← Back
Church, synagogue, chapel
1120 CASTLETON AVENUE
STATEN ISLAND · BIN 5112945
💬 Discuss this project
1940Year Built
2Stories
M1Building Class
R3-2Zoning
4,032 sfGross Floor Area
2Units
9 Open Violations 7 unresolved · 2 paperwork only ▸FDNY Report ↗
Church, synagogue, chapel · Owner of record: NEW LIFE CHURCH OF ST · 6,400 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
MechanicalCivil
Roof1p · 1 filing · 6 docs
Floor 11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW LIFE CHURCH OF ST203/22/2026
NEW LIFE CHURCH OF SI103/22/2026
NEW LIFE CHURCH OF STATEN203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEVEN R. SAVINO ARCHITECT PC709/20/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUPERIOR PLUMBING & HEATINGPlumbing507/08/2026
JOSEPH RIZZUTIGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STEVEN R. SAVINO ARCHIT1216605/29/2024
Building Lifecycle
All (67)Filed (7)Permit Issued (6)Signed Off (5)Violation (19)Inspection (7)Special Inspection (23)
06/18/2025
Signed off — Alteration
FIRE RATE EXISTING WALLS AND FLOOR IN BOILER ROOMS ON THE SECOND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S08038940-I1
05/16/2025
Permit issued — General Construction
S08038940-I1-GC
12/17/2024
Signed off — Alteration
Subsequent filing to change the designation of the boiler from new to existing on the plan and the legalization of the 2-existing boilers on the second floor and disconnect and re-connection of the hot water heaters once the floor is repaired.
S00660581-I1
12/11/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/19/2024
Signed off — Alteration
Subsequent filing to change the designation of the boiler from new to existing on the plan and the legalization of the 2-existing boilers on the second floor and disconnect and re-connection of the hot water heaters once the floor is repaired.
S00660581-S1
09/30/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
09/23/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
09/23/2024
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
09/23/2024
Special inspection requirement — Tenant Protection Plan Compliance
Steven Savino
09/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
09/20/2024
Filed — Alteration
Subsequent filing to change the designation of the boiler from new to existing on the plan and the legalization of the 2-existing boilers on the second floor and disconnect and re-connection of the hot water heaters once the floor is repaired.
S00660581-P1
09/03/2024
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
09/03/2024
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
09/03/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
09/03/2024
Special inspection requirement — Tenant Protection Plan Compliance
09/03/2024
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
08/30/2024
Signed off — Alteration
REGISTER THE BOILERS WITH THE BOILER DIVISION
S00681187-I1
08/30/2024
Signed off — Alteration
REGISTER THE BOILERS WITH THE BOILER DIVISION
S00681187-S1
08/16/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/12/2024
Inspection — No Access-Final Boiler Equipment Inspection
No Access
View inspection ↗
07/09/2024
Permit issued — Boiler Equipment
S00681187-S1-BE
05/29/2024
Filed — Alteration
REGISTER THE BOILERS WITH THE BOILER DIVISION
S00681187-P1
05/22/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
05/22/2024
Special inspection requirement — Tenant Protection Plan Compliance
Steven Savino
05/22/2024
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
05/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
03/20/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/14/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/07/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/25/2024
Filed — Alteration
FIRE RATE EXISTING WALLS AND FLOOR IN BOILER ROOMS ON THE SECOND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S08038940-I1
12/28/2023
Permit issued — Boiler Equipment
S00681187-I1-BE
12/27/2023
Permit issued — Boiler Equipment
S00681187-S1-BE
12/27/2023
Permit issued — Plumbing
S00660581-S1-PL
12/27/2023
Permit issued — Plumbing
S00660581-I1-PL
10/18/2023
Filed — Alteration
Subsequent filing to change the designation of the boiler from new to existing on the plan and the legalization of the 2-existing boilers on the second floor and disconnect and re-connection of the hot water heaters once the floor is repaired.
S00660581-S1
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/03/2023
Filed — Alteration
REGISTER THE BOILERS WITH THE BOILER DIVISION
S00681187-S1
02/01/2023
Filed — Alteration
REGISTER THE BOILERS WITH THE BOILER DIVISION
S00681187-I1
02/01/2023
Special inspection requirement — Tenant Protection Plan Compliance
Steven Savino
01/31/2023
Filed — Alteration
Subsequent filing to change the designation of the boiler from new to existing on the plan and the legalization of the 2-existing boilers on the second floor and disconnect and re-connection of the hot water heaters once the floor is repaired.
