← Back
Two family frame
341 DARLINGTON AVENUE
STATEN ISLAND · BIN 5110856
💬 Discuss this project
1992Year Built
2Stories
B2Building Class
R3XZoning
4,160 sfGross Floor Area
2Units
3 Open Violations ▸FDNY Report ↗
Two family frame · 7,700 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DESIGN BUILD SI, INC.203/09/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A+ EXPEDITING INC.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ERNEST GALLARELLOElectrical103/21/2026
PATRIOT PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DESIGN BUILD, SI, INC6114203/09/2023
Building Lifecycle
All (30)Filed (2)Permit Issued (1)Signed Off (1)Violation (5)Inspection (5)Objection (2)Special Inspection (14)
06/09/2023
Signed off — Alteration
APPLIC FILED FOR INSTALLATION OF 1 NEW GAS-FIRED STANDBY GENERATOR, 1 NEW GAS-FIRED POOL HEATER AND 1 NEW GAS-FIRED SNOW MELT BOILER. INSTALLATION OF 1 GAS-FIRED COMBINATION HOT WATER BOILER/HEATER TO REPLACE ONE EX. BOILER AND ONE EX. HOT WATER HEATER
S00563559-I1
05/25/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/19/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/14/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/06/2023
Objection resolved — Addressed
04/06/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Giuseppe Bonomo
04/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Giuseppe Bonomo
04/06/2023
Special inspection requirement — Energy Code Compliance Inspections
Giuseppe Bonomo
04/06/2023
Special inspection requirement — HVAC-R and service water heating system controls
Giuseppe Bonomo
04/06/2023
Special inspection requirement — Maintenance information
Giuseppe Bonomo
04/06/2023
Special inspection requirement — HVAC-R and service water heating equipment
Giuseppe Bonomo
04/06/2023
Special inspection requirement — Permanent certificate
Giuseppe Bonomo
03/22/2023
Objection raised — Scope
03/09/2023
Filed — Alteration
APPLIC FILED FOR INSTALLATION OF 1 NEW GAS-FIRED STANDBY GENERATOR, 1 NEW GAS-FIRED POOL HEATER AND 1 NEW GAS-FIRED SNOW MELT BOILER. INSTALLATION OF 1 GAS-FIRED COMBINATION HOT WATER BOILER/HEATER TO REPLACE ONE EX. BOILER AND ONE EX. HOT WATER HEATER
S00563559-P1
03/09/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Giuseppe Bonomo
03/09/2023
Special inspection requirement — Energy Code Compliance Inspections
Giuseppe Bonomo
03/09/2023
Special inspection requirement — HVAC-R and service water heating equipment
Giuseppe Bonomo
03/09/2023
Special inspection requirement — Maintenance information
Giuseppe Bonomo
03/09/2023
Special inspection requirement — Permanent certificate
Giuseppe Bonomo
03/09/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Giuseppe Bonomo
03/09/2023
Special inspection requirement — HVAC-R and service water heating system controls
Giuseppe Bonomo
01/27/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/10/2022
Permit issued — Plumbing
S00563559-I1-PL
10/12/2021
Filed — Alteration
APPLIC FILED FOR INSTALLATION OF 1 NEW GAS-FIRED STANDBY GENERATOR, 1 NEW GAS-FIRED POOL HEATER AND 1 NEW GAS-FIRED SNOW MELT BOILER. INSTALLATION OF 1 GAS-FIRED COMBINATION HOT WATER BOILER/HEATER TO REPLACE ONE EX. BOILER AND ONE EX. HOT WATER HEATER
S00563559-I1
04/05/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/10/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/31/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/31/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPATRIOT PLBG & HTG INC08/10/2022
BISOTISSUEDSEA BRIGHT SOLAR LLC12/04/2015
BISPLISSUEDR. MCGLYNN PLUMBING CORP03/20/2014
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/25/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/19/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/14/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/09/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/27/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
04/06/2023HVAC-R and service water piping design and insulationGiuseppe Bonomoenergy_progress
04/06/2023Fire-Resistant Penetrations and JointsGiuseppe Bonomospecial
04/06/2023Energy Code Compliance InspectionsGiuseppe Bonomoprogress
04/06/2023HVAC-R and service water heating system controlsGiuseppe Bonomoenergy_progress
04/06/2023Maintenance informationGiuseppe Bonomoenergy_progress
04/06/2023HVAC-R and service water heating equipmentGiuseppe Bonomoenergy_progress
04/06/2023Permanent certificateGiuseppe Bonomoenergy_progress
03/09/2023Fire-Resistant Penetrations and JointsGiuseppe Bonomospecial
03/09/2023Energy Code Compliance InspectionsGiuseppe Bonomoprogress
03/09/2023HVAC-R and service water heating equipmentGiuseppe Bonomoenergy_progress
03/09/2023Maintenance informationGiuseppe Bonomoenergy_progress
03/09/2023Permanent certificateGiuseppe Bonomoenergy_progress
03/09/2023HVAC-R and service water piping design and insulationGiuseppe Bonomoenergy_progress
03/09/2023HVAC-R and service water heating system controlsGiuseppe Bonomoenergy_progress
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026S00563559-I1Request digital key ↗
08/15/2026S00563559-P1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
04/25/2016540085655Open ↗
11/23/2015540085655Open ↗
03/12/2014520187887Open ↗
▸BISWORK PERMIT APPLICATION2
12/04/2015540085655Open ↗
03/24/2014520187887Open ↗
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature12
09/02/2026S00563559-P1Open ↗
09/02/2026S00563559-P1Open ↗
09/02/2026S00563559-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/23/2026S00563559-I1Open ↗
08/23/2026S00563559-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026S00563559-P1Open ↗
09/02/2026S00563559-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/23/2015540085655Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/12/2014520187887Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/12/2014520187887Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/12/2014520187887Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
03/12/2014520187887Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/11/2016540085655Open ↗
11/23/2015540085655Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION2
05/06/2016540085655Open ↗
11/23/2015540085655Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/12/2014520187887Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/11/2016540085655Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
03/11/2016540085655Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00563559-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/11/2016540085655Open ↗
11/23/2015540085655Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION2
03/11/2016540085655Open ↗
11/23/2015540085655Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/12/2014520187887Open ↗
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
03/11/2016540085655Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/11/2016540085655Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
05/17/2016540085655Open ↗
05/06/2016540085655Open ↗
11/23/2015540085655Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION6
03/17/2016520187887Open ↗
12/03/2015540085655Open ↗
12/03/2015540085655Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
11/23/2015540085655Open ↗
▸BISEFILING COVER SHEET1
03/12/2014520187887Open ↗