← Back
Two family frame
21 BRIGHTON STREET
STATEN ISLAND · BIN 5088119
💬 Discuss this project
1910Year Built
2.5Stories
B2Building Class
R3AZoning
2,416 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Two family frame · 3,742 sf lot · 0.65 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Permit Issued — active, not yet Signed-off
Floor 2Under Construction7p · 1 filing · 20 docs
Floor 1Under Construction6p · 1 filing · 20 docs
CellarUnder Construction7p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
D C F CONTRACTING1009/01/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PERMANENT ENGINEERING P.C.608/07/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MICHAEL ROWE CONSULTING AND EXPEDIT603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
D.C.F. CONTRACTING INCGeneral Contractor204/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738408/07/2026
Building Lifecycle
All (42)Filed (6)Permit Issued (2)Violation (1)Inspection (3)Special Inspection (30)
08/07/2026
Filed — Alteration
INTERIOR RENOVATION TO CELL, 001,002 FLRS. EXTERIOR WORK REMOVE AND REPLACE ALL SIDING AND REPLACE WITH PORTIONS OF PLYWOOD SHEETHING ON ALL ELEVATIONS. REMOVE AND REPLACE WIND. AS PER PLAN.RESIDENCE DOES NOT HAVE COFO THEREFORE NO NEW C OF O IS REQ.
S01203277-P3
08/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
08/07/2026
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
08/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
08/07/2026
Special inspection requirement — Subgrade Inspections
anthony santoro
08/07/2026
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
08/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
08/07/2026
Special inspection requirement — Fenestration air leakage
anthony santoro
08/07/2026
Special inspection requirement — Interior lighting power
anthony santoro
08/07/2026
Special inspection requirement — Metering
anthony santoro
08/07/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
08/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
08/07/2026
Special inspection requirement — Air barrier — testing
anthony santoro
08/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
08/07/2026
Special inspection requirement — Fenestration areas
anthony santoro
08/07/2026
Special inspection requirement — Permanent certificate
anthony santoro
08/07/2026
Special inspection requirement — Maintenance information
anthony santoro
08/07/2026
Special inspection requirement — Insulation placement and R values
anthony santoro
04/09/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/24/2026
Filed — Alteration
INTERIOR RENOVATION TO CELL, 001,002 FLRS. EXTERIOR WORK REMOVE AND REPLACE ALL SIDING AND REPLACE WITH PORTIONS OF PLYWOOD SHEETHING ON ALL ELEVATIONS. REMOVE AND REPLACE WIND. AS PER PLAN.RESIDENCE DOES NOT HAVE COFO THEREFORE NO NEW C OF O IS REQ.
S01203277-P2
03/16/2026
Filed — Alteration
INTERIOR RENOVATION TO CELL, 001,002 FLRS. EXTERIOR WORK REMOVE AND REPLACE ALL SIDING AND REPLACE WITH PORTIONS OF PLYWOOD SHEETHING ON ALL ELEVATIONS. REMOVE AND REPLACE WIND. AS PER PLAN.RESIDENCE DOES NOT HAVE COFO THEREFORE NO NEW C OF O IS REQ.
S01203277-P1
03/12/2026
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
03/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
03/12/2026
Special inspection requirement — Subgrade Inspections
anthony santoro
03/12/2026
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
03/12/2026
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
03/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
03/12/2026
Special inspection requirement — Air barrier — testing
anthony santoro
03/12/2026
Special inspection requirement — Maintenance information
anthony santoro
03/12/2026
Special inspection requirement — Fenestration areas
anthony santoro
03/12/2026
Special inspection requirement — Fenestration air leakage
anthony santoro
03/12/2026
Special inspection requirement — Insulation placement and R values
anthony santoro
03/12/2026
Special inspection requirement — Metering
anthony santoro
03/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
01/21/2026
Violation issued (ECB, open)
Construction
12/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/07/2025
Permit issued — Construction Fence
S01203277-S1-FN
11/07/2025
Permit issued — General Construction
S01203277-I1-GC
04/23/2025
Filed — Alteration
INTERIOR RENOVATION TO CELL, 001,002 FLRS. EXTERIOR WORK REMOVE AND REPLACE ALL SIDING AND REPLACE WITH PORTIONS OF PLYWOOD SHEETHING ON ALL ELEVATIONS. REMOVE AND REPLACE WIND. AS PER PLAN.RESIDENCE DOES NOT HAVE COFO THEREFORE NO NEW C OF O IS REQ.