S00660581-I1
01/31/2023
Special inspection requirement — Tenant Protection Plan Compliance
Steven Savino
02/15/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
02/15/2022
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
02/15/2022
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
02/15/2022
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
02/15/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
02/15/2022
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
02/15/2022
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
01/17/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/05/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/05/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/19/2016
Violation issued (ECB, closed)
Boilers
07/12/2016
Violation issued (ECB, closed)
Boilers
07/12/2016
Violation issued (ECB, closed)
Construction
06/15/2016
Violation issued (HPD, closed)
C
06/15/2016
Violation issued (HPD, closed)
C
06/15/2016
Violation issued (HPD, open)
B
06/15/2016
Violation issued (HPD, open)
B
06/15/2016
Violation issued (HPD, open)
B
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJOSEPH RIZZUTI05/16/2025
DOB NOWBoiler EquipmentSigned-offSUPERIOR PLUMBING & HEATI07/09/2024
DOB NOWBoiler EquipmentSigned-offSUPERIOR PLUMBING & HEATI12/28/2023
DOB NOWBoiler EquipmentSigned-offSUPERIOR PLUMBING & HEATI12/27/2023
DOB NOWPlumbingSigned-offSUPERIOR PLUMBING & HEATI12/27/2023
DOB NOWPlumbingSigned-offSUPERIOR PLUMBING & HEATI12/27/2023
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
12/11/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/30/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/16/2024Pass-Final Boiler Equipment InspectionPassView ↗
07/12/2024No Access-Final Boiler Equipment InspectionNo AccessView ↗
03/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/14/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/07/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
09/23/2024HVAC-R and service water heating system controlsSteven Savinoenergy_progress
09/23/2024HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
09/23/2024Energy Code Compliance InspectionsSteven Savinoprogress
09/23/2024Tenant Protection Plan ComplianceSteven Savinospecial
09/23/2024HVAC-R and service water heating equipmentSteven Savinoenergy_progress
09/03/2024HVAC-R and service water heating system controlsSteven Savinoenergy_progress
09/03/2024Energy Code Compliance InspectionsSteven Savinoprogress
09/03/2024HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
09/03/2024Tenant Protection Plan Compliance—special
09/03/2024HVAC-R and service water heating equipmentSteven Savinoenergy_progress
05/22/2024HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
05/22/2024Tenant Protection Plan ComplianceSteven Savinospecial
05/22/2024HVAC-R and service water heating system controlsSteven Savinoenergy_progress
05/22/2024HVAC-R and service water heating equipmentSteven Savinoenergy_progress
02/01/2023Tenant Protection Plan ComplianceSteven Savinospecial
01/31/2023Tenant Protection Plan ComplianceSteven Savinospecial
02/15/2022HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
02/15/2022HVAC-R and service water heating equipmentSteven Savinoenergy_progress
02/15/2022Energy Code Compliance InspectionsSteven Savinoprogress
02/15/2022HVAC-R and service water heating system controlsSteven Savinoenergy_progress
02/15/2022HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
02/15/2022HVAC-R and service water heating equipmentSteven Savinoenergy_progress
02/15/2022HVAC-R and service water heating system controlsSteven Savinoenergy_progress
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/23/2026S00681187-S1Request digital key ↗
08/23/2026S00681187-I1Request digital key ↗
08/23/2026S00681187-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature14
09/19/2026S00681187-I1Open ↗
08/28/2026S00681187-P1Open ↗
08/25/2026S00660581-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/23/2026S00681187-S1Open ↗
08/23/2026S00681187-I1Open ↗
08/23/2026S00681187-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/19/2026S00681187-I1Open ↗
08/28/2026S00681187-P1Open ↗
08/23/2026S00660581-S1Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs7
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
08/23/2026S00681187-I1Open ↗
08/23/2026S00681187-S1Open ↗
08/23/2026S00681187-P1Open ↗
Showing 3 of 7 on file for this type