← Back
Walk-up cooperative
302 SKYLINE DRIVE
STATEN ISLAND · BIN 5164701
💬 Discuss this project
2000Year Built
2Stories
C6Building Class
R3-2Zoning
17,799 sfGross Floor Area
9Units
5 Open Violations ▸FDNY Report ↗
Walk-up cooperative · 11,750 sf lot · 1.51 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M-CON ENGINEERING, PC102/10/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUSTAINABLE STRATEGIESGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
M-CON ENGINEERING7341102/10/2025
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
05/09/2025
Signed off — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
S01178171-I1
02/26/2025
Permit issued — Solar
S01178171-I1-SL
02/10/2025
Filed — Alteration
INSTALLATION OF SOLAR ELECTRIC GENERATION SYSTEM FOR UTILITY INTERCONNECTION
S01178171-I1
02/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michelle Contri
02/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michelle Contri
02/07/2025
Special inspection requirement — Energy Code Compliance Inspections
Michelle Contri
02/07/2025
Special inspection requirement — Final
Michelle Contri
02/07/2025
Special inspection requirement — Air barrier - visual inspection
Michelle Contri
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUSTAINABLE STRATEGIES02/26/2025
1 project · most recent 02/07/2025
FiledStatusContractorScope
02/07/2025CompleteSOURCE ELECTRIC INC1 meters
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
02/07/2025Fire-Resistant Penetrations and JointsMichelle Contrispecial
02/07/2025Structural Stability – Alterations of existing buildingsMichelle Contrispecial
02/07/2025Energy Code Compliance InspectionsMichelle Contriprogress
02/07/2025FinalMichelle Contriprogress
02/07/2025Air barrier - visual inspectionMichelle Contrienergy_progress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026S01178171-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/31/2026S01178171-I1Open ↗
08/31/2026S01178171-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/20/2026S01178171-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/31/2026S01178171-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01178171-I1Open ↗