← Back
Miscellaneous utility property
MERSEREAU AVENUE
STATEN ISLAND · BIN 5155178
💬 Discuss this project
0Year Built
—Stories
U9Building Class
R3-2Zoning
0 sfGross Floor Area
0Units
Miscellaneous utility property · 17,916 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 20 docs
CellarUnder Construction46p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY DEPT OF ENVIRONMENTA203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BELFIORE DEVELOPMENT GROUP403/21/2026
HDR203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOHN P PICONE INCGeneral Contractor407/08/2026
CIVETTA COUSINS JV, L.L.CGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC LOGISTICS DBA JPCL EN351308/18/2025
Building Lifecycle
All (43)Filed (6)Permit Issued (4)Objection (3)Special Inspection (30)
06/15/2026
Permit issued — Supported Scaffold
S01406091-I1-SF
06/11/2026
Filed — Alteration
INSTALLATION AND USE OF TEMPORARY SCAFFOLD AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S01406091-I1
06/02/2026
Permit issued — General Construction
S01125296-I1-GC
02/20/2026
Permit issued — Foundation
S01093731-I1-GC-CX
09/04/2025
Permit issued — General Construction
S01125296-I1-GC
08/25/2025
Special inspection requirement — Structural Steel - Details
Asma Hashmi
08/25/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Asma Hashmi
08/25/2025
Special inspection requirement — Concrete - Cast-In-Place
Asma Hashmi
08/25/2025
Special inspection requirement — Subgrade Inspections
Asma Hashmi
08/25/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Asma Hashmi
08/25/2025
Special inspection requirement — Masonry
Asma Hashmi
08/25/2025
Special inspection requirement — Structural Steel - Welding
Asma Hashmi
08/25/2025
Special inspection requirement — Post-installed Anchors
Asma Hashmi
08/25/2025
Special inspection requirement — Footing and Foundation
Asma Hashmi
08/25/2025
Special inspection requirement — Final
Asma Hashmi
08/18/2025
Filed — Alteration
Foundation work pertaining to manhole and catch basin. Structural work to existing building being altered to serve as a below grade tank for sewage.
S01093731-P1
08/18/2025
Special inspection requirement — Concrete - Cast-In-Place
Asma Hashmi
08/18/2025
Special inspection requirement — Masonry
Asma Hashmi
08/18/2025
Special inspection requirement — Post-installed Anchors
Asma Hashmi
08/18/2025
Special inspection requirement — Structural Steel - Details
Asma Hashmi
08/18/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Asma Hashmi
08/18/2025
Special inspection requirement — Structural Steel - Welding
Asma Hashmi
08/18/2025
Special inspection requirement — Subgrade Inspections
Asma Hashmi
08/18/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Asma Hashmi
08/18/2025
Special inspection requirement — Final
Asma Hashmi
08/18/2025
Special inspection requirement — Footing and Foundation
Asma Hashmi
07/14/2025
Special inspection requirement — Demolition
Asma Hashmi
07/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
Asma Hashmi
07/14/2025
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
07/02/2025
Filed — Alteration CO
Partial demolition of existing Mersereau Pump Building. The existing building will be altered to serve as a below grade tank for sewage, which will have no power requirement, nor heating or ventilation. There are no energy components required.
S01125296-P1
07/02/2025
Special inspection requirement — Fire-Resistance Rated Construction
07/02/2025
Special inspection requirement — Demolition
07/02/2025
Special inspection requirement — Energy Code Compliance Inspections
04/03/2025
Objection resolved — Addressed
11/29/2024
Objection raised — Scope
11/14/2024
Filed — Alteration CO
Partial demolition of existing Mersereau Pump Building. The existing building will be altered to serve as a below grade tank for sewage, which will have no power requirement, nor heating or ventilation. There are no energy components required.
S01125296-I1
10/04/2024
Filed — Alteration
Foundation work pertaining to manhole and catch basin. Structural work to existing building being altered to serve as a below grade tank for sewage.
S01093731-I1
07/09/2024
Objection raised — Scope
06/20/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Partial demolition of existing Mersereau Pump Building. The existing building will be altered to serve as a below grade tank for sewage, which will have no power requirement, nor heating or ventilation. There are no energy components required.
