← Back
Zoned residential, not Manhattan
MILBURN STREET
STATEN ISLAND · BIN 5166368
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R2Zoning
0 sfGross Floor Area
0Units
Zoned residential, not Manhattan · Owner of record: BLOCK 950 REALTY CORP. · 3,360 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Floor 211p · 1 filing · 20 docs
Floor 110p · 1 filing · 20 docs
Basement10p · 1 filing · 20 docs
1 job · most recent 07/31/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/31/2023Signed-offJB BUZCO PLUMBING LLCGas, Storm, Water/Sanitary
1 job · most recent 06/22/2022
General Wiring
FiledStatusContractorScope
06/22/2022CompleteB & R ELEC'L CONTR'G, INCGeneral Wiring
1 job · most recent 07/31/2023
Concrete Wood
FiledStatusContractorScope
07/31/2023Signed-offMASTER BUILT HOMES INCConcrete, Wood
Building Lifecycle
All (62)Filed (8)Permit Issued (8)Signed Off (4)Inspection (10)Objection (2)Special Inspection (30)
05/29/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/11/2023
Signed off — Alteration
Design of wood piles with reinforced concrete combination pile cap/grade beam for a residential house.
S00527680-I1
08/09/2023
Signed off — New Building
PROPOSED INSTALLTION OF NEW 18' CURB CUT FOR NEW DETACHED ONE FAMILY RESIDENCE.
S00565305-S1
08/09/2023
Signed off — Alteration
1-1/2" DOMESTIC WITH SP TAKE OFF FOR RESIDENTIAL SPRINKLER SYSTEM
S00758113-I1
08/08/2023
Signed off — New Building
PROPOSED INSTALLTION OF NEW 18' CURB CUT FOR NEW DETACHED ONE FAMILY RESIDENCE.
S00565305-S2
08/08/2023
Permit issued — Foundation
S00527680-I1-FO
08/07/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/31/2023
Filed — New Building
PROPOSED INSTALLTION OF NEW 18' CURB CUT FOR NEW DETACHED ONE FAMILY RESIDENCE.
S00565305-P3
07/31/2023
Special inspection requirement — Fireplaces
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — Mechanical Systems
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — Subgrade Inspections
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
BRIAN ARONE
07/31/2023
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — Final
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — Footing and Foundation
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — Structural Wood Frame
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — Air barrier - visual inspection
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — Electric vehicle service equipment requirements
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — Maintenance information
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — Insulation placement and R values
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — Fenestration air leakage
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — Air barrier — testing
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — Duct leakage testing, insulation and design
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — Fenestration areas
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — Interior lighting power
WILLIAM MONTAGUE
07/31/2023
Special inspection requirement — Permanent certificate
WILLIAM MONTAGUE
07/28/2023
Filed — New Building
PROPOSED INSTALLTION OF NEW 18' CURB CUT FOR NEW DETACHED ONE FAMILY RESIDENCE.
S00565305-P2
07/28/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/19/2023
Permit issued — Curb Cut
S00565305-S2-CC
07/17/2023
Filed — New Building
PROPOSED INSTALLTION OF NEW 18' CURB CUT FOR NEW DETACHED ONE FAMILY RESIDENCE.
S00565305-S2
07/11/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/05/2023
Filed — New Building
PROPOSED INSTALLTION OF NEW 18' CURB CUT FOR NEW DETACHED ONE FAMILY RESIDENCE.
S00565305-P1
07/05/2023
Special inspection requirement — Permanent certificate
WILLIAM MONTAGUE
07/05/2023
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM MONTAGUE
07/05/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM MONTAGUE
07/05/2023
Special inspection requirement — Insulation placement and R values
WILLIAM MONTAGUE
06/28/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/25/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/23/2023
Permit issued — Plumbing
S00758113-I1-EW-SP
06/15/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/20/2023
Permit issued — Plumbing
S00565305-S1-PL
02/27/2023
Permit issued — Foundation
S00565305-I1-GC-CX
07/26/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/22/2022
Permit issued — Sprinklers
S00758113-I1-PL
06/15/2022
Filed — Alteration
1-1/2" DOMESTIC WITH SP TAKE OFF FOR RESIDENTIAL SPRINKLER SYSTEM
S00758113-I1
05/04/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/14/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/11/2022
Permit issued — Plumbing
S00565305-S1-PL
04/06/2022
Filed — New Building
PROPOSED INSTALLTION OF NEW 18' CURB CUT FOR NEW DETACHED ONE FAMILY RESIDENCE.
S00565305-S1
03/30/2022
Filed — Alteration
Design of wood piles with reinforced concrete combination pile cap/grade beam for a residential house.
