← Back
Three families
40 CASSIDY PLACE
STATEN ISLAND · BIN 5142323
💬 Discuss this project
1915Year Built
3Stories
C0Building Class
R3XZoning
3,110 sfGross Floor Area
3Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Three families · Owner of record: 2 PLUS MANAGEMENT LLC · 4,584 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 21p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
M JORDAN GENERAL CONTRACTING1807/08/2026
2 PLUS MANAGEMENT LLC103/22/2026
M.JORDAN LLC103/22/2026
R&A CONSTRUCTION SERVICES INC.403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RYAN DESIGN ARCHITECTURE701/17/2025
AP PROFESSIONAL ENGINEERING PLLC107/17/2023
ASHRAF CORP110/03/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LARGIME MUJOVIC303/21/2026
SANDEEP KAUR103/21/2026
ABC PERMIT EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M. JORDAN GENERAL CONTRACTINGGeneral Contractor507/08/2026
R&A CONSTR SERVICES INCGeneral Contractor303/21/2026
MARK CONTRACTING NY INCGeneral Contractor203/21/2026
RIDGE ELECTRIC CORP.Electrical103/22/2026
FLOW-RIGHT PLBG & HTG CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RYAN DESIGN ARCHITECTURE7159601/17/2025
Building Lifecycle
All (136)Filed (9)Permit Issued (5)Signed Off (5)Violation (60)Inspection (8)Objection (28)Special Inspection (21)
05/07/2026
Violation issued (HPD, open)
A
01/31/2025
Signed off — Alteration
PAA Minor interior changes
S00901272-I1
01/30/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/17/2025
Filed — Alteration
PAA Minor interior changes
S00901272-P4
01/08/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/10/2024
Objection resolved — Addressed
12/10/2024
Objection resolved — Addressed
12/10/2024
Objection resolved — Addressed
12/10/2024
Objection resolved — Addressed
12/09/2024
Objection raised — Other
12/09/2024
Objection raised — Other
12/09/2024
Objection raised — Other
12/09/2024
Objection raised — Other
12/02/2024
Filed — Alteration
PAA Minor interior changes
S00901272-P3
11/26/2024
Signed off — Alteration
S00916227-I1
11/26/2024
Signed off — Alteration
PAA Minor interior changes
S00901272-S1
11/25/2024
Special inspection requirement — Fenestration air leakage
Daniel Ryan
11/25/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Daniel Ryan
11/25/2024
Special inspection requirement — Energy Code Compliance Inspections
Daniel Ryan
11/25/2024
Special inspection requirement — Air barrier - visual inspection
Daniel Ryan
11/25/2024
Special inspection requirement — Fenestration areas
Daniel Ryan
11/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel Ryan
11/25/2024
Special inspection requirement — Fire-Resistance Rated Construction
Daniel Ryan
11/25/2024
Special inspection requirement — Interior lighting power
Daniel Ryan
11/22/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/22/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/13/2024
Permit issued — Curb Cut
S00916227-I1-CC
10/22/2024
Special inspection requirement — HVAC-R and service water heating system controls
Daniel Ryan
10/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel Ryan
10/22/2024
Special inspection requirement — Energy Code Compliance Inspections
Daniel Ryan
10/22/2024
Special inspection requirement — Maintenance information
Daniel Ryan
10/22/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Daniel Ryan
10/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
Daniel Ryan
09/16/2024
Filed — Alteration
PAA Minor interior changes
S00901272-P2
09/09/2024
Special inspection requirement — Maintenance information
Daniel Ryan
09/09/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Daniel Ryan
09/09/2024
Special inspection requirement — HVAC-R and service water heating equipment
Daniel Ryan
09/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel Ryan
09/09/2024
Special inspection requirement — HVAC-R and service water heating system controls
Daniel Ryan
09/09/2024
Special inspection requirement — Energy Code Compliance Inspections
Daniel Ryan
09/05/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/08/2024
Filed — Alteration
PAA Minor interior changes
S00901272-P1
