Two stories - detached, small or mid-size
965 POST AVENUE
STATEN ISLAND · BIN 5113206
💬 Discuss this project
1899Year Built
2Stories
A1Building Class
R3AZoning
1,202 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Two stories - detached, small or mid-size · 5,000 sf lot · 0.24 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 10 docs
Floor 2Under Construction11p · 1 filing · 20 docs
Floor 1Under Construction9p · 1 filing · 20 docs
CellarUnder Construction5p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AL FFRED ARCHITECTURE PLLC502/05/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MISTER EXPEDITER503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SOHO CONSTRUCTION MANAGEMENTGeneral Contractor407/08/2026
BEST MECHANICAL SVCS INCPlumbing208/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MSM ENGINEERING SERVICES,8449202/05/2026
M. INT'L ENGINEERING PLLC3129105/03/2023
Building Lifecycle
All (9)Filed (5)Permit Issued (4)
08/20/2026
Permit issued — Plumbing
S00863386-S1-PL
02/05/2026
Filed — Alteration
SUBSEQUENT APPLICATION FILED HEREWITH FOR PLUMBING WORK TYPE, INSTALLATION OF NEW PLUMBING FIXTURES, COLDAND HOT WATER PIPES AND CAPPING OF EXISTING GAS LINE, IN CONJUNCTION TO ALT JOB S00863386-I1
S00863386-P1
05/01/2025
Permit issued — Plumbing
S00863386-S1-PL
08/25/2023
Filed — Alteration
SUBSEQUENT APPLICATION FILED HEREWITH FOR PLUMBING WORK TYPE, INSTALLATION OF NEW PLUMBING FIXTURES, COLDAND HOT WATER PIPES AND CAPPING OF EXISTING GAS LINE, IN CONJUNCTION TO ALT JOB S00863386-I1
S00863386-S1
08/01/2023
Permit issued — Construction Fence
S08042499-S1-FN
08/01/2023
Permit issued — General Construction
S00863386-I1-GC
05/03/2023
Filed — Alteration
SUBSEQUENT APPLICATION FILED HEREWITH FOR PLUMBING WORK TYPE, INSTALLATION OF NEW PLUMBING FIXTURES, COLDAND HOT WATER PIPES AND CAPPING OF EXISTING GAS LINE, IN CONJUNCTION TO ALT JOB S00863386-I1
S00863386-I1
03/14/2023
Filed — Alteration
APPLICATION FILED FOR HORIZONTAL ENLARGEMENT OFEXISTING TWO-FAMILY RESIDENTIAL BUILDING. MINOR PARTITIONING AS PER PLANS. LEGALIZATION OF WORK WITHOUT PERMIT AS PER D.O.B.VIOLATION #22-01952 NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S08042499-S1
11/29/2022
Filed — Alteration
APPLICATION FILED FOR HORIZONTAL ENLARGEMENT OFEXISTING TWO-FAMILY RESIDENTIAL BUILDING. MINOR PARTITIONING AS PER PLANS. LEGALIZATION OF WORK WITHOUT PERMIT AS PER D.O.B.VIOLATION #22-01952 NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S08042499-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedBEST MECHANICAL SVCS INC08/20/2026
DOB NOWPlumbingPermit IssuedBEST MECHANICAL SVCS INC05/01/2025
DOB NOWConstruction FencePermit IssuedSOHO CONSTRUCTION MANAGEM08/01/2023
DOB NOWGeneral ConstructionPermit IssuedSOHO CONSTRUCTION MANAGEM08/01/2023
1 project · most recent 02/05/2026
Gas Water/Sanitary
FiledStatusContractorScope
02/05/2026Permit IssuedBEST MECHANICAL SVCS INCGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
06/12/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/27/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/02/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/25/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/12/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/09/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
02/17/2026Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
02/17/2026Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
02/17/2026HVAC-R and service water piping design and insulationMOHAMED MAHMOUDenergy_progress
02/17/2026HVAC-R and service water heating system controlsMOHAMED MAHMOUDenergy_progress
02/17/2026HVAC-R and service water heating equipmentMOHAMED MAHMOUDenergy_progress
02/03/2026HVAC-R and service water piping design and insulationMOHAMED MAHMOUDenergy_progress
02/03/2026HVAC-R and service water heating equipmentMOHAMED MAHMOUDenergy_progress
02/03/2026HVAC-R and service water heating system controlsMOHAMED MAHMOUDenergy_progress
02/03/2026Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
02/03/2026Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
05/03/2023Fenestration and door U-factor and product ratingsNANIK MASSANDenergy_progress
05/03/2023Fenestration air leakageNANIK MASSANDenergy_progress
05/03/2023Insulation placement and R valuesNANIK MASSANDenergy_progress
05/03/2023Air barrier — testing NANIK MASSANDenergy_progress
05/03/2023Air barrier - visual inspectionNANIK MASSANDenergy_progress
05/03/2023Interior lighting powerNANIK MASSANDenergy_progress
04/28/2023Concrete - Cast-In-PlaceNANIK MASSANDspecial
04/28/2023Structural Stability – Alterations of existing buildingsNANIK MASSANDspecial
04/28/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationNANIK MASSANDspecial
04/28/2023Energy Code Compliance InspectionsNANIK MASSANDprogress
04/28/2023Fire-Resistance Rated ConstructionNANIK MASSANDprogress
04/28/2023Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
04/28/2023Exterior Insulation and Finish Systems (EIFS)NANIK MASSANDspecial
04/21/2023FinalKevin McCrayprogress
11/21/2022Concrete - Cast-In-Place—special
Latest 25 of 32.
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026S08042499-S1Request digital key ↗
08/22/2026S00863386-P1Request digital key ↗
08/22/2026S00863386-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S08042499-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S08042499-I1Open ↗
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026S00863386-I1Open ↗
09/01/2026S00863386-I1Open ↗
09/01/2026S00863386-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/23/2026S08042499-S1Open ↗
08/23/2026S08042499-I1Open ↗
08/22/2026S00863386-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026S00863386-I1Open ↗
09/01/2026S00863386-I1Open ↗
08/26/2026S00863386-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/22/2026S00863386-P1Open ↗
08/22/2026S00863386-I1Open ↗
08/22/2026S00863386-S1Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/13/2026S08042499-I1Open ↗
▸Other Documents3
▸DOB NOWPlot Diagram1
08/13/2026S08042499-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S08042499-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S08042499-I1Open ↗