S01203277-S2
04/04/2025
Filed — Alteration
INTERIOR RENOVATION TO CELL, 001,002 FLRS. EXTERIOR WORK REMOVE AND REPLACE ALL SIDING AND REPLACE WITH PORTIONS OF PLYWOOD SHEETHING ON ALL ELEVATIONS. REMOVE AND REPLACE WIND. AS PER PLAN.RESIDENCE DOES NOT HAVE COFO THEREFORE NO NEW C OF O IS REQ.
S01203277-I1
04/04/2025
Filed — Alteration
INTERIOR RENOVATION TO CELL, 001,002 FLRS. EXTERIOR WORK REMOVE AND REPLACE ALL SIDING AND REPLACE WITH PORTIONS OF PLYWOOD SHEETHING ON ALL ELEVATIONS. REMOVE AND REPLACE WIND. AS PER PLAN.RESIDENCE DOES NOT HAVE COFO THEREFORE NO NEW C OF O IS REQ.
S01203277-S1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedD.C.F. CONTRACTING INC11/07/2025
DOB NOWGeneral ConstructionPermit IssuedD.C.F. CONTRACTING INC11/07/2025
BISOTISSUEDN/A09/22/1999
1 project · most recent 08/07/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/07/2026——Gas, Water/Sanitary
1 project · most recent 06/15/2026
General Wiring
FiledStatusContractorScope
06/15/2026Permit IssuedJ.V.C. ELEC SERVICE CORPGeneral Wiring
1 project · most recent 08/07/2026
Fence
FiledStatusContractorScope
08/07/2026Permit IssuedD.C.F. CONTRACTING INCFence
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/09/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/09/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
08/07/2026HVAC-R and service water piping design and insulationanthony santoroenergy_progress
08/07/2026Concrete - Cast-In-Placeanthony santorospecial
08/07/2026Fire-Resistant Penetrations and Jointsanthony santorospecial
08/07/2026Subgrade Inspectionsanthony santorospecial
08/07/2026Energy Code Compliance Inspectionsanthony santoroprogress
08/07/2026Fire-Resistance Rated Constructionanthony santoroprogress
08/07/2026Fenestration air leakageanthony santoroenergy_progress
08/07/2026Interior lighting poweranthony santoroenergy_progress
08/07/2026Meteringanthony santoroenergy_progress
08/07/2026Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
08/07/2026HVAC-R and service water heating equipmentanthony santoroenergy_progress
08/07/2026Air barrier — testing anthony santoroenergy_progress
08/07/2026HVAC-R and service water heating system controlsanthony santoroenergy_progress
08/07/2026Fenestration areasanthony santoroenergy_progress
08/07/2026Permanent certificateanthony santoroenergy_progress
08/07/2026Maintenance informationanthony santoroenergy_progress
08/07/2026Insulation placement and R valuesanthony santoroenergy_progress
03/12/2026Concrete - Cast-In-Placeanthony santorospecial
03/12/2026Fire-Resistant Penetrations and Jointsanthony santorospecial
03/12/2026Subgrade Inspectionsanthony santorospecial
03/12/2026Energy Code Compliance Inspectionsanthony santoroprogress
03/12/2026Fire-Resistance Rated Constructionanthony santoroprogress
03/12/2026HVAC-R and service water piping design and insulationanthony santoroenergy_progress
03/12/2026Air barrier — testing anthony santoroenergy_progress
03/12/2026Maintenance informationanthony santoroenergy_progress
Latest 25 of 34.
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/19/2026S01203277-I1Request digital key ↗
08/19/2026S01203277-P3Request digital key ↗
08/19/2026S01203277-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/19/2026S01203277-I1Open ↗
08/19/2026S01203277-P3Open ↗
08/19/2026S01203277-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/30/2026S01203277-P1Open ↗
08/30/2026S01203277-P1Open ↗
08/28/2026S01203277-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/30/2026S01203277-P1Open ↗
08/28/2026S01203277-P3Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/19/2026S01203277-P3Open ↗
08/19/2026S01203277-P2Open ↗
08/19/2026S01203277-I1Open ↗
Showing 3 of 5 on file for this type