07/30/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/20/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/05/2024
Permit issued — General Construction
S00901272-I1-GC
04/05/2024
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
S00904145-I1
03/06/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/01/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/24/2023
Permit issued — Plumbing
S00901272-S1-PL
10/18/2023
Permit issued — General Construction
S00901272-I1-GC
10/03/2023
Objection resolved — Addressed
10/03/2023
Objection resolved — Addressed
09/25/2023
Objection raised — Scope
09/25/2023
Objection raised — Other
09/20/2023
Filed — Alteration
PAA Minor interior changes
S00901272-S1
09/08/2023
Objection resolved — Addressed
09/08/2023
Objection resolved — Addressed
08/28/2023
Filed — Alteration
S00916227-I1
08/28/2023
Objection resolved — Addressed
08/28/2023
Objection resolved — Addressed
Latest 60 of 136 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offM. JORDAN GENERAL CONTRAC11/13/2024
DOB NOWGeneral ConstructionSigned-offM. JORDAN GENERAL CONTRAC06/05/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR10/24/2023
DOB NOWGeneral ConstructionSigned-offM. JORDAN GENERAL CONTRAC10/18/2023
DOB NOWGeneral ConstructionSigned-offMARK CONTRACTING NY INC10/18/2021
3 projects · most recent 07/28/2024
General Wiring
FiledStatusContractorScope
07/28/2024CompleteRIDGE ELECTRIC CORP.General Wiring
07/29/2023CompleteBDS ELECTRIC CORP.—
07/24/2023CancelledHIGH QUALITY ELECTRIC OF—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
01/30/2025Pass-Final General Construction Non-Directive 14PassView ↗
01/08/2025Fail-Final General Construction Non-Directive 14FailView ↗
11/22/2024Fail-Final General Construction Non-Directive 14FailView ↗
11/22/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
09/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/30/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
11/25/2024Fenestration air leakageDaniel Ryanenergy_progress
11/25/2024Fenestration and door U-factor and product ratingsDaniel Ryanenergy_progress
11/25/2024Energy Code Compliance InspectionsDaniel Ryanprogress
11/25/2024Air barrier - visual inspectionDaniel Ryanenergy_progress
11/25/2024Fenestration areasDaniel Ryanenergy_progress
11/25/2024Fire-Resistant Penetrations and JointsDaniel Ryanspecial
11/25/2024Fire-Resistance Rated ConstructionDaniel Ryanprogress
11/25/2024Interior lighting powerDaniel Ryanenergy_progress
10/22/2024HVAC-R and service water heating system controlsDaniel Ryanenergy_progress
10/22/2024Fire-Resistant Penetrations and JointsDaniel Ryanspecial
10/22/2024Energy Code Compliance InspectionsDaniel Ryanprogress
10/22/2024Maintenance informationDaniel Ryanenergy_progress
10/22/2024HVAC-R and service water piping design and insulationDaniel Ryanenergy_progress
10/22/2024HVAC-R and service water heating equipmentDaniel Ryanenergy_progress
09/09/2024Maintenance informationDaniel Ryanenergy_progress
09/09/2024HVAC-R and service water piping design and insulationDaniel Ryanenergy_progress
09/09/2024HVAC-R and service water heating equipmentDaniel Ryanenergy_progress
09/09/2024Fire-Resistant Penetrations and JointsDaniel Ryanspecial
09/09/2024HVAC-R and service water heating system controlsDaniel Ryanenergy_progress
09/09/2024Energy Code Compliance InspectionsDaniel Ryanprogress
09/05/2021FinalJay Kaviprogress
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/25/2026S00588999-I1Request digital key ↗
08/23/2026S00901272-P3Request digital key ↗
08/23/2026S00901272-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature13
08/24/2026S00901272-P3Open ↗
08/24/2026S00901272-P3Open ↗
08/24/2026S00588999-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/23/2026S00904145-I1Open ↗
08/22/2026S00916227-I1Open ↗
08/13/2026S00588999-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/24/2026S00901272-P3Open ↗
08/24/2026S00901272-S1Open ↗
08/24/2026S00901272-P2Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026S00901272-P3Open ↗
08/13/2026S00901272-P4Open ↗
08/13/2026S00901272-I1Open ↗
Showing 3 of 4 on file for this type