← Back
Hospital, sanitarium, mental institution
The Empire Condominium
501 SEAVIEW AVENUE · BIN 5146762
💬 Discuss this project
2006Year Built
3Stories
I1Building Class
R3-1Zoning
48,954 sfGross Floor Area
10Units
2 Open Violations ▸FDNY Report ↗
Hospital, sanitarium, mental institution · Owner of record: STATEN ISLAND UNIVERSITY HOSPITAL · 16,427 sf lot · 2.98 FAR built · Flood zone X500
Locations of Work
Architecture
Roof1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NORTHWELL HEALTH809/10/2026
KWAPICH CONSTRUCTION303/22/2026
STATEN ISLAND UNIVERSITY HOSPITAL103/22/2026
NEB CONTRACTING103/22/2026
EMPIRE CONDOMINIUM203/21/2026
SEAVIEW CARDIO REALTY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A TECH ENGINEERING NYC, PLLC.508/26/2026
AM ARCHITECT'S STUDIO LLC103/17/2022
JOSEPH K. BLUM CO. LLP101/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A TECH ENGINEERING NYC403/21/2026
S M EXPEDITING203/21/2026
D D EXPEDITORS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MVS HEATING & AIR CONDITGeneral Contractor409/10/2026
NATIONWIDE CONTRACTORS INCGeneral Contractor203/21/2026
SALVATORE CALCAGNO CONSTGeneral Contractor203/21/2026
UTELL & SON ELEC'L CONT.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738508/26/2026
AM DESIGN STUDIO LLC4413103/17/2022
Building Lifecycle
All (33)Filed (7)Permit Issued (6)Signed Off (6)Violation (13)Inspection (1)
09/14/2026
Signed off — Alteration
S01429428-I1
09/09/2026
Permit issued — Mechanical Systems
S01429428-I1-MS
08/26/2026
Filed — Alteration
S01429428-I1
08/25/2026
Signed off — Alteration
DIRECT REPLACEMENT OF (4) ROOFTOP HVAC UNITS
S01429435-I1
08/19/2026
Permit issued — Mechanical Systems
S01429435-I1-MS
07/30/2026
Filed — Alteration
DIRECT REPLACEMENT OF (4) ROOFTOP HVAC UNITS
S01429435-I1
07/30/2026
Signed off — Alteration
DIRECT REPLACEMENT OF(4) ROOFTOP HVAC PACKAGE UNITS
S01429423-I1
07/24/2026
Permit issued — Mechanical Systems
S01429423-I1-MS
07/22/2026
Filed — Alteration
DIRECT REPLACEMENT OF(4) ROOFTOP HVAC PACKAGE UNITS
S01429423-I1
07/09/2026
Signed off — Alteration
DIRECT REPLACEMENT OF ROOFTOP HVAC UNITS
S01342411-I1
03/02/2026
Permit issued — Mechanical Systems
S01342411-I1-MS
02/27/2026
Filed — Alteration
DIRECT REPLACEMENT OF ROOFTOP HVAC UNITS
S01342411-I1
08/03/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/03/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/25/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
05/20/2022
Signed off — Alteration
Interior modification of walls, doors, cabinetry and related work as shown on plans. No change to occupancy, use or egress.
S00698109-I1
05/13/2022
Permit issued — General Construction
S00698109-I1-GC
03/17/2022
Filed — Alteration
Interior modification of walls, doors, cabinetry and related work as shown on plans. No change to occupancy, use or egress.
S00698109-I1
01/25/2022
Filed — Alteration
Miscellaneous repairs to facade to include minor patching, caulking and reglet (flashing).
S00639498-I1
09/20/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/07/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/07/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/15/2019
Signed off — Alteration
INSTALLATION OF (1) ROOFTOP MINI-SPLIT AIR CONDITIONING UNIT ONTO NEW MINI-SPLIT STANDS.
S00221156-I1
10/10/2019
Permit issued — Mechanical Systems
S00221156-I1-MS
10/02/2019
Filed — Alteration
INSTALLATION OF (1) ROOFTOP MINI-SPLIT AIR CONDITIONING UNIT ONTO NEW MINI-SPLIT STANDS.
