← Back
Miscellaneous two family
130 CUBA AVENUE
STATEN ISLAND · BIN 5135367
💬 Discuss this project
2002Year Built
2Stories
B9Building Class
R3-1Zoning
1,226 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Miscellaneous two family · 2,525 sf lot · 0.49 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 06/18/2025
FiledStatusContractorScope
06/18/2025CompleteMAK ELECTRICAL CONTR CORP1 meters
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (4)
03/06/2026
Signed off — Alteration
ROOFTOP SOLAR PANEL INSTALLATION
S01240955-I1
06/25/2025
Permit issued — Solar
S01240955-I1-SL
06/20/2025
Filed — Alteration
ROOFTOP SOLAR PANEL INSTALLATION
S01240955-I1
06/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
06/13/2025
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
06/13/2025
Special inspection requirement — Final
VYACHESLAV NECHAYEV
06/13/2025
Special inspection requirement — Air barrier - visual inspection
VYACHESLAV NECHAYEV
03/28/1991
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ETRECTE LLC106/20/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRIOT ENERGY SOLUTIONS CORP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAK ELECTRICAL CONTR CORPElectrical103/22/2026
PATRIOT ENERGY SOL COGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETRECTE LLC8116106/20/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offPATRIOT ENERGY SOL CO06/25/2025
BIS—ISSUEDFAS BUILDING CORP06/25/2002
BISEQISSUEDFAS BUILDING CORP06/25/2002
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
06/13/2025Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
06/13/2025Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
06/13/2025FinalVYACHESLAV NECHAYEVprogress
06/13/2025Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026S01240955-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026S01240955-I1Open ↗
08/23/2026S01240955-I1Open ↗
08/23/2026S01240955-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01240955-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026S01240955-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01240955-I1Open ↗