← Back
Condo, residential unit in 1-3 story building
72 RUMSON ROAD
STATEN ISLAND · BIN 5121165
💬 Discuss this project
1978Year Built
2Stories
R3Building Class
R3-2Zoning
128,389 sfGross Floor Area
112Units
3 Open Violations ▸FDNY Report ↗
Condo, residential unit in 1-3 story building · 359,136 sf lot · 0.36 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 23p · 1 filing · 17 docs
Floor 12p · 1 filing · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
IMPACT REAL ESTATE MANAGEMENT703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOHN P. FOX, ARCHITECT, PC.502/15/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CORNERSTONE CONSULTING503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J. CAIAZZO PLBG & HTG CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
O'ROURKE ENGINEERING, LLC5873103/26/2021
Building Lifecycle
All (20)Filed (5)Permit Issued (1)Signed Off (2)Inspection (4)Special Inspection (8)
09/30/2022
Signed off — Alteration
Installation of plumbing fixtures at existing locations
S00471725-I1
02/15/2022
Filed — Alteration
Installation of plumbing fixtures at existing locations
S00471725-P3
02/15/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN O'ROURKE
02/14/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN O'ROURKE
02/02/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/27/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/14/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/11/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/19/2021
Signed off — Alteration
Installation of gypsum wall board (at existing locations, no change) and finishes due to fire damage (no structural damage reported). Pl to be filed separately
S00471705-I1
07/16/2021
Permit issued — Plumbing
S00471725-I1-PL
04/22/2021
Filed — Alteration
Installation of plumbing fixtures at existing locations
S00471725-P2
04/21/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN O'ROURKE
04/17/2021
Filed — Alteration
Installation of plumbing fixtures at existing locations
S00471725-P1
03/26/2021
Filed — Alteration
Installation of plumbing fixtures at existing locations
S00471725-I1
03/26/2021
Filed — Alteration
Installation of gypsum wall board (at existing locations, no change) and finishes due to fire damage (no structural damage reported). Pl to be filed separately
S00471705-I1
02/17/2021
Special inspection requirement — Insulation placement and R values
BRIAN O'ROURKE
02/17/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN O'ROURKE
02/17/2021
Special inspection requirement — Interior lighting power
BRIAN O'ROURKE
02/17/2021
Special inspection requirement — Final
BRIAN O'ROURKE
02/17/2021
Special inspection requirement — Fire-Resistance Rated Construction
BRIAN O'ROURKE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJ. CAIAZZO PLBG & HTG COR07/16/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/02/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/27/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/11/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
02/15/2022HVAC-R and service water piping design and insulationBRIAN O'ROURKEenergy_progress
02/14/2022HVAC-R and service water piping design and insulationBRIAN O'ROURKEenergy_progress
04/21/2021HVAC-R and service water piping design and insulationBRIAN O'ROURKEenergy_progress
02/17/2021Insulation placement and R valuesBRIAN O'ROURKEenergy_progress
02/17/2021Fire-Resistant Penetrations and JointsBRIAN O'ROURKEspecial
02/17/2021Interior lighting powerBRIAN O'ROURKEenergy_progress
02/17/2021FinalBRIAN O'ROURKEprogress
02/17/2021Fire-Resistance Rated ConstructionBRIAN O'ROURKEprogress
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Plumbing4
08/25/2026S00471725-P2Request digital key ↗
08/25/2026S00471725-I1Request digital key ↗
08/25/2026S00471725-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
08/25/2026S00471705-I1Request digital key ↗
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature7
09/27/2026S00471725-I1Open ↗
08/28/2026S00471705-I1Open ↗
08/28/2026S00471705-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/13/2026S00471725-P2Open ↗
08/13/2026S00471725-I1Open ↗
08/13/2026S00471725-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026S00471705-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/13/2026S00471725-P1Open ↗
08/13/2026S00471725-P3Open ↗
08/13/2026S00471725-P2Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026S00471725-I1Open ↗
08/13/2026S00471705-I1Open ↗