← Back
Condo, residential building (private elevator/walk-up) [derived]
119 POND WAY
STATEN ISLAND · BIN 5124472
💬 Discuss this project
0Year Built
—Stories
RDBuilding Class
R3-2Zoning
145,560 sfGross Floor Area
134Units
Rent Stabilized101 Open Violations 99 unresolved · 2 paperwork only ▸FDNY Report ↗
Condo, residential building (private elevator/walk-up) [derived] · 181,000 sf lot · 0.8 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 24p · 2 filings · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CRM MANAGEMENT SERVICES1607/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THOMAS J. CURRO ARCHITECT, PC603/10/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M. MARIN RESTORATION INCGeneral Contractor203/21/2026
WATERMARK PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS J. CURRO ARCHITECT718603/10/2022
Building Lifecycle
All (21)Filed (6)Permit Issued (2)Signed Off (2)Inspection (3)Special Inspection (8)
05/02/2022
Signed off — Alteration
S00538398-I1
05/02/2022
Signed off — Alteration
PLUMBING WORK FOR REPLACEMENT OF EXISTING PLUMBING FIXTURES ON EXISTING ROUGHING IN CONJUNCTION WITH DOBNOW JOB S00538398. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00538406-I1
03/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
THOMAS CURRO
03/11/2022
Special inspection requirement — Energy Code Compliance Inspections
THOMAS CURRO
03/10/2022
Filed — Alteration
PLUMBING WORK FOR REPLACEMENT OF EXISTING PLUMBING FIXTURES ON EXISTING ROUGHING IN CONJUNCTION WITH DOBNOW JOB S00538398. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00538406-P4
02/25/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/16/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/14/2022
Filed — Alteration
PLUMBING WORK FOR REPLACEMENT OF EXISTING PLUMBING FIXTURES ON EXISTING ROUGHING IN CONJUNCTION WITH DOBNOW JOB S00538398. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00538406-P3
02/08/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/08/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
THOMAS CURRO
02/08/2022
Special inspection requirement — Energy Code Compliance Inspections
THOMAS CURRO
01/31/2022
Filed — Alteration
PLUMBING WORK FOR REPLACEMENT OF EXISTING PLUMBING FIXTURES ON EXISTING ROUGHING IN CONJUNCTION WITH DOBNOW JOB S00538398. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00538406-P2
01/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
THOMAS CURRO
01/28/2022
Special inspection requirement — Energy Code Compliance Inspections
THOMAS CURRO
01/20/2022
Filed — Alteration
PLUMBING WORK FOR REPLACEMENT OF EXISTING PLUMBING FIXTURES ON EXISTING ROUGHING IN CONJUNCTION WITH DOBNOW JOB S00538398. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00538406-P1
01/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
THOMAS CURRO
01/07/2022
Special inspection requirement — Energy Code Compliance Inspections
THOMAS CURRO
12/01/2021
Permit issued — Plumbing
S00538406-I1-PL
07/21/2021
Permit issued — General Construction
S00538398-I1-GC
07/08/2021
Filed — Alteration
S00538398-I1
07/08/2021
Filed — Alteration
PLUMBING WORK FOR REPLACEMENT OF EXISTING PLUMBING FIXTURES ON EXISTING ROUGHING IN CONJUNCTION WITH DOBNOW JOB S00538398. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00538406-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offWATERMARK PLUMBING CORP12/01/2021
DOB NOWGeneral ConstructionSigned-offM. MARIN RESTORATION INC07/21/2021
1 project · most recent 08/31/2021
General Wiring
FiledStatusContractorScope
08/31/2021Permit IssuedV. VASS ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/25/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/16/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/08/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
03/11/2022Fire-Resistant Penetrations and JointsTHOMAS CURROspecial
03/11/2022Energy Code Compliance InspectionsTHOMAS CURROprogress
02/08/2022Fire-Resistant Penetrations and JointsTHOMAS CURROspecial
02/08/2022Energy Code Compliance InspectionsTHOMAS CURROprogress
01/28/2022Fire-Resistant Penetrations and JointsTHOMAS CURROspecial
01/28/2022Energy Code Compliance InspectionsTHOMAS CURROprogress
01/07/2022Fire-Resistant Penetrations and JointsTHOMAS CURROspecial
01/07/2022Energy Code Compliance InspectionsTHOMAS CURROprogress
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026S00538398-I1Request digital key ↗
08/24/2026S00538406-P1Request digital key ↗
08/24/2026S00538406-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026S00538398-I1Open ↗
08/24/2026S00538406-P3Open ↗
08/24/2026S00538406-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/18/2026S00538406-P2Open ↗
09/01/2026S00538406-I1Open ↗
08/31/2026S00538406-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/18/2026S00538406-P2Open ↗
09/01/2026S00538406-I1Open ↗
08/31/2026S00538406-P3Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/25/2026S00538398-I1Open ↗
08/24/2026S00538406-P4Open ↗
08/24/2026S00538406-P3Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00538398-I1Open ↗