S00527680-I1
02/28/2022
Permit issued — General Construction
S00565305-I1-GC-CX
10/12/2021
Objection raised — Scope
Latest 60 of 62 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EDGEGROVE PARTNERS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FATIMA FALCONETTI EXPEDITOR603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MASTER BUILT HOMES INCGeneral Contractor1203/21/2026
JB BUZCO PLUMBING LLCPlumbing307/08/2026
RIGHTWAY PLBG & HTG INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA PLANNING & EXPEDITING5677507/31/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offMASTER BUILT HOMES INC08/08/2023
DOB NOWCurb CutSigned-offMASTER BUILT HOMES INC07/19/2023
DOB NOWPlumbingSigned-offRIGHTWAY PLBG & HTG INC06/23/2023
DOB NOWPlumbingSigned-offJB BUZCO PLUMBING LLC04/20/2023
DOB NOWFoundationPermit IssuedMASTER BUILT HOMES INC02/27/2023
DOB NOWSprinklersSigned-offJB BUZCO PLUMBING LLC07/22/2022
DOB NOWPlumbingSigned-offJB BUZCO PLUMBING LLC04/11/2022
DOB NOWGeneral ConstructionPermit IssuedMASTER BUILT HOMES INC02/28/2022
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
05/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/07/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
07/28/2023Pass-Final CND-Occupancy InspectionPassView ↗
07/11/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/28/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/25/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/15/2023Pass-Final CND-Occupancy InspectionPassView ↗
07/26/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/04/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/14/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 57
DateRequirementInspectorRole
07/31/2023FireplacesWILLIAM MONTAGUEenergy_progress
07/31/2023Concrete - Cast-In-PlaceWILLIAM MONTAGUEspecial
07/31/2023Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
07/31/2023Mechanical SystemsWILLIAM MONTAGUEspecial
07/31/2023Subgrade InspectionsWILLIAM MONTAGUEspecial
07/31/2023Subsurface Conditions – Fill Placement & In-Place DensityWILLIAM MONTAGUEspecial
07/31/2023Subsurface Investigations (Borings/Test Pits)BRIAN ARONEspecial
07/31/2023Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
07/31/2023FinalWILLIAM MONTAGUEprogress
07/31/2023Fire-Resistance Rated ConstructionWILLIAM MONTAGUEprogress
07/31/2023Footing and FoundationWILLIAM MONTAGUEprogress
07/31/2023Structural Wood FrameWILLIAM MONTAGUEprogress
07/31/2023Fenestration and door U-factor and product ratingsWILLIAM MONTAGUEenergy_progress
07/31/2023Air barrier - visual inspectionWILLIAM MONTAGUEenergy_progress
07/31/2023HVAC-R and service water heating system controlsWILLIAM MONTAGUEenergy_progress
07/31/2023Electric vehicle service equipment requirementsWILLIAM MONTAGUEenergy_progress
07/31/2023Maintenance informationWILLIAM MONTAGUEenergy_progress
07/31/2023Insulation placement and R valuesWILLIAM MONTAGUEenergy_progress
07/31/2023Fenestration air leakageWILLIAM MONTAGUEenergy_progress
07/31/2023Air barrier — testing WILLIAM MONTAGUEenergy_progress
07/31/2023Duct leakage testing, insulation and designWILLIAM MONTAGUEenergy_progress
07/31/2023HVAC-R and service water piping design and insulationWILLIAM MONTAGUEenergy_progress
07/31/2023Fenestration areasWILLIAM MONTAGUEenergy_progress
07/31/2023HVAC-R and service water heating equipmentWILLIAM MONTAGUEenergy_progress
07/31/2023Interior lighting powerWILLIAM MONTAGUEenergy_progress
Latest 25 of 57.
▾Documents — 67 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/24/2026S00527680-I1Request digital key ↗
08/24/2026S00565305-P3Request digital key ↗
08/24/2026S00565305-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
07/18/2023520258783Open ↗
03/10/2016520258783Open ↗
▸BISBPP-16 - Application for waiver of curb alignment and/or sidewalk and curb1
03/11/2016520258783Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026S00565305-I1Open ↗
08/13/2026S00565305-P1Open ↗
08/13/2026S00565305-P3Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026S00565305-P3Open ↗
08/13/2026S00565305-I1Open ↗
08/13/2026S00565305-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00565305-I1Open ↗
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/24/2026S00527680-I1Open ↗
08/24/2026S00565305-P3Open ↗
08/24/2026S00565305-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/28/2026S00565305-P3Open ↗
08/28/2026S00565305-P3Open ↗
08/27/2026S00565305-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/28/2026S00565305-P3Open ↗
08/28/2026S00565305-P3Open ↗
08/27/2026S00565305-P1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026S00565305-P3Open ↗
08/13/2026S00565305-P1Open ↗
08/13/2026S00565305-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026S00565305-I1—
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/13/2026S00565305-P1Open ↗
08/13/2026S00565305-I1Open ↗
08/13/2026S00565305-P3Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00565305-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00565305-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00565305-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00565305-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT3
08/13/2026S00565305-P3Open ↗
08/13/2026S00565305-I1Open ↗
08/13/2026S00565305-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00565305-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026S00565305-I1Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026S00527680-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLetter from Homeowner for Withdrawal1
07/17/2023520258783Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/10/2016520258783Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
03/11/2016520258783Open ↗
▸BISEFILING COVER SHEET1
03/10/2016520258783Open ↗
▸Other Documents9
▸DOB NOWSite Survey: Initial3
08/13/2026S00565305-P1Open ↗
08/13/2026S00565305-I1Open ↗
08/13/2026S00565305-P3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026S00565305-I1Open ↗
08/13/2026S00565305-P1Open ↗
08/13/2026S00565305-P3Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form2
12/09/2016520258783Open ↗
04/13/2016520258783Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00565305-I1Open ↗