← Back
One family attached or semi-detached
196 MAPLE PARKWAY
STATEN ISLAND · BIN 5134463
💬 Discuss this project
2003Year Built
2Stories
A5Building Class
R3-2Zoning
1,210 sfGross Floor Area
1Units
One family attached or semi-detached · 1,169 sf lot · 1.04 FAR built · Flood zone X
Locations of Work
Structural
Cellar1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AMERA HOME BUILDERS403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MAR ARCHITECTURE & ENGINEERING P.C.109/15/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAR CODE INCGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MAR CODE INC.7000109/15/2021
Building Lifecycle
All (3)Filed (1)Permit Issued (1)Signed Off (1)
09/28/2021
Signed off — Alteration
Filing for the temporary shoring system to stabilize the existing structural due to the water damaged BY HURRICANE IDA to comply with the EWO, Repair the firewall and repair the damaged bearing wall, new gyp. board as per plans no change in use occupancy
S00592168-I1
09/20/2021
Permit issued — Structural
S00592168-I1-GC-CX
09/15/2021
Filed — Alteration
Filing for the temporary shoring system to stabilize the existing structural due to the water damaged BY HURRICANE IDA to comply with the EWO, Repair the firewall and repair the damaged bearing wall, new gyp. board as per plans no change in use occupancy
S00592168-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offMAR CODE INC09/20/2021
BIS—ISSUEDMAPLE DEVELOPMENT CORP.10/21/2003
BISPLISSUEDJPI PLUMBING & HEATING IN06/18/2003
BIS—ISSUEDMAPLE DEVELOPMENT CORP.06/13/2003
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
09/11/2021Structural Stability – Alterations of existing buildingsOMAR ELSHERIFspecial
09/11/2021FinalOMAR ELSHERIFprogress
09/11/2021Insulation placement and R valuesOMAR ELSHERIFenergy_progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/15/2026S00592168-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026S00592168-I1Open ↗
08/28/2026S00592168-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S00592168-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026S00592168-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00592168-I1Open ↗