S00983642-I1
12/29/2023
Special inspection requirement — Energy Code Compliance Inspections
12/29/2023
Special inspection requirement — Demolition
12/29/2023
Special inspection requirement — Concrete - Cast-In-Place
12/29/2023
Special inspection requirement — Final
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedCIVETTA COUSINS JV, L.L.C06/15/2026
DOB NOWGeneral ConstructionPermit IssuedJOHN P PICONE INC06/02/2026
DOB NOWFoundationPermit IssuedJOHN P PICONE INC02/20/2026
DOB NOWGeneral ConstructionPermit IssuedJOHN P PICONE INC09/04/2025
2 projects · most recent 04/14/2026
FiledStatusContractorScope
04/14/2026Permit IssuedGILSTON ELEC'L CONTNG LLC1 meters, 1 new_meters
02/06/2025Permit IssuedGILSTON ELEC'L CONTNG LLC—
2 projects · most recent 08/18/2025
Concrete Steel Masonry
FiledStatusContractorScope
08/18/2025Permit IssuedJOHN P PICONE INCSteel, Concrete, Masonry
06/20/2024——Concrete
1 project · most recent 06/11/2026
Scaffold
FiledStatusContractorScope
06/11/2026Permit IssuedCIVETTA COUSINS JV, L.L.CScaffold
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
08/25/2025Structural Steel - DetailsAsma Hashmispecial
08/25/2025Structural Steel - High Strength BoltingAsma Hashmispecial
08/25/2025Concrete - Cast-In-PlaceAsma Hashmispecial
08/25/2025Subgrade InspectionsAsma Hashmispecial
08/25/2025Subsurface Conditions – Fill Placement & In-Place DensityAsma Hashmispecial
08/25/2025MasonryAsma Hashmispecial
08/25/2025Structural Steel - WeldingAsma Hashmispecial
08/25/2025Post-installed AnchorsAsma Hashmispecial
08/25/2025Footing and FoundationAsma Hashmiprogress
08/25/2025FinalAsma Hashmiprogress
08/18/2025Concrete - Cast-In-PlaceAsma Hashmispecial
08/18/2025MasonryAsma Hashmispecial
08/18/2025Post-installed AnchorsAsma Hashmispecial
08/18/2025Structural Steel - DetailsAsma Hashmispecial
08/18/2025Structural Steel - High Strength BoltingAsma Hashmispecial
08/18/2025Structural Steel - WeldingAsma Hashmispecial
08/18/2025Subgrade InspectionsAsma Hashmispecial
08/18/2025Subsurface Conditions – Fill Placement & In-Place DensityAsma Hashmispecial
08/18/2025FinalAsma Hashmiprogress
08/18/2025Footing and FoundationAsma Hashmiprogress
07/14/2025DemolitionAsma Hashmispecial
07/14/2025Fire-Resistance Rated ConstructionAsma Hashmiprogress
07/14/2025Energy Code Compliance InspectionsAsma Hashmiprogress
07/02/2025Fire-Resistance Rated Construction—progress
07/02/2025Demolition—special
Latest 25 of 31.
▾Documents — 82 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/21/2026S00983642-I1Request digital key ↗
08/19/2026S01125296-P1Request digital key ↗
08/18/2026S01093731-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits4
▸DOB NOWDEP Stormwater Construction Permit2
08/13/2026S01125296-P1Open ↗
08/13/2026S01125296-I1Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
12/06/2024540265327Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
02/12/2025540265327Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/13/2026S00983642-I1Open ↗
08/13/2026S01125296-I1Open ↗
08/13/2026S01125296-P1Open ↗
▸Seals & Professional Certifications42
▸DOB NOWSpecial Inspector Seal & Signature25
09/01/2026S01093731-P1Open ↗
09/01/2026S01093731-P1Open ↗
09/01/2026S01093731-P1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026S01093731-P1Open ↗
09/01/2026S01093731-P1Open ↗
08/30/2026S01093731-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026S00983642-I1Open ↗
08/19/2026S01125296-P1Open ↗
08/19/2026S01125296-I1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/06/2024540265327Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/06/2024540265327Open ↗
▸Safety & Tenant Protection6
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026S01125296-I1Open ↗
08/13/2026S00983642-I1Open ↗
▸DOB NOWStreet Tree Checklist2
08/19/2026S01125296-P1Open ↗
08/15/2026S01125296-I1Open ↗
▸DOB NOWStreet Trees Site Plan2
08/13/2026S00983642-I1Open ↗
08/13/2026S01125296-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/19/2026S01125296-P1Open ↗
08/15/2026S01125296-I1Open ↗
08/13/2026S01093731-P1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports1
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
02/12/2025540265327Open ↗
▸Approvals, Objections & Sign-offs7
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/19/2026S01125296-P1Open ↗
08/15/2026S01125296-I1Open ↗
08/13/2026S00983642-I1Open ↗
Showing 3 of 6 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
02/12/2025540265327Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
12/06/2024540265327Open ↗
▸Other Documents6
▸BISBPP - SUPPORTING DOCUMENTATION3
02/12/2025540265327Open ↗
02/12/2025540265327Open ↗
02/12/2025540265327Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
02/12/2025540265327Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
02/12/2025540265327Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026S00983642-I1Open ↗