← Back
Condo, residential unit in 1-3 story building
1215 FATHER CAPODANNO BL
STATEN ISLAND · BIN 5122939
💬 Discuss this project
0Year Built
2Stories
R3Building Class
R3-2Zoning
140,010 sfGross Floor Area
100Units
0 Open ViolationsFDNY Report ↗
Condo, residential unit in 1-3 story building · 229,000 sf lot · 0.61 FAR built · Flood zone X500
Locations of Work
Architecture
Roof1p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CMA103/22/2026
CMA 1103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NYX ENGINEERING, PLLC201/15/2024
NY BUILDING ASSOCIATES INC111/29/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PROPERTY DAMAGE RESTORATIONGeneral Contractor807/08/2026
VORTEX PLUMBING COMPANYPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NYX ENGINEERING, PLLC6118101/15/2024
NKM ENGINEERING PLLC6244111/29/2023
Building Lifecycle
All (48)Filed (3)Permit Issued (5)Signed Off (3)Violation (7)Inspection (6)Objection (16)Special Inspection (8)
04/04/2025
Violation issued (ECB, closed)
Construction
03/06/2025
Signed off — Alteration
SUBSEQUENT FILING FOR PLUMBING WORK TO REPAIR FIRE DAMAGE AT AN EXISTING TWO STORY ONE FAMILY BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00904066-S1
03/03/2025
Signed off — Alteration
SUBSEQUENT FILING FOR PLUMBING WORK TO REPAIR FIRE DAMAGE AT AN EXISTING TWO STORY ONE FAMILY BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00904066-S2
02/27/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/18/2025
Signed off — Alteration
SUBSEQUENT FILING FOR PLUMBING WORK TO REPAIR FIRE DAMAGE AT AN EXISTING TWO STORY ONE FAMILY BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00904066-I1
02/18/2025
Permit issued — General Construction
S00904066-S1-ST
02/07/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/07/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/04/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/30/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/30/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/16/2024
Permit issued — Structural
S00904066-S1-GC
07/11/2024
Permit issued — Plumbing
S00904066-S2-PL
05/17/2024
Violation issued (ECB, closed)
Construction
04/06/2024
Objection resolved — Addressed
04/03/2024
Objection resolved — Addressed
04/03/2024
Objection resolved — Addressed
04/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiao Huang
01/18/2024
Objection raised — Mechanical
01/18/2024
Objection raised — Other
01/18/2024
Objection raised — Admin
01/15/2024
Filed — Alteration
SUBSEQUENT FILING FOR PLUMBING WORK TO REPAIR FIRE DAMAGE AT AN EXISTING TWO STORY ONE FAMILY BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00904066-S2
01/05/2024
Permit issued — General Construction
S00904066-S1-GC
12/18/2023
Objection resolved — Addressed
12/18/2023
Objection resolved — Addressed
12/18/2023
Objection resolved — Addressed
12/18/2023
Objection resolved — Addressed
12/18/2023
Objection resolved — Addressed
12/11/2023
Objection raised — Energy
12/07/2023
Objection raised — Structural
12/07/2023
Objection raised — Inspections
12/07/2023
Objection raised — Structural
12/07/2023
Objection raised — Admin
11/29/2023
Filed — Alteration
SUBSEQUENT FILING FOR PLUMBING WORK TO REPAIR FIRE DAMAGE AT AN EXISTING TWO STORY ONE FAMILY BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00904066-S1
11/29/2023
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
11/08/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
11/08/2023
Special inspection requirement — Fenestration areas
NARESH MAHANGU
11/08/2023
Special inspection requirement — Fenestration air leakage
NARESH MAHANGU
11/08/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
NARESH MAHANGU
11/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
10/24/2023
Special inspection requirement — Final
YUNHO LEE
08/16/2023
Permit issued — Construction Fence
S00904066-I1-FN
08/10/2023
Filed — Alteration
SUBSEQUENT FILING FOR PLUMBING WORK TO REPAIR FIRE DAMAGE AT AN EXISTING TWO STORY ONE FAMILY BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00904066-I1
07/15/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/08/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/17/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/13/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/13/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offPROPERTY DAMAGE RESTORATI02/18/2025
DOB NOWStructuralSigned-offPROPERTY DAMAGE RESTORATI07/16/2024
DOB NOWPlumbingSigned-offVORTEX PLUMBING COMPANY07/11/2024
DOB NOWGeneral ConstructionSigned-offPROPERTY DAMAGE RESTORATI01/05/2024
DOB NOWConstruction FenceSigned-offPROPERTY DAMAGE RESTORATI08/16/2023
1 project · most recent 08/16/2024
General Wiring
FiledStatusContractorScope
08/16/2024CompleteSURE ELEC'L CONTR'G CORP.General Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/27/2025Pass-Final General Construction Non-Directive 14PassView ↗
02/07/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/30/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
04/03/2024Fire-Resistant Penetrations and JointsXiao Huangspecial
11/29/2023Energy Code Compliance InspectionsNARESH MAHANGUprogress
11/08/2023Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
11/08/2023Fenestration areasNARESH MAHANGUenergy_progress
11/08/2023Fenestration air leakageNARESH MAHANGUenergy_progress
11/08/2023Fenestration and door U-factor and product ratingsNARESH MAHANGUenergy_progress
11/08/2023Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
10/24/2023FinalYUNHO LEEprogress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026S00904066-S1Request digital key ↗
08/21/2026S00904066-I1Request digital key ↗
08/21/2026S00904066-S2Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026S00904066-I1Open ↗
08/21/2026S00904066-S2Open ↗
08/21/2026S00904066-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026S00904066-S1Open ↗
08/23/2026S00904066-S1Open ↗
08/23/2026S00904066-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026S00904066-S2Open ↗
08/23/2026S00904066-S1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026S00904066-S2Open ↗
08/21/2026S00904066-S1Open ↗