26/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Daniel Ryan
02/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
Daniel Ryan
02/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
Daniel Ryan
02/11/2026
Filed — Alteration
Installation of New plumbing ,sprinkler, gas and storm in exiting 1 family house
S00981610-P3
01/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel Ryan
01/22/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Daniel Ryan
01/22/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Daniel Ryan
01/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
Daniel Ryan
01/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Daniel Ryan
01/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
Daniel Ryan
01/09/2026
Objection resolved — Addressed
01/09/2026
Special inspection requirement — Air barrier — testing
Daniel Ryan
01/09/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Daniel Ryan
01/09/2026
Special inspection requirement — Fenestration air leakage
Daniel Ryan
01/09/2026
Special inspection requirement — Fenestration areas
Daniel Ryan
01/09/2026
Special inspection requirement — Insulation placement and R values
Daniel Ryan
01/09/2026
Special inspection requirement — Permanent certificate
Daniel Ryan
01/09/2026
Special inspection requirement — Air barrier - visual inspection
Daniel Ryan
12/26/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/12/2025
Objection raised — Scope
11/21/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/20/2025
Filed — Alteration
CURB CUT 10'
S01066845-I1
11/20/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
legalization of horizontal and vertical enlargement of existing 1 family house , structural repair to remove violation for unsafe building
S01066688-S2
10/22/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
10/16/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/10/2025
Permit issued — Plumbing
S90455295-I1-PL
10/10/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/10/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/17/2025
Permit issued — Plumbing
S00981610-I1-PL
07/14/2025
Permit issued — General Construction
S01066688-I1-GC
05/27/2025
Permit issued — Construction Fence
S01066963-I1-FN
03/25/2025
Filed — Alteration
Installation of New plumbing ,sprinkler, gas and storm in exiting 1 family house
S00981610-P1
03/18/2025
Objection resolved — Addressed
03/05/2025
Objection resolved — Addressed
03/01/2025
Objection resolved — Addressed
03/01/2025
Special inspection requirement — HVAC-R and service water heating equipment
03/01/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
03/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/01/2025
Special inspection requirement — HVAC-R and service water heating system controls
03/01/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
02/26/2025
Objection raised — Fire_Protection
02/26/2025
Objection raised — Zoning
07/30/2024
Objection raised — Scope
07/22/2024
Filed — Alteration
S01066963-I1
07/21/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
legalization of horizontal and vertical enlargement of existing 1 family house , structural repair to remove violation for unsafe building
S01066688-I1
05/03/2024
Violation issued (ECB, closed)
Construction
02/26/2024
Violation issued (ECB, closed)
Unknown
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedRICHMOND COUNTY DEVEL LLC03/25/2026
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC10/10/2025
DOB NOWPlumbingPermit IssuedCHOICEPRO INC07/17/2025
DOB NOWGeneral ConstructionPermit IssuedRICHMOND COUNTY DEVEL LLC07/14/2025
DOB NOWConstruction FencePermit IssuedRICHMOND COUNTY DEVEL LLC05/27/2025
1 project · most recent 02/26/2026
Gas Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
02/26/2026Permit IssuedCHOICEPRO INCGas, Plumbing-Sprinkler, Storm, Water/Sanitary
1 project · most recent 09/29/2025
General Wiring
FiledStatusContractorScope
09/29/2025Permit IssuedHIGH BEAM ELECTRIC CORP.General Wiring
1 project · most recent 11/20/2025
Wood
FiledStatusContractorScope
11/20/2025Permit IssuedRICHMOND COUNTY DEVEL LLCWood
1 project · most recent 07/22/2024
Fence
FiledStatusContractorScope
07/22/2024Permit IssuedRICHMOND COUNTY DEVEL LLCFence
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/26/2025Pass-Final General Construction Non-Directive 14PassView ↗
11/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/22/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/16/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/10/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/10/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/10/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
03/09/2026Subsurface Investigations (Borings/Test Pits)Daniel Ryanspecial
03/09/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDaniel Ryanspecial
03/09/2026Fire-Resistant Penetrations and JointsDaniel Ryanspecial
03/09/2026HVAC-R and service water piping design and insulationDaniel Ryanenergy_progress
03/09/2026HVAC-R and service water heating equipmentDaniel Ryanenergy_progress
03/09/2026HVAC-R and service water heating system controlsDaniel Ryanenergy_progress
02/26/2026HVAC-R and service water piping design and insulationDaniel Ryanenergy_progress
02/26/2026Fire-Resistant Penetrations and JointsDaniel Ryanspecial
02/26/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDaniel Ryanspecial
02/26/2026Subsurface Investigations (Borings/Test Pits)Daniel Ryanspecial
02/26/2026HVAC-R and service water heating equipmentDaniel Ryanenergy_progress
02/26/2026HVAC-R and service water heating system controlsDaniel Ryanenergy_progress
01/22/2026Fire-Resistant Penetrations and JointsDaniel Ryanspecial
01/22/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationDaniel Ryanspecial
01/22/2026Subsurface Investigations (Borings/Test Pits)Daniel Ryanspecial
01/22/2026HVAC-R and service water heating system controlsDaniel Ryanenergy_progress
01/22/2026HVAC-R and service water piping design and insulationDaniel Ryanenergy_progress
01/22/2026HVAC-R and service water heating equipmentDaniel Ryanenergy_progress
01/09/2026Air barrier — testing Daniel Ryanenergy_progress
01/09/2026Fenestration and door U-factor and product ratingsDaniel Ryanenergy_progress
01/09/2026Fenestration air leakageDaniel Ryanenergy_progress
01/09/2026Fenestration areasDaniel Ryanenergy_progress
01/09/2026Insulation placement and R valuesDaniel Ryanenergy_progress
01/09/2026Permanent certificateDaniel Ryanenergy_progress
01/09/2026Air barrier - visual inspectionDaniel Ryanenergy_progress
Latest 25 of 50.
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/21/2026S01066963-I1Request digital key ↗
08/17/2026S01066688-I1Request digital key ↗
08/17/2026S01066688-S2Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits2
▸BISBPP-16 - Application for waiver of curb alignment and/or sidewalk and curb1
08/07/2024540264505Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
08/07/2024540264505Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S01066688-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S01066688-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S01066688-I1Open ↗
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/17/2026S01066845-I1Open ↗
08/17/2026S00981610-P1Open ↗
08/17/2026S00981610-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026S00981610-P4Open ↗
09/01/2026S00981610-P4Open ↗
09/01/2026S00981610-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026S00981610-P4Open ↗
09/01/2026S00981610-I1Open ↗
08/31/2026S01066688-S2Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/26/2024540264505Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
07/26/2024540264505Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S01066688-I1Open ↗
08/13/2026S01066688-S2Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026S01066688-S2Open ↗
08/13/2026S01066688-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/17/2026S00981610-P3Open ↗
08/17/2026S00981610-P1Open ↗
08/17/2026S00981610-I1Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports10
▸DOB NOWSOIL REPORT5
08/17/2026S00981610-P3Open ↗
08/17/2026S00981610-P1Open ↗
08/17/2026S00981610-I1Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-9 - Request for Builders Pavement Field Inspection2
08/07/2024540264505Open ↗
07/26/2024540264505Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026S00981610-I1Open ↗
08/13/2026S01066688-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026S01066688-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
08/07/2024540264505Open ↗
▸Other Documents6
▸DOB NOWSite Survey: Initial2
08/13/2026S01066688-I1Open ↗
08/13/2026S01066688-S2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S01066688-I1Open ↗
08/13/2026S01066688-S2Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
08/07/2024540264505Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026S01066688-I1Open ↗