| Owner | Filings | Most Recent |
|---|---|---|
| ARBUTUS HYLAN REALTY | 2 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| A TECH ENGINEERING NYC, PLLC. | 1 | 09/04/2026 |
| RAMPULLA ASSOCIATES ARCHITECTS, LLP | 4 | 08/06/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| MASTER BUILT HOMES INC | General Contractor | 3 | 09/07/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| A TECH ENGINEERING NYC, P | 6738 | 1 | 03/27/2026 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Structural | Permit Issued | MASTER BUILT HOMES INC | 09/03/2026 |
| DOB NOW | Structural | Permit Issued | MASTER BUILT HOMES INC | 09/03/2026 |
| DOB NOW | Construction Fence | Permit Issued | MASTER BUILT HOMES INC | 08/18/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/06/2026 | Permit Issued | MASTER BUILT HOMES INC | Heating and Air Conditioning Systems | Heat / Cool |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/06/2026 | Permit Issued | MASTER BUILT HOMES INC | Wood |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/06/2026 | Permit Issued | MASTER BUILT HOMES INC | Fence |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/28/2026 | Demolition | — | special |
| 08/28/2026 | Structural Stability – Alterations of existing Buildings | — | special |
| 08/06/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 03/16/2026 | Fire-Resistant Penetrations and Joints | anthony santoro | special |
| 03/16/2026 | Heating Systems | anthony santoro | special |
| 03/16/2026 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | anthony santoro | special |
| 03/16/2026 | Structural Steel - Details | anthony santoro | special |
| 03/16/2026 | Structural Steel - Welding | anthony santoro | special |
| 03/16/2026 | Wood – Prefabricated I-Joists | anthony santoro | special |
| 03/16/2026 | Subsurface Investigations (Borings/Test Pits) | anthony santoro | special |
| 03/16/2026 | Maintenance information | anthony santoro | energy_progress |
| 03/16/2026 | Concrete - Cast-In-Place | anthony santoro | special |
| 03/16/2026 | Exterior Insulation and Finish Systems (EIFS) | anthony santoro | special |
| 03/16/2026 | Interior lighting power | anthony santoro | energy_progress |
| 03/16/2026 | Air barrier - visual inspection | anthony santoro | energy_progress |
| 03/16/2026 | Ventilation and air distribution system | anthony santoro | energy_progress |
| 03/16/2026 | Electric vehicle service equipment requirements | anthony santoro | energy_progress |
| 03/16/2026 | Energy Code Compliance Inspections | anthony santoro | progress |
| 03/16/2026 | Fire-Resistance Rated Construction | anthony santoro | progress |
| 03/16/2026 | Structural Wood Frame | anthony santoro | progress |
| 03/16/2026 | HVAC-R and service water heating equipment | anthony santoro | energy_progress |
| 03/16/2026 | Fenestration air leakage | anthony santoro | energy_progress |
| 03/16/2026 | Insulation placement and R values | anthony santoro | energy_progress |
| 03/16/2026 | HVAC-R and service water heating system controls | anthony santoro | energy_progress |
| 03/16/2026 | Air barrier — testing | anthony santoro | energy_progress |