S00221156-I1
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/21/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/21/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/18/2014
Violation issued (FDNY_NOV, closed)
05/30/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/06/2014
Violation issued (FDNY_NOV, closed)
08/27/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/05/2004
Violation issued (ECB, closed)
Cranes and Derricks
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMVS HEATING & AIR CONDIT09/09/2026
DOB NOWMechanical SystemsSigned-offMVS HEATING & AIR CONDIT08/19/2026
DOB NOWMechanical SystemsSigned-offMVS HEATING & AIR CONDIT07/24/2026
DOB NOWMechanical SystemsSigned-offMVS HEATING & AIR CONDIT03/02/2026
DOB NOWGeneral ConstructionSigned-offNATIONWIDE CONTRACTORS IN05/13/2022
DOB NOWMechanical SystemsSigned-offSALVATORE CALCAGNO CONST10/10/2019
BISPLISSUEDRICHMOND P & H CO., INC09/12/2016
BISOTISSUEDSALVATORE CALCAGNO CONST02/04/2016
BISMHISSUEDMVS HEATING & AIR CONDIT08/25/2011
1 project · most recent 02/27/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/27/2026Signed-offMVS HEATING & AIR CONDITHeating and Air Conditioning Systems
Heat / Cool
Luxaire KE048H12D2AAAAA1A1 49,000 BTU · Packaged Unit ×1
KE060H12D2AAAAA1A1 57,000 BTU · Packaged Unit ×1
KEH060H12D2AAAAA1A1 57,000 BTU · Packaged Unit ×1
KJ078N18R2AAAAA1A1 78,000 BTU · Packaged Unit ×1
KJ090N18R2AAAAA1A1 90,000 BTU · Packaged Unit ×1
3 projects · most recent 11/11/2022
General Wiring HVAC Wiring
FiledStatusContractorScope
11/11/2022CompleteCITI-WIDE ELECTRIC INCGeneral Wiring
06/13/2022Permit IssuedUTELL & SON ELEC'L CONT.General Wiring
09/23/2019CompleteFICHERA ELECTRIC, INCHVAC Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/25/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
07/10/2026Mechanical Systemsanthony santorospecial
07/10/2026Finalanthony santoroprogress
07/10/2026Finalanthony santoroprogress
07/10/2026Mechanical Systemsanthony santorospecial
01/05/2026Mechanical Systemsanthony santorospecial
01/05/2026Finalanthony santoroprogress
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch6
08/27/2026S01429428-I1Request digital key ↗
08/24/2026S00639498-I1Request digital key ↗
08/24/2026S00698109-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/26/2026S00221156-I1Request digital key ↗
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION3
09/13/2016520239894Open ↗
02/08/2016520239894Open ↗
08/26/2011520076471Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
07/06/2015520239894Open ↗
08/26/2011520076471Open ↗
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/27/2026S01429428-I1Open ↗
08/24/2026S00639498-I1Open ↗
08/24/2026S00698109-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
11/14/2016520239894Open ↗
02/24/2016520239894Open ↗
07/06/2015520239894Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/23/2026S01429428-I1Open ↗
09/23/2026S01342411-I1Open ↗
08/24/2026S01429435-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026S01429428-I1Open ↗
09/23/2026S01342411-I1Open ↗
08/24/2026S01429435-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/26/2011520076471Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/26/2011520076471Open ↗
▸Trade Schedules & Equipment3
▸BISEQUIPMENT USE PERMITS1
10/17/2011520076471Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/06/2015520239894Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
10/18/2011520076471Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/06/2015520239894Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/14/2016520239894Open ↗
07/06/2015520239894Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
12/02/2016520239894Open ↗
10/17/2011520076471Open ↗
▸BISTR8: Energy Code Progress Inspections1
10/04/2011520076471Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00698109-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
11/14/2016520239894Open ↗
10/04/2011520076471Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
07/06/2015520239894Open ↗
08/26/2011520076471Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
11/14/2016520239894Open ↗
08/06/2015520239894Open ↗
07/06/2015520239894Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
07/06/2015520239894Open ↗
08/26/2011520076471Open ↗
▸BISADDITIONAL INFORMATION1
08/25/2016520239894Open ↗