← Back
One family attached or semi-detached
117 SUMNER PLACE
STATEN ISLAND · BIN 5123232
💬 Discuss this project
1995Year Built
2Stories
A5Building Class
R3-2Zoning
1,220 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 1,914 sf lot · 0.64 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 07/14/2025
Gas Water/Sanitary
FiledStatusContractorScope
07/14/2025——Gas, Water/Sanitary
1 job · most recent 10/20/2025
General Wiring
FiledStatusContractorScope
10/20/2025CompleteSAMMY ELECTRIC SVCS CORPGeneral Wiring
Building Lifecycle
All (19)Filed (2)Permit Issued (2)Signed Off (1)Violation (1)Inspection (2)Objection (4)Special Inspection (7)
07/15/2026
Signed off — Alteration
REPLACING PLUMBING FIXTURES IN CONJUNCTION WITH INTERIOR RENOVATIONS OF EXISTING ONE FAMILY HOUSE TO REPAIR FIRE DAMAGE.
S01246534-I1
07/07/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
04/23/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/13/2026
Permit issued — General Construction
S01246534-I1-GC
09/10/2025
Permit issued — General Construction
S01246534-I1-GC
09/09/2025
Objection resolved — Addressed
08/25/2025
Objection resolved — Addressed
07/24/2025
Objection raised — Scope
07/24/2025
Objection raised — Scope
07/14/2025
Filed — Alteration
REPLACING PLUMBING FIXTURES IN CONJUNCTION WITH INTERIOR RENOVATIONS OF EXISTING ONE FAMILY HOUSE TO REPAIR FIRE DAMAGE.
S01246534-I1
07/14/2025
Filed — Alteration
REPLACING PLUMBING FIXTURES IN CONJUNCTION WITH INTERIOR RENOVATIONS OF EXISTING ONE FAMILY HOUSE TO REPAIR FIRE DAMAGE.
S01246534-S1
06/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
06/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
PAUL MARINO
06/25/2025
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
06/25/2025
Special inspection requirement — Fenestration air leakage
PAUL MARINO
06/25/2025
Special inspection requirement — Lighting in dwelling units
PAUL MARINO
06/25/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
PAUL MARINO
06/25/2025
Special inspection requirement — Permanent certificate
PAUL MARINO
12/01/2001
Violation issued (ECB, closed)
Construction
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
URENA CONSTRUCTION & DESIGN704/09/2026
HARVARD SQUARE DEVELOPMENT203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOTIR ASSOCIATES207/14/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
URENA CONST & DESIGN INCGeneral Contractor204/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENGINEERING CONSULTING SE2050207/14/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offURENA CONST & DESIGN INC03/13/2026
DOB NOWGeneral ConstructionSigned-offURENA CONST & DESIGN INC09/10/2025
BIS—ISSUEDSILLER & FARINACCI ENTERPRISES02/23/1995
BISPLISSUEDJ & S PL & HTG. INC.02/06/1995
BIS—ISSUEDSILLER & FARINACCI ENTERPRISES12/13/1993
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/07/2026Fail-Final General Construction Non-Directive 14FailView ↗
04/23/2026Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
06/25/2025Fire-Resistant Penetrations and JointsPAUL MARINOspecial
06/25/2025Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
06/25/2025Energy Code Compliance InspectionsPAUL MARINOprogress
06/25/2025Fenestration air leakagePAUL MARINOenergy_progress
06/25/2025Lighting in dwelling unitsPAUL MARINOenergy_progress
06/25/2025Fenestration and door U-factor and product ratingsPAUL MARINOenergy_progress
06/25/2025Permanent certificatePAUL MARINOenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/19/2026S01246534-S1Request digital key ↗
08/19/2026S01246534-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWRestrictive Declaration/Easement 11
08/13/2026S01246534-S1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026S01246534-I1Open ↗
08/13/2026S01246534-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/22/2026S01246534-I1Open ↗
08/22/2026S01246534-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/22/2026S01246534-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026S01246534-S1Open ↗
08/13/2026S01246534-I1Open ↗