← Back
Two family frame
79 POMPEY AVENUE
STATEN ISLAND · BIN 5104392
💬 Discuss this project
1991Year Built
2Stories
B2Building Class
R3-2Zoning
2,704 sfGross Floor Area
2Units
9 Open Violations 7 unresolved · 2 paperwork only ▸FDNY Report ↗
Two family frame · Owner of record: DEUTSCHE BANK NATIONAL TRUST COMPANY · 13,720 sf lot · 0.2 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MW PROFESSIONAL ENGINEERING, P.C.211/13/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JRK CREATIVE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FIRST STAR CONSTRUCTION *General Contractor107/08/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MW PROFESSIONAL ENGINEERI570211/13/2025
Building Lifecycle
All (55)Filed (2)Permit Issued (2)Signed Off (2)Violation (38)Inspection (8)Special Inspection (3)
05/28/2026
Violation issued (ECB, open)
Zoning
04/21/2026
Signed off — Alteration
INTERIOR RENOVATION FOR EXIST. 2 FAMILY DWELLING UNITS,ON CELLAR,1ST FL..TO REMOVE ILLEGAL PARTITION WALL AND PLUMBING WORK FILING SEPARATE APPLICATION ,OT REMEDY ECB VIOLATION #34911780Z,#3462379H & #34623790X.NO CHANGE ON MEANS OF USE EGRESS OR OCCUPANC
S01314341-I1
04/21/2026
Signed off — Alteration
FILED TO REMOVE ILLEGAL PL FIXTURES ON CEL,1ST FL; RELOCATE 3 EX. BOILERS, 3 EX. STORAGE TANKS FOR EXIST. TWO FAMILY DWELLING UNITS; GENERAL CONSTRUCTION WORK FILED SEPARATELY. ,TO REMEDY ECB VIOLATION #34911780Z,#34623791H & #34623790X,
S01314356-I1
04/20/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/13/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/31/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/30/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/30/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/26/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/24/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/17/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/07/2026
Permit issued — General Construction
S01314341-I1-GC
01/07/2026
Permit issued — Plumbing
S01314356-I1-PL
11/13/2025
Filed — Alteration
INTERIOR RENOVATION FOR EXIST. 2 FAMILY DWELLING UNITS,ON CELLAR,1ST FL..TO REMOVE ILLEGAL PARTITION WALL AND PLUMBING WORK FILING SEPARATE APPLICATION ,OT REMEDY ECB VIOLATION #34911780Z,#3462379H & #34623790X.NO CHANGE ON MEANS OF USE EGRESS OR OCCUPANC
S01314341-I1
11/13/2025
Filed — Alteration
FILED TO REMOVE ILLEGAL PL FIXTURES ON CEL,1ST FL; RELOCATE 3 EX. BOILERS, 3 EX. STORAGE TANKS FOR EXIST. TWO FAMILY DWELLING UNITS; GENERAL CONSTRUCTION WORK FILED SEPARATELY. ,TO REMEDY ECB VIOLATION #34911780Z,#34623791H & #34623790X,
S01314356-I1
11/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MING WAI WONG
11/07/2025
Special inspection requirement — Energy Code Compliance Inspections
MING WAI WONG
11/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
MING WAI WONG
01/23/2025
Violation issued (HPD, closed)
I
01/21/2025
Violation issued (HPD, open)
C
01/21/2025
Violation issued (HPD, open)
B
01/21/2025
Violation issued (HPD, closed)
C
01/05/2023
Violation issued (HPD, open)
C
01/05/2023
Violation issued (HPD, closed)
C
01/05/2023
Violation issued (HPD, open)
C
07/12/2022
Violation issued (HPD, closed)
I
07/11/2022
Violation issued (HPD, open)
C
07/11/2022
Violation issued (HPD, closed)
C
11/13/2013
Violation issued (ECB, closed)
Construction
11/13/2013
Violation issued (ECB, closed)
Construction
09/30/2013
Violation issued (ECB, closed)
Construction
08/28/2013
Violation issued (ECB, closed)
Construction
10/02/2012
Violation issued (ECB, closed)
Construction
08/14/2012
Violation issued (ECB, closed)
Construction
06/18/2012
Violation issued (ECB, closed)
Construction
04/03/2012
Violation issued (ECB, closed)
Construction
04/03/2012
Violation issued (ECB, closed)
Construction
02/04/2012
Violation issued (ECB, closed)
Construction
12/14/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/14/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/29/2011
Violation issued (ECB, closed)
Construction
11/02/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/20/2011
Violation issued (ECB, open)
Boilers
09/16/2011
Violation issued (ECB, closed)
Plumbing
08/11/2011
Violation issued (ECB, closed)
Construction
08/11/2011
Violation issued (ECB, closed)
Construction
08/11/2011
Violation issued (ECB, closed)
Construction
06/16/2011
Violation issued (ECB, closed)
Construction
06/16/2011
Violation issued (ECB, closed)
Construction
05/16/2011
Violation issued (HPD, open)
A
02/04/2008
Violation issued (ECB, closed)
Quality of Life
02/04/2008
Violation issued (DOB, open)
VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
02/04/2008
Violation issued (ECB, closed)
Quality of Life
01/29/1999
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
07/27/1993
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offFIRST STAR CONSTRUCTION *01/07/2026
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC01/07/2026
1 project · most recent 12/09/2025
General Wiring
FiledStatusContractorScope
12/09/2025CompleteKWONG MING ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/20/2026Pass-Final General Construction Non-Directive 14PassView ↗
04/13/2026Fail-Final General Construction Non-Directive 14FailView ↗
03/31/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/30/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/30/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/26/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/24/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/17/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
11/07/2025Fire-Resistant Penetrations and JointsMING WAI WONGspecial
11/07/2025Energy Code Compliance InspectionsMING WAI WONGprogress
11/07/2025HVAC-R and service water heating system controlsMING WAI WONGenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026S01314341-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026S01314356-I1Open ↗
08/13/2026S01314341-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/22/2026S01314356-I1Open ↗
08/22/2026S01314356-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/22/2026S01314356-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026S01314356-I1Open ↗
08/13/2026S01314341-I1